Government Polytechnic Malvan
MICRO PROJECT
Academic Year: 2023-24
o TITLE OF PROJECT: Implement a Program For auto changing
Traffic Signals.
o Program Code: CO4I
o Course: GUI Application Development using VB.NET
o Course Code: 22034
o Name of Project Guide: Mr.S.J. Pawar
Group Details:-
Sr. Roll Enrollment
Name of Group Member
No. Number Number
3
Maharashtra State Board of Technical Education, Mumbai
CERTIFICATE
This is to certify that Ms/Mr.
Roll No.: of Fourth Semester of Diploma in Computer
Engineering of Government Polytechnic, Malvan has completed the
Micro Project satisfactorily in course GUI Application Development
using VB.NET (22034) for the academic year 2024-25 as prescribed in
the curriculum.
Place: Enrollment No.:
Date: / /2024 Exam Seat No.:
_____________ _______________ _________________
Subject Teacher HOD Principal
Mr. S. J. Pawar Mrs. T. V. Mitake
Maharashtra State Board of Technical Education, Mumbai
CERTIFICATE
This is to certify that Ms/Mr.
Roll No.: of Fourth Semester of Diploma in Computer
Engineering of Government Polytechnic, Malvan has completed the
Micro Project satisfactorily in course GUI Application Development
using VB.NET (22034) for the academic year 2024-25 as prescribed in
the curriculum.
Place: Malvan Enrollment No.:
Date: / /2024 Exam Seat No.:
_____________ _______________ _________________
Subject Teacher HOD Principal
Mr S. J. Pawar Mrs. T. V. Mitake
Maharashtra State Board of Technical Education, Mumbai
CERTIFICATE
This is to certify that Ms/Mr.
Roll No.: of Fourth Semester of Diploma in Computer
Engineering of Government Polytechnic, Malvan has completed the
Micro Project satisfactorily in course GUI Application Development
using VB.NET (22034) for the academic year 2024-25 as prescribed in
the curriculum.
Place: Malvan Enrollment No.:
Date: / /2024 Exam Seat No.:
_____________ _______________ _________________
Subject Teacher HOD Principal
Mr. S. J. Pawar Mrs. T. V. Mitake
Teacher Evaluation Sheet for Micro
Project
Course Title and Code: GUI Application Development using
VB.NET (22034)
Title of the Project: Implement a Program For auto changing
Traffic Signals.
COs addressed by the Micro Project:
• Use Visual Studio IDE to design application.
• Develop GUI Application using Form Controls and its events.
• Apply Object Oriented concepts in GUI Application.
Major Learning Outcomes achieved by students by doing the
project ( Practical Outcomes ):
• Implemented a Windows Form program using Picture Box
and Timer to display auto changing Traffic Signals.
(b) Unit Outcomes (in Cognitive Domain) :
• Use the given Form Control in VB.Net Application
development.
• Used the Control Structures in VB.Net Application
development.
(c) Outcomes in Affective Domain:
• Work in teams & Self-learning.
• Demonstrate working as a leader/a team member.
• Cooperated with each other.
Any other comment:
• In this Micro project we implemented a program for auto
changing Signals that is Traffic Signals by using Control
Structures.
Marks Obtained by Micro project:
Marks
obtained
Marks for
Roll No by the Total
Sr. No. Group
individual Marks
Work
based on
viva
1. 2213
2. 2214
3. 2249
Name of Faculty Member: Mr. S. J. Pawar.
Signature: __________________________
Annexure –I
Part – A Micro-Project Proposal
o Title of the Project: Implement a Program For auto changing
Traffic Signals.
o Aims/Benefits of the Micro-Project (minimum 30-50 words):
In this micro project, there is a VB.Net Windows form
Application program for auto changing Traffic Signals.
Improved traffic flow: By using a VB.NET program to control
traffic signals, the timing of the signals can be optimized to
reduce congestion and improve traffic flow.
Increased safety: The program can be designed to prioritize safety
by adjusting the timing of the signals based on factors such as
traffic volume, speed, and pedestrian and cyclist traffic.
o Course Outcomes Addressed:
• Use Visual Studio IDE to design application.
• Develop GUI Application using Form Controls and its events.
• Apply Object Oriented concepts in GUI Application.
o Proposed Methodology:
• Clearly outline the objectives, goals, and constraints of
the micro project.
• Discussion of the topic of the micro-project with group
members and also with teacher.
• Discussion with all the team members and assigning
particular work to all members.
• Preparing the reports of the micro-project.
• Submitting the project to the subject teacher.
o Action Plan(Sequence and time required for major activity):
Sr. Details of activity Planned Planned Name of
Start date Finish date Responsible
No.
Team Members
Searching the topic for
1 19/02/24 28/02/24
micro-project
Collect information
from the internet,
2 01/03/24 12/03/24
textbook and reference
book
Implemented the
3 program of that 13/03/24 18/03/24
particular topic
Arrange screenshot of
code & output and
some details needed for
4 micro project (i.e.: E 18/03/24 24/03/24
valuation Sheet,
annexures, etc.) in MS
Word
Written the report on
5 24/03/24 28/03/24
the topic
Printed code and output
and some details needed
6 for micro project (i.e.: 29/03/24 29/03/24
Evaluation Sheet,
annexures, etc.)
o Resources used:
Sr.
Source Specification
No.
https://aratideshmukh.wordpress.com/gadgraphical-
1. Website application-development/
2. Website https://www.perplexity.ai/library
Windows Form Application Program :
Output of code: