0% found this document useful (0 votes)
33 views2 pages

MP Tep-Sta

The document outlines the operational status of various equipment and personnel at the MP TEP-STA site as of November 23, 2024. It lists the readiness of dump trucks, motor graders, excavators, maintenance staff, and administrative personnel, totaling 25 individuals on site. Additionally, it provides details on the types and conditions of the equipment available, indicating that all listed units are ready for operation.

Uploaded by

andimuhrizal1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views2 pages

MP Tep-Sta

The document outlines the operational status of various equipment and personnel at the MP TEP-STA site as of November 23, 2024. It lists the readiness of dump trucks, motor graders, excavators, maintenance staff, and administrative personnel, totaling 25 individuals on site. Additionally, it provides details on the types and conditions of the equipment available, indicating that all listed units are ready for operation.

Uploaded by

andimuhrizal1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MP TEP-STA Site eci

23 Nov 2024

NO UNIT OPERATOR / DRIVER ESTIMASI ORIENTASI KETERANGAN ESTIMASI ONSITE KAMAR

1 Herianto Ready DT 2932 On Site Mesh


2 Ashar Ready DT 2937 On Site Mesh
3 frengky palallo Ready All DT On Site Mesh
4 Daus Ready DT 2930 On Site Kost
5 Safri Ready DT 2938 On Site Mesh
6 Muh. Sandi Ready DT 2927 On Site Mesh
7 Sarlin Ready DT 2936 On Site Mesh
8 refli Ready All DT On Site Mesh
1 Dump Truck (7 Unit)
9 Muh. Wahyuni Ready All DT On Site
10 Suhary Ready All DT On Site
11 Yahya Sampe Limbong Ready All DT On Site
12
13
14
15
16

1 Lukman Ready MG 511 On Site Mesh


2 Motor Grader (1 unit)
2

1 Wahyu Ready EX 312 On Site Mesh


2 Mirsan Ready EX 312 On Site Mesh
3 Amir Ready EX 313 On Site Mesh
3 Excavator (3 Unit)
4 Herbian Ready EX 313 On Site Mesh
5 Kevin Ready EX 88 On Site Mesh
6 Agustinus Ready EX 88 On Site Mesh

1 Suharto Ready On Site Mesh


2 Agrima Ready On Site Mesh
6 Maintenance
3 Kurniawan Ready On Site Mesh
4 Mirdan Ready On Site Mesh

1 Andi Muh. Rizal (ADM) Ready admin Onsite Mesh


7 ADM/OPERATION 2 Riel Panimba Ready supervisi operation Onsite Mesh
3 Irfandi (FO) Ready Logistik Onsite Mesh

TOTAL MP 25 Orang
Plan MP -
New Hire -
Populasi Unit TEP-STA (November)

NO NOMOR UNIT JENIS UNIT TYPE UNIT SERIAL NUMBER (TAHUN) KETERANGAN
1 EX 312 EXCA 30 Ton SANY SY365H SY036GCB53658 (2022) READY
2 EX 313 EXCA 30 Ton SANY SY365H SY036RCB55388 (2022) READY
3 EX 88 EXCA 20 Ton SANY SY215C SY021HCA90658 (2021) READY
4 MG 510 MOTOR GRADER SANY STG230C-8S PY5823CC1176 (2022) READY
5 DT 2927 DUMP TRUCK 20 Ton Hino 500 2022 READY
6 DT 2930 DUMP TRUCK 20 Ton Hino 500 2022 READY
7 DT 2931 DUMP TRUCK 20 Ton Hino 500 2022 READY
8 DT 2932 DUMP TRUCK 20 Ton Hino 500 2022 READY
9 DT 2936 Muh. Wahyuni Ready All DT READY
10 DT 2937 Suhary Ready All DT On Site
11 DT 2938 Yahya Sampe Limbong Ready All DT On Site
12 LV 166 Light Vehicle HILUX 2024 READY