BOQ (35) - Electrical-1

The document outlines the Bill of Quantities (BOQ) for electrical and HVAC works related to the ARFF-ATC Redundancy Tower project at GMR Hyderabad International Airport. It includes detailed descriptions, quantities, and rates for various electrical installations, such as relocating UPS systems, wiring, light fixtures, and HVAC systems like cassette and split air conditioners. The scope also specifies the relocation of existing services and the installation of new equipment, with particular makes and standards mentioned for compliance.

Uploaded by

kamalabtd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views7 pages

BOQ (35) - Electrical-1

The document outlines the Bill of Quantities (BOQ) for electrical and HVAC works related to the ARFF-ATC Redundancy Tower project at GMR Hyderabad International Airport. It includes detailed descriptions, quantities, and rates for various electrical installations, such as relocating UPS systems, wiring, light fixtures, and HVAC systems like cassette and split air conditioners. The scope also specifies the relocation of existing services and the installation of new equipment, with particular makes and standards mentioned for compliance.

Uploaded by

kamalabtd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

GMR Hyderabad International Airport Ltd

Project : ARFF-ATC Redundancy Tower


BOQ Electrical
Description Rate Amount
S.no Unit Qty Remarks
Supply Installation (S+I)
Relocate of existing electrical services,without disturbing the other
1 active services as suggested by engineer.
Relocate the existing UPS battery banks with stand including
incoming/Outgoing cables.The cost shall be includes neccesary
accessories for completion of works. shifting of UPS Battery banks to
1.1 proposed location without any damage to the UPS battery
pack.Modification of stand if required as per site condition.
Ls 1

Removing & refixing of existing 1 nos PAC speaker shifting to 2 meters


away from existing location including cable as suggeted by engineer.The
1.2 cost shall be includes necessary cables for completion of works.

2 PVC Conduit

Supply and laying of the 25mm HMS PVC FRLS Conduit including all
accessories like bends and junction boxes as required. Also the cost shall
2.1 be inclusive of the hanging /Floor support in the service areas for laying Mtrs 100 35.64 3564
of conduits.
(Makes:VIP,Sudhakar,Precision,other approved makes )

3 Point wiring
Supply and providing primary point wiring with 2R X 2.5 + 1 X 1.5 sq.mm,
PVC insulated, FRLS copper wires in the approved make ISI mark PVC
conduit, wiring for the offices and floor areas shall be considered in the
concealed conduiting and other areas shall be open conduiting, the cost
shall be inclusive of the 1no. 5 A modular switch, GI/PVC gang box and
3.1 the cost shall be inclusive of the hanging supports in the service areas Nos 4 0 0
(Primary point shall be considered from DB/Switch board to 1st light
point).
(Makes:KEI,Polycab,other approved makes )

Secondary point wiring from the primary light fixture to the next light
fixture with 2R X 2.5 sq.mm + 1X1.5 sq.mm, PVC insulated, FRLS copper
wires in the approved make ISI mark PVC conduit, the cost shall be
hanging supports (PVC conduit & Ball N sockets ) in the service areas.
3.2 (Makes:KEI,Polycab,other approved makes ) Nos 6 0 0

4 Light fixtures
Supply, Installation, testing and commissioning of Ceiling reccess
mounted 2 X 2( Square type) of 36W,230volts,4000 k CCT ,The cost shall
include necessary hanging supports for light fixtures,cable conceal
provisions.
4.1 Light fixtures should be dimmable type with curcuit wise control panel No's 8 1188 9504
and regulator.
(Make: Philips/Wipro/Crompton /Bajaj)

5 LT Cable

Supply and laying of 3C x 4 Sq.mm, FRLS 1.1 kV grade, PVC insulated,


copper flexible cable in the Existing conduit. The cost shall be includes
5.1 laying of cable & providing necessary supports, clamps, Cable ties etc. as Rmt 200 136.08 27216
required.
(Makes:KEI,Polycab,other approved makes )

Supply & laying of 4C x 10 Sq.mm Cu Flexible FRLSH,Laying of cable in


existing conduit.The cost shall be includes indentification tags and
5.2 termination and Glands other required materials for completion of Rmt 100 459 45900
works.
(Makes:KEI,Polycab,other approved makes )

Supply & laying of 1.1kv grade 4C x 16 Sq.mm AL conductor Armored


XLPE insulation FRLSH,Laying of cable in existing conduit.The cost shall be
5.3 includes indentification tags and termination and Glands other required Rmt 140 151.2 21168
materials for completion of works.
(Makes:KEI,Polycab,other approved makes )

6 Switch & Sockets 0


Supply, Installation, testing and commissioning of PVC box and sockets
with IS approved modular plate and cover in front of recess includes
providing and fixing of 1no 5pin 6/16A with 1nos switch control, 240v
and making all damages to good finish etc. as required to complete in all
6.1 respect. Nos 4 238.68 954.72
(Make: Legrand/ L&T / Anchor Roma/Other approved makes )

Supply, Installation, testing and commissioning of PVC box and sockets


with IS approved modular plate and cover in front of recess includes
providing and fixing of 2nos 5pin 6/16A with 2nos switch control, 240v
6.2 and making all damages to good finish etc. as required to complete in all Nos 10 324 3240
respect.
(Make: Legrand/ L&T / Anchor Roma/Other approved makes )

Supply, installation, testing and Commissioning of 3-phase & 1-phase


industrial sockets with MCB Control and plug top ,IP 65,the cost shall
include the cost of back box ,fixing of back box and necessary accessories
6.3 for compleation of works.find the following ratings of sockets . (Make: 0 0
Legrand/ L&T / Anchor Roma/Other approved makes )

