0% found this document useful (0 votes)
88 views80 pages

Earth Work Analysis

The document outlines various items related to earthwork excavation and embankment, detailing labor requirements, rates, and methods for different types of soil and conditions. It includes rate analyses for labor, machinery, and composite rates for tasks such as excavation, embankment construction, and bed clearance. Each item specifies the number of unskilled and skilled laborers needed, along with the associated costs per 1000 cubic feet.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views80 pages

Earth Work Analysis

The document outlines various items related to earthwork excavation and embankment, detailing labor requirements, rates, and methods for different types of soil and conditions. It includes rate analyses for labor, machinery, and composite rates for tasks such as excavation, embankment construction, and bed clearance. Each item specifies the number of unskilled and skilled laborers needed, along with the associated costs per 1000 cubic feet.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 80

CHAPTER NO.

EARTH WORK
(EXCAVATION & EMBANKMENT)
DESCRIPTION OF ITEM:

Item No. 1 Earth work excavation undressed lead upto a single throw of kassi,
Phaorah or shovel.

a) In ashes, sand, soft soil or silt clearance.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging 3.75 No. per day -


(including dagbelling for borrow pits)

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 1
DESCRIPTION OF ITEM:

Item No. 1 Earth work excavation undressed lead upto a single throw of kassi,
Phaorah or shovel.

b) In ordinary soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 4.50 No. per day -


(including dagbelling for borrow pits)

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 2 Earthwork excavation in ashes, sand and soft soil or silt clearance,
undressed lead upto 50 ft (15 metre).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging, filling, lifting (including


dab belling for borrow pits 2.5 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 2
DESCRIPTION OF ITEM:

Item No. 3 Bed clearance and dressing slopes of drains to required sections
including the removal of weeds, roots, etc, disposal of excavated
materials within 50 ft (15 metre) lead.

a) Excavated material undressed.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 4.00 Nos. per day -


2 Coolies unskilled for carrying 3.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 3 Bed clearance and dressing slopes of drains to required sections
including the removal of weeds, roots, etc., disposal of excavated
materials within 50 ft (15 metre) lead.

b) Excavated material dressed in the specified manner.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 4.00 Nos. per day -


2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser 0.55 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 3
DESCRIPTION OF ITEM:

Item No. 4 Borrowpit excavation undressed lead upto 100 ft. (30 metre)

a) Ordinary Soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging and filling 4.00 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 4 Borrowpit excavation undressed lead upto 100 ft. (30 metre).

b) Hard Soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging and filling 5.60 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 4
DESCRIPTION OF ITEM:

Item No. 5 Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:

(i) 95% to 100% maximum modified AASHTO dry-density with vibratory roller.
Mixing, Moisterning earth to optimum moisture contant in layer etc.
complete with tractor complete with rotorator blade.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft (65 m³)


LABOUR

1 Coolies unskilled for digging 4.00 Nos. per day -


2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser cooly skilled 0.125 No. per day -
4 Cooly unskilled 0.142 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

MACHINERY (For 1000 Cft Compacted)

1 Tractor with rotarator blade 0.25 HR per hrs. -


2 Vibratory Road Roller 0.25 HR per hrs. -

Total -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 5
DESCRIPTION OF ITEM:

Item No. 5 Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:

(ii) 90% maximum modified AASHTO dry density.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 4.00 Nos. per day -


2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser cooly skilled 0.125 No. per day -
4 Cooly Unskilled 0.142 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

MACHINERY (For 1000 Cft Compacted)

1 Tractor with rotarator blade 0.25 HR per hrs. -


2 Vibratory Road Roller 0.20 HR per hrs. -

Total -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 6
DESCRIPTION OF ITEM:

Item No. 5 Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:

(iii) 85% maximum modified AASHTO dry density.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 4.00 Nos. per day -


2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser cooly skilled 0.125 No. per day -
4 Cooly Unskilled 0.142 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

MACHINERY (For 1000 Cft Compacted)

1 Tractor with rotarator blade 0.25 HR per hrs. -


2 Vibratory Road Roller 0.15 HR per hrs. -

Total -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 7
DESCRIPTION OF ITEM:

Item No. 6 Regular excavation dressed.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging carrying


and dagbelling. 4.50 Nos. per day -
2 Dresser 0.50 No. per day -
3 Cooly skilled for dressing 0.12 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 8
DESCRIPTION OF ITEM:

Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.

i) Ordinary

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Kail Wood for shuttering 0.046 Cft. P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging, filling & dagbelling 4.00 Nos. per day -
2 Coolies unskilled for carrying 1.50 Nos. per day -
3 Coolies unskilled for temporary diviation 0.50 No. per day -
4 Coolies unskilled for removal of surplus water 0.50 No. per day -
5 Cooly un-skilled 1.00 No. per day -
6 Dresser 1.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 9
DESCRIPTION OF ITEM:

Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.

ii) Hard

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Kail Wood for shuttering 0.046 Cft. P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging, filling & dagbelling 5.60 Nos. per day -
2 Coolies unskilled for carrying 1.50 Nos. per day -
3 Coolies unskilled for temporary diviation 0.50 No. per day -
4 Coolies unskilled for removal of surplus water 0.50 No. per day -
5 Cooly un-skilled 1.00 No. per day -
6 Dresser 1.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 10
DESCRIPTION OF ITEM:

Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.

iii) Very Hard

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Kail Wood for shuttering 0.046 Cft. 0.00 P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging, filling & dagbelling 7.30 Nos. per day -
2 Coolies unskilled for carrying 1.50 Nos. per day -
3 Coolies unskilled for temporary diviation 0.50 No. per day -
4 Coolies unskilled for removal of surplus water 0.50 No. per day -
5 Cooly un-skilled 1.00 No. per day -
6 Dresser 1.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 11
DESCRIPTION OF ITEM:

Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
iv) Gravel and Shingle.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Kail Wood for shuttering 0.046 Cft. P. Cft. -


As per item No.7 - (i) =

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging, filling & dagbelling 10.00 Nos. per day -
2 Coolies unskilled for carrying 4.50 No. per day -
3 Coolies unskilled for temporary diviation 2.00 No. per day -
4 Coolies unskilled for removal of surplus water 1.00 No. per day -
5 Cooly un-skilled 0.50 No. per day -
6 Dresser 2.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 12
DESCRIPTION OF ITEM:

Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.

i) Ordinary soil

Detail Unit Rate (British System) per 1000 Cft


Rate
Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Wood for shuttering 0.092 Cft. P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging and filling 4.00 Nos. per day -
2 Coolies unskilled for carrying 4.00 Nos. per day -
3 Coolies unskilled for removing surface water 0.50 No. per day -
4 Dresser for dressing, fixing shuttering
removing and temporary shuttering 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 13
DESCRIPTION OF ITEM:

Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.

ii) Hard Soil

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Wood for shuttering 0.092 Cft. P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging and filling 5.60 Nos. per day -
2 Coolies unskilled for carrying 4.00 Nos. per day -
3 Coolies unskilled for removing surface water 0.50 No. per day -
4 Dresser for dressing, fixing shuttering
removing and temporary shuttering 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 14
DESCRIPTION OF ITEM:

Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.

iii) Very Hard

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Wood for shuttering 0.092 Cft. P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging and filling 7.30 Nos. per day -
2 Coolies unskilled for carrying 4.00 Nos. per day -
3 Coolies unskilled for removing surface water 0.50 No. per day -
4 Dresser for dressing, fixing shuttering
removing and temporary shuttering 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 15
DESCRIPTION OF ITEM:

Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.

iv) Gravel and Shingle

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Wood for shuttering 0.092 Cft. P. Cft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Coolies unskilled for digging 9.00 Nos. per day -


2 Coolies unskilled for carrying 6.00 Nos. per day -
3 Coolies unskilled for filling 4.00 Nos. per day -
4 Removing surface water 1.00 No. per day -
5 Dresser 2.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 16
DESCRIPTION OF ITEM:

Item No. 9 Excavation in shingle or gravel formation and rock, not, requiring
blasting, undressed lead upto 100 ft. (30 metre).

i) Dry

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 9.00 Nos. per day -


2 Coolies unskilled for filling 4.00 Nos. per day -
3 Coolies unskilled for carrying 6.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 9 Excavation in shingle or gravel formation and rock, not, requiring
blasting, undressed lead upto 100 ft. (30 metre).

ii) Wet

Detail Unit Rate (British System) per 1000 Cft


Rate
Qty Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 10.00 Nos. per day -


2 Coolies unskilled for filling 5.00 Nos. per day -
3 Coolies unskilled for carrying 7.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -

