Project Name Q
QT-CHEC-12
CONTRACTOR CONSULTANT EMPLOYER
ELONGATION INDEX
BS 812 -105.2 1990/ (2000)
Sample No : Aggregate Size :
Sample Location : Test No(Ref to register) :
Date of Sampling : Date of Test :
Sieve Size (mm) Wt. Retained % Retained Calculate to M1
63.0 0.0 0.0
50.0 0.0 0.0
37.5 0.0 0.0
28.0 816.0 10.5
20.0 1535.0 19.7
14.0 1982.0 25.5
10.0 1765.0 22.7
6.3 1684.0 21.6
Total Wt. after discarding material Retained on 63.0 mm sieve
and passing 6.3 = M1 M1 =
7782.0
Fractions selected for Weight Wt. Retaining the Corrected
Wt. taken for Test (g)
testing (g) guage (g) Weight (g)
63.0 ~ 50.0
50.0 ~ 37.5
37.5 ~ 28.0 816.0 816.0 115.0 115.0
28.0 ~ 20.0 1535.0 1535.0 244.0 244.0
20.0 ~ 14.0 1982.0 1982.0 364.0 364.0
14.0 ~ 10.0 1765.0 1765.0 241.0 241.0
10.0 ~ 6.3 1684.0 1684.0 387.0 387.0
Total M2 = 7782.0 M3 = 1351.0
Total Passing the gauge = M3
Elongation Index (%) = M3
X 100
M2
Reported Elongation Index (%) = 17
Contractor Consultant
Tested By: Checked By: Approved By: Witnessed By: Approved By:
...............................
Name; .............................. .............................. ............................... ................................
QAM
Position; Material Technician ME / Material Technician Material Technician Material Engineer
...............................
Signature ............................... ............................... ................................ ................................
..............................
............................... ............................... .................................. ................................
Date