0% found this document useful (0 votes)
30 views1 page

Invoice No 445

This document is a tax invoice from Shri Maa Tarini Earthmovers to H.G. Infra Engineering Ltd for the sale of a LINK ASSY 20Y-70-N0090, totaling ₹11,210.00 with an applicable GST of ₹1,710.00. The invoice outlines terms and conditions, including a 24% interest charge for late payments beyond 30 days. The current balance owed by H.G. Infra Engineering Ltd is ₹15,27,087.90.

Uploaded by

abhisheky850
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Invoice No 445

This document is a tax invoice from Shri Maa Tarini Earthmovers to H.G. Infra Engineering Ltd for the sale of a LINK ASSY 20Y-70-N0090, totaling ₹11,210.00 with an applicable GST of ₹1,710.00. The invoice outlines terms and conditions, including a 24% interest charge for late payments beyond 30 days. The current balance owed by H.G. Infra Engineering Ltd is ₹15,27,087.90.

Uploaded by

abhisheky850
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Tax Invoice ORIGINAL FOR RECIPIENT

Invoice No. Date


SHRI MAA TARINI EARTHMOVERS 445 25-02-2025
SAINT RAVIDAS WARD, SARONA CHOWK, SARONA, RAIPUR
Phone no.: 9131095579 Place of supply PO number
Email: shrimaatariniearthmovers@gmail.com 37-Andhra Pradesh 11206379
GSTIN: 22ABPPJ3109F1Z1
State: 22-Chhattisgarh

Bill To Ship To
RAMBADRAMPURAM
H.G INFRA ENGINEERING LTD
27-3-181/1 Aguru Street , Revenue War No.5 Saluru
GSTIN : 37AABCH2668B1ZT

State: 37-Andhra Pradesh

# Item name HSN/ SAC Quantity Unit Price/ Unit GST Amount

1 LINK ASSY 20Y-70-N0090 8431 1 Pcs ₹ 9,500.00 ₹ 1,710.00 (18%) ₹ 11,210.00

Total 1 ₹ 1,710.00 ₹ 11,210.00

Invoice Amount in Words Amounts

Eleven Thousand Six Hundred Eighty Two Rupees only Sub Total ₹ 11,210.00
Shipping (incl. 18% IGST): ₹ 472.00

Total ₹ 11,682.00

Received ₹ 0.00

Balance ₹ 11,682.00

Previous Balance ₹ 15,15,405.90


Current Balance ₹ 15,27,087.90

IGST
HSN/ SAC Taxable amount Total Tax Amount
Rate Amount

₹ 400.00 18% ₹ 72.00 ₹ 72.00

8431 ₹ 9,500.00 18% ₹ 1,710.00 ₹ 1,710.00

Total ₹ 9,900.00 ₹ 1,782.00 ₹ 1,782.00

Terms and conditions For : SHRI MAA TARINI EARTHMOVERS

1.Goods sold will not be taken back.


2.Intrest@24% will be charged, if payment is not made within 30days of
presentation of bill.

Authorized Signatory

You might also like