Page 17
DESCRIPTION OF ITEM:
Item No. 9 Excavation in shingle or gravel formation and rock, not, requiring
blasting, undressed lead upto 100 ft. (30 metre).

iii) In flowing water

Detail Unit Rate (British System) per 1000 Cft


Rate
Qty Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging 14.00 Nos. per day -


2 Coolies unskilled for filling 6.50 Nos. per day -
3 Coolies unskilled for carrying 7.50 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 10 Earth work excavation in irrigation channels, drains, etc., to designed
section, grades and profiles excavated material disposed off and dressed
with in 50 ft (15 metre) lead.

i) Ordinary soil

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging, filling


filling & dag belling 4.00 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser (for slopes and bed) 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -

Page 18
DESCRIPTION OF ITEM:

Item No. 10 Earth work excavation in irrigation channels, drains, etc., to designed
section, grades and profiles excavated material disposed off and dressed
with in 50 ft (15 metre) lead.

ii) Hard soil

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging,


filling & dag belling 5.60 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser (for slopes and bed) 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 10 Earth work excavation in irrigation channels, drains, etc., to


designed section, grades and profiles excavated material disposed
off and dressed with in 50 ft (15 metre) lead.

iii) Very hard soil

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging,


filling & dag belling 7.30 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -
3 Dresser (for slopes and bed) 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -

Page 19
DESCRIPTION OF ITEM:

Item No. 10 Earth work excavation in irrigation channels, drains, etc., to


designed section, grades and profiles excavated material disposed
off and dressed with in 50 ft (15 metre) lead.

iv) Shingle and gravel

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging,


filling & dag belling 8.00 Nos. per day -
2 Coolies unskilled for filling 4.00 Nos. per day -
3 Coolies unskilled for carrying 6.00 Nos. per day -
4 Dresser (for slopes and bed) 2.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 11 Excavation in rock dressed to designed section, grades and profiles,
excavated material disposed off within 100 ft. (30 metre) and lift upto 5
(1.5 metre).

a) Soft rock, Slate, Shale, Schist or laterite works, with pick & crowbar.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies unskilled for digging & carrying 14.00 Nos. per day -
2 Dresser 4.00 Nos. per day -
3 Bahishti 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -

Page 20
DESCRIPTION OF ITEM:

Item No. 11 Excavation in rock dressed to designed section, grades and


profiles, excavated material disposed off within 100 ft. (30 metre) and
lift upto 5 ft. (1.5 metre).

b) Medium hard rocks requiring occasional blasting.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Cost of gun powder and fuse


(1 lbs and 1 fuse) 3.00 Nos. each -
0.453 kg @ 14.00/kg = 6.34
1 fuse (1 metre) @ 14/- 14.00
20.34

Contractor's Profit & Ove ##### Percent -


Total -

LABOUR

1 Coolies skilled for boring holes with steel jumper 3.00 Nos. per day -
2 Coolies skilled for tempering & fixing charges 0.13 No. per day -
3 Blowman 1.00 No. per day -
4 Coolies unskilled for digging 12.00 Nos. per day -
5 Breaking coolies un-skilled stone and removing the spoil 9.00 Nos. per day -
6 Mate (skilled cooly) 0.50 No. per day -
7 Dresser 2.00 Nos. per day -
8 Hammerman 1.00 No. per day -
9 Blacksmith for repairing tools etc. 1.00 No per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 21
DESCRIPTION OF ITEM:

Item No. 12 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.

i) Grade-I

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 (Powder and fuse) for blasting 3.00 No. each -


(1 lbs and one fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/-

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Quarrymen for boring hole and fixing


etc. (skilled cooly) 3.00 Nos. per day -
2 Quarrymen for digging and breaking
large stone into small ones 7.00 Nos. per day -
3 Chiselar for dressing 1.00 No. per day -
4 Bahishti 0.50 No. per day -
5 Coolies unskilled for remaining spoil
upto 50 ft. 15 metre lead 6.00 Nos. per day -
6 Blacksmith 0.25 No. per day -
7 Smithy cooly 0.25 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 22
DESCRIPTION OF ITEM:

Item No. 12 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.

ii) Grade-II

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 (Powder and fuse) for blasting 5.00 No. each -