6.4 32 A Industrial socket with 32 A DP MCB,1-phase Nos 4 4050 16200


6.5 32 A Industrial socket with 32 A 4P MCB,3-phase Nos 2 5238 10476
SITC of 3 phase 4 pole 32 A MCCB,IP-42 MCCB box including suitable
surfaced mounted metallic enclosure.The cost shall be includes fixing of
enclosure and supports necessary accessories for completion of
6.6 works.Also the provision for cable entry shall be available based on the Nos 2 0 0
required cable size.
(Make: Legrand/ L&T /Other approved makes )

0
7 PVC Trunking /Floor Trunking/Casing & Capping 0

7.1 Supply and installation of IS Standard PVC Trunking,Perforated cable tray 0 0


with covers and casing & Capping for cables.The cost shall be includes
necessary accessories for completion of works.Following sizes:
7.2 100x50mm-PVC trunking with cover Rmt 20 302.4 6048
7.3 100x50mm-PVC perforated cable tray with cover Rmt 40 318.6 12744
7.4 32mm PVC casing & Capping Rmt 20 81 1620

Supply, Installation and commissioning of GI Heavy duty Pre-fabricated


cable tray, Hot dip galvanised with accessories like coupler plate, tray
covers, horizontal and vertical inside, outside bends, risers, reducers,
tees, cross members etc. Cutting to suitable length, The GI support
system shall be designed to sustain 40kg point load plus the running
7.5 meter load as per cables running on trays and maximum permissible sag Rmt 100 318.6 31860
shall not be less than cantilever Spacing divided by 200. provide
calculation with tender submittal. All material shall be confirming to
relevant IS standards. In corridors the cable trays shall be suspended by
10 mm dia hangars suspension.
1.100 mm x 50 mm x2mm Perforated type

0
8 Miscellaneous works 0
Removing of Existing Smoke/heat detectors,Ceiling recess mounted type
Speakers & Ceiling lights and Refixing of detectors & Ceiling mounted
type Speakers at same location.The cost shall includes necessary cables if
8.1 required,if any damage the detector or Speakers replace with new item. Ls 1 0 0

Total

Scope consideration for works


1.Relocate the UPS battery banks as per layout.
2.2 nos of 1 TR Split Ac's Considered in Ups room at Stairs case area.
3. Sockets & power provision for ARFF furniture.
4.Only power Provision for Tower-s controller console,SMC-1 controller
console,CLD Console furnitures.
5. Furniture with Inbuilt sockets in furniture of ATC is not in scope
6.No IT requirements is not anticipated.
7.Removal of existing furniture & electrical services is not in scope.
8.New 2x2 ceiling lights are considered and new Fire detectors & Public
announcement speakers is not consider due to integration issues so
Refixing the old Speakers & Detectors.

9. 2 nos 5 TR Cassette units in Office Area.


10. Only Power provision for 10 KVA ups considered(2 nos of 32 A MCCB
considered). UPS and batteries shall be supplied and installed by
User(AAI).

CH-24A-02-A-015-01
GMR Hyderabad International Airport Ltd
Retundancy Tower
BOQ- HVAC
Supply
S. No. Description Unit Qty
(S)

Supply,installation,Testing & Commissioning of Cassette


Type indoor unit comprising multiple row cooling
coil,blower and motor, insulated drain pan enclosed in
sheet metal casing etc. to make all the system
1
operational. Cost includes decorative panel, receiver
kit,etc. Cost includes Wall chipping or core cutting and
making it good as
earlier(MAKE:DAIKIN/BLUESTAR/CARYAIRE).

1.1 5 TON Nos 2

Supply, installation, Testing & Commissioning of VRF slim


type system side discharge out door units compressing
All Inverter type compressors designed for refregerant
entry directly into compressor chamber to avoid super
heat gain due to motor assembly , refrregerant cooled
2 heat sink ,with IPLV 7, and low noise fan,condenser
coil,refrigerant etc,.The rated capacity shall be at 43deg
C ambient. (Considered rated capacity at 35deg ambient
temperature) Cost includes Wall chipping and making it
good as earlier(make: diakin,voltas, blue star)equvalent
to daikin.

2.1 8hp Nos. 2


3 Chordless Remote with holder Nos. 2

Supply & Installation of refrigerant copper piping with


HD/SD copper pipes insulated with nitrile rubber tubular
4 installation for indoor and out door units headers (ODU RMT 30
to 1st IDU) (suction and liquid are considered separate
lengths)

Supply & Installation of PVC drain piping 40mm (drain


5 piping to be insulated with 6 mm nitrile rubber) along RMT 30
with necessary accessories

Supply and erection of MS stand for outdoor units. The


6 whole stands shall be epoxy painted and suitable for the Nos. 2
above outdoor units.

Supply and erection of Refnet Joints for Indoor units and


7 outdoor units and testing and commisioning by using
nitrogen liquid.
7.1 For Indoor Units Nos. 4
7.2 For Outdoor Units Nos. 4
8 Supply and charging of refrigerant R32/R410. kgs 70
SITC of 1TR hi wall type BEE rated 5 star inverter
technology split air conditioner with full function wireless
remote and auto restart feature, with indoor/outdoor
9 unit, gas charge, R-410A / R-32. Cost includes ODU Set 2
stands and all the copper pipeline and wall chipping and
finishing Makes AC: Daikin/Carrier/Blue
Star/Voltas/Hitachi
Supply, installation, testing and commissioning of
insulated copper refrigerant piping set (suction and
discharge) duly insulated by nitrile rubber for 1 TR hi
10 wall split AC. Size (thickness and diameter) of both RMT 20
Copper pipes should be as per recommendation of AC
manufacturer's technical specification.Make : Totaline/
Met Tube/ Diamond/ Star/ Camipro.
Total
Installation Rate
(I) (S+I)
-