(1 lbs and one fus)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/-

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Quarrymen for boring hole and fixing etc. 4.00 Nos. per day -
2 Digging and breaking
large stone into small one 7.00 Nos. per day -
3 Chiselar for dressing 1.00 No. per day -
4 Bahishti 0.50 No. per day -
5 Black-smith for repairing tools etc. 0.50 Nos. per day -
6 Smithy cooly 0.50 No. per day -
7 Coolies unskilled for remaining spoil
upto 50 ft. (15 metre) lead 6.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 23
DESCRIPTION OF ITEM:

Item No. 12 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.

iii) Grade-III

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 (Powder and fuse) for blasting 6.00 No. each -


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/-

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Quarrymen for boring hole and fixing etc. 5.00 Nos. per day -
2 Digging and breaking large stones
into small one. 8.50 Nos. per day -
3 Chiselar for dressing 1.50 No per day -
4 Bahishti 0.75 No. per day -
5 Blacksmith for repairing tools 0.75 No. per day -
6 Smithy cooly 0.75 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 24
DESCRIPTION OF ITEM:

Item No. 11 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.

iv) Grade-IV

Detail Unit Rate (British System) per 1000 Cft


Rate
Qty Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 (Powder and fuse) for blasting 7.00 No. each -


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/-

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Quarrymen for boring hole and fixing etc. 6.00 Nos. per day -
2 Digging and breaking large stones
into small one. 9.00 Nos. per day -
3 Chiselar for dressing 2.00 No per day -
4 Bahishti 0.75 No. per day -
5 Blacksmith for repairing tools 1.00 No. per day -
6 Smithy cooly 1.00 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 25
DESCRIPTION OF ITEM:

Item No. 12 Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc., complete.

v) Grade-V

Detail Unit Rate (British System) per 1000 Cft


Rate
Qty Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 (Powder and fuse) for blasting 8.00 No. each -


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/-

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Quarrymen for boring hole and fixing etc. 7.00 Nos. per day -
2 Digging and breaking large stones
into small one. 10.00 Nos. per day -
3 Chiselar for dressing 2.50 No per day -
4 Bahishti 1.00 No. per day -
5 Blacksmith for repairing tools 1.00 No. per day -
6 Smithy cooly 1.00 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 26
DESCRIPTION OF ITEM:

Item No. 12 Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc., complete.

vi) Grade-VI

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 (Powder and fuse) for blasting 9.00 No. each -


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Quarrymen for boring hole and fixing etc. 8.00 Nos. per day -
2 Digging and breaking large stones
into small one. 10.00 Nos. per day -
3 Chiselar for dressing 3.00 No per day -
4 Bahishti 1.00 No. per day -
5 Blacksmith for repairing tools 1.25 No. per day -
6 Smithy cooly 1.25 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 27
DESCRIPTION OF ITEM:

Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.

i) Grade-I

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

Add 100% to the rate on item No. 12 (a) (i) x 2 -

LABOUR

Add 100% to the rate on item No. 12 (a) (i) x 2 (0.01)

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete).

ii) Grade-II

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

Add 100% to the rate on item No. 12 (a) (ii) x 2 -

LABOUR

Add 100% to the rate on item No. 12 (a) (ii) x 2 -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 28
DESCRIPTION OF ITEM:

Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.

iii) Grade-III

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

Add 100% to the rate on item No. 12 (a) (iii) x 2 -

LABOUR

Add 100% to the rate on item No. 12 (a) (iii) x 2 -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.

iv) Grade-IV

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

Add 100% to the rate on item No. 12 (a) (iv) x 2 -

LABOUR

Add 100% to the rate on item No. 12 (a) (iv) x 2 -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 29
DESCRIPTION OF ITEM:

Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.

v) Grade-V

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

Add 100% to the rate on item No. 12 (a) (v) x 2 -

LABOUR

Add 100% to the rate on item No. 12 (a) (v) x 2

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.

vi) Grade-VI

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

Add 100% to the rate on item No. 12 (a) (vi) x 2 -


LABOUR

Add 100% to the rate on item No. 12 (a) (iv) x 2 -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 30
DESCRIPTION OF ITEM:

Item No. 13 Rehandling of Earth Work

a) Lead upto a single throw of Kassi, Phaorah or Shovel.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled 2.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 13 Rehandling of Earth Work

b) Upto a lead of 50 ft. (15 metre)

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Cooly un-skilled for filling 1.50 No. per day -


2 Coolies un-skilled for carrying 2.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 31
DESCRIPTION OF ITEM:

Item No. 14 Rehandling of gravel work or excavated rock, lead upto 50 ft. (15 metre).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Cooly un-skilled for filling 4.00 Nos. per day -


2 Coolies un-skilled for carrying 6.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 15 Filling watering and ramming earth under floors.

i) With surplus earth from foundation etc.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for ramming 1.50 Nos. per day -


2 Coolies un-skilled for carrying 2.00 Nos. per day -
3 Dresser earth work 1.00 No. per day -
4 Bahishti 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 32
DESCRIPTION OF ITEM:

Item No. 15 Filling, watering and ramming earth under floors.

ii) With new earth excavated from outside, lead upto one chain (30 metre).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Diggers 4.00 Nos. per day -


2 Carrier 2.58 Nos. per day -
3 Dresser 1.00 No. per day -
4 Rammer Cooly un-skilled 1.50 Nos. per day -
5 Bahishti 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 33
DESCRIPTION OF ITEM:

Item No. 16 Extra for every 50 ft. (15 metre) additional lead or part thereof.

i) For earth work soft, ordinary, hard and very hard.


I) Earth work excavation in ashes sand soft soil or silt lead 500 ft. (150 me
By means of donkey labour.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Actual expenses of 4 No. belchas


LABOUR on monthly basis (for 30 days)

(a) 28 men detailed as below Kharkar (owner) 1.00 No. per month -
Belcha men for excavation 8.00 Nos. per month -
Gantiman (with pick axes) 4.00 Nos. per month -
Topalies (men with donkeys for carrying earth) 10.00 Nos. per month -
Langri (Cooks) 2.00 Nos. per month -
Chowkidars 2.00 Nos. per month -
Dobashi (man for supervision) 1.00 No. per month -

Total -
Exenditure per day 0 0.00 -
30
(b) Jamadari commission for supplying labour on Rs.
0.00 @ 6% -
(c) Food etc as under
i) One seer Atta per man daily for 28 men 28.00 seer per kg -
26.12 kg
ii) Kitchen expenses (tea meat, milk,
fuel, fat & aplienees) L.S. -
iii) Lantern, Patromax lamp depreciation
and K. oil consumption L.S. -
iv) Kitchen Utensil, cost of repair and
replacement etc. L.S. -

Total: = a + b + c = 0.00 -
II - i)Donkeys
28 Nos. Donkeys worker 500 ft. lead in belcha
7 No. Donkey in each belcha
Average working life of one donkey 6 years
Average cost price of one donkey = 0.00
After depriceation cost of one donkey = 0.00
Amount per day 28 x 0 = 0.00
6 x 365 Say -
ii) Food etc as under for 28 donkeys
Phak, 5 seers (4.67 kg) per day per donkey
= 28 x 5 = 3.50 mds 3.50 mds per Md -
40
Grams, 2 seers (0.933 x 2) = 1.866 kg per donkey
Per day 28 x 2 = 1.40 mds 1.40 mds per Md -
40
Total-II -
iii) Material

The following articles are required:


a) 4 No. pick axes and 8 Nos. belchas
cost of repairs and replacement 0.00 per day
b) Sharpening expenses for pick axes
and belchas 12 No. 12.00 No. each -
c) Palana with namda complete for one donckey
Rs.300 average life 4 months. Hence cost per
day 28 x 0 = 0.00 -
4 x 30
d) 2 sacks daily consumption repairs and

Page 34
replacement etc. 2.00 Nos. each -
e) Sutli consumption 0.6 Kg. - P. Kg. -

Total - III -

iv) Comp. Equipment


a) 4 No. tents are used for labour of
4 belchas, cost of one tent Rs.
Average life 12 month
Hence cost per day 4 x 0 0.00 per day -
365
b) Dondky hut expenditure = 2500/-
Average lift of hut = 6 months
Cost per day 0 0.00 -
6 x 30
Total - IV -
(v) Medical Expenditure

For 28 men and 28 donkey Total - V -

Grand Total I + II + III + IV + V = -

Contractor's Profit & Ove ##### Percent -


Total -

Hence cost per belcha 0.00 0.00


4
i) Progress per belcha in ashes sand, soft soil or
silt = 1650 Cft and lead 500 ft.
Rate for 1000 Cft 0.00 x 1000 0.00
1650
Rate for 1000 Cft lead 50 ft. (as per item No.2)
of this Chapter 0.00
Difference for 450 = 0.00 - 0.00
Rate for 50 ft. lead 0.00 0.00
9
ii) Progress per belcha in ordinary soil = 1260 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000 0.00
1260

Rate for 1000 Cft lead 50' as per item No. (10-i) SR
of this Chapter 0.00
Difference for lead 450ft 0.00 - 0.00 0.00
Rate for 50 ft. lead 0.00 0.00
9
Rate for every 50 ft. add lead or a part thereof
iii) Progress per belcha in hard soil 1150 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000 = 0.00
1150

Rate for 1000 Cft lead 50 ft.


(as per item No.10-ii of the Chapter
Difference for lead 450ft 0.00 - 0.00 = 0.00
Rate for 50 ft. lead 0.00 = 0.00
9

Rate for every 50 ft. Addl. lead or thereof


iv) Progress per belcha in very hard soil 990 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000 = 0.00
990

Rate for 1000 Cft lead 50 ft.


(as per item No.10-iii) of this Chapter
Difference for lead 450ft 0.00 - 0.00 = 0.00
Rate for 50 ft. lead 0.00 0.00

Page 35
9
Rate for eveyr 50 ft. Add. lead or part thereof

i) For earth work. Soft, ordifnary, hard and very hard


Extra lead for every 50 ft. or part thereof
(as per detail above i - iv)
Total
Average rate Vi + Vii + Viii + Viv 0.00

Labour rate per 1000 Cft = 0.00 -

(i) (iFor gravel, shingle or rock extra labour required This rate shall apply to
for 1000 Cft. The carriage of spoil from these lead upto ½ mile when
formalities over and above that required for soil the lead is more than
is 20% ½ mile lead shall be
paid as carriage of
material by
mechanical mean.

0.00 x 20 0.00 -
100.00

Stat 0.00 + 0.00 0.00 -

ITEM RATES

Labour rate per 1000 Cft Rs. -


Labour rate per Cum Rs. 0.00 -

Page 36
DESCRIPTION OF ITEM:

Item No. 17 Transportation of earth all types when the total distance, including the l
covered in the item of work, is more than 1000 ft.

(a) Upto ¼ mile

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Based on item No.1 of Chapter Carriage

Rate of Ist chain of 100 ft. = -


Rate of 2nd chain of 100 ft. =
Rate of 3rd chain to 10th chain
@ Rs. per Chain for 8 chains =
Rate of 1000 to 1320 ft. (¼ mile)
@ Rs.26.30 per 1000 ft. (26.30 ÷ 1000 x 400) = -
Total rate for ¼ mile -

Deduct rate of Ist chain already included


in the item of earth work = -
Rate of ¼ mile for 100 Cft -
Rate of ¼ mile for 1000 Cft = (36.77 x 10) -

ITEM RATES

Labour rate per 1000 Cft Rs. Say


Labour rate per Cum Rs. 0.00 Say -

DESCRIPTION OF ITEM:

Item No. 17 (b) For every 330 ft. additional lead or part-thereof, beyond ¼ mile upto one m

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate of Ist mile of 100 Cft = -


Rate of Ist mile of 1000 Cft (129.55 x 10) = -
Deduct rate of ¼ mile as per item 17(a) = -
Net rate for ¾ mile upto one mile = -
Rate for 330 ft.:
5280 - 1320 = 12 0.00 -
330 12

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 37
DESCRIPTION OF ITEM:

Item No. 17 (c) For every ¼ mile additional lead or part thereof, beyond one mile upto 5 m

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate of 2nd mile for 100 Cft =


as per item 1 of chapter Carriage = -
Rate of 2nd mile per 1000 Cft = (25.75 x 10) = -
Rate for every ¼ mile (257.50 ÷ 4) = -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 17 (d) For every ½ mile additional lead or part thereof, beyond 5 miles.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

¼ mile rate upto 5th mile beyond


one mile for 1000 Cft as per item 17(c) = -
Rate reduced as per percentage =
calculated between the rates
of item 17(c) and 17(d) of CSR-1979
15 - 10.25 = 75 x 100 =
15
Reduction in rate = 64.40 x 31.67% =
Thus rate for every ½ mile additional lead
beyond 5 miles (64.40 - 20.40) =

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 38
DESCRIPTION OF ITEM:

Item No. 18 Dressing and levelling of earth work to designed section etc., complete:

a) Ashes, Sand, Silt or Soft Soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Dresser 0.20 No. per day -


2 Cooly un-skilled 0.12 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 18 Dressing and levelling of earth work to designed section etc., complete:

b) Ordinary or hard soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Dresser 0.50 No. per day -


2 Cooly un-skilled 0.12 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 39
DESCRIPTION OF ITEM:

Item No. 18 Dressing and levelling of earth work to designed section etc., complete:

c) Gravel work or soft rock not requiring blasting.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Quarryman for dressing 1.00 No. per day -


2 Cooly un-skilled 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 19 Dowel dressing.

Detail Unit Rate (British System) per Chain

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 150 Rft


LABOUR

1 Dresser 0.25 No. per day -


2 Cooly un-skilled 0.10 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 150 Rft -
Rate per 100 Rft

ITEM RATES

Labour rate per Chain Rs. Say -


Labour rate per R.M Rs. Say -

Page 40
DESCRIPTION OF ITEM:

Item No. 20 (a) Dressing Slopes of banks or ground surface.

Detail Unit Rate (British System) per 1000 Sft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Sft


LABOUR

1 Dresser 1.00 No. per day -


2 Cooly un-skilled 0.30 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Sft -

ITEM RATES

Labour rate per 100 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

DESCRIPTION OF ITEM:

Item No. 20 (b) Dressing of earth work (done by Machinery or otherwise and left undressed)
to designed section.

Detail Unit Rate (British System) per 100 Sft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1600 Sft


LABOUR

1 Dresser 1.00 No. per day -


2 Cooly un-skilled 2.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1600 Sft -

ITEM RATES

Labour rate per 100 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

Page 41
DESCRIPTION OF ITEM:

Item No. 21 Excavation in foundation of building, bridges and other structures,


including dag belling, dressing refilling around structure with excavated
earth, watering and ramming, lead upto one chain (30 metre) and lift upto
5 ft. (1.5 metre).

a) In sand, ashes or loose soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging & refilling 5.00 Nos. per day -
2 Coolies un-skilled for carrying earth 3.00 Nos. per day -
3 Dresser 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 21 Excavation in foundation of building, bridges and other structures,


including dag belling, dressing refilling around structure with excavated
earth, watering and ramming, lead upto one chain (30 metre) and lift upto
5 ft. (1.5 metre).

b) In ordinary soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging & refilling 6.00 Nos. per day -
2 Coolies un-skilled for carrying earth 3.00 Nos. per day -
3 Dresser 1.50 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 42
DESCRIPTION OF ITEM:

Item No. 21 Excavation in foundation of building, bridges and other structures,


including dag belling, dressing refilling around structure with excavated
earth, watering and ramming, lead upto one chain (30 metre) and lift upto
5 ft. (1.5 metre).

c) In hard soil or soft murum.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging & refilling 7.00 Nos. per day -
2 Coolies un-skilled for carrying earth 3.00 Nos. per day -
3 Dresser 1.75 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 43
DESCRIPTION OF ITEM:

Item No. 22 Cutting hard rock such as granite, ballast hard line, stone or sand stone
with chisels and lammers for small foundations.

Detail Unit Rate (British System) per 1000 Cft


Rate
Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL

1 Steel 50 Lbs
22.69 kg kg -
2 Charcoal 500 Lbs
##### kg kg -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Hammerman 4 No. for 7 days 28.00 No. per day -


2 Skilled Coolies 4 No. for 7 days 28.00 No. per day -
3 Black smith 1 No. for 7 days 7.00 No. per day -
4 Cooly un-skilled for carrying 1 No. for 7 days 7.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 44
DESCRIPTION OF ITEM:

Item No. 23 Extra for excavation requiring shoring.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


METERIAL

1 Kail Wood for shoring 54.00 0.154 Cft. - P. Cft. -


Total -
Contractor's Profit & Ove ##### Percent -
Total -

LABOUR

1 Cooly un-skilled 1.00 No. per day -


2 Carpenter 0.25 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 24 Compaction of earth work (soft, ordinary or hard soil)


a) Mixing, moistering earth to optimum moister content in layer for
compaction etc. complete.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1 Cooly un-skilled 0.12 No. per day -
2 Bahishti 0.30 No. per day -
3 Dresser earth 0.75 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -

Page 45
DESCRIPTION OF ITEM:

Item No. 24 Compaction of earth work (soft, ordinary or hard soil)

b) Compaction by rolling with animal driven roller/hand rammed.

i) Soft or sandy soil

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Bullockman 1.00 No. per day -


2 Cooly un-skilled 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 24 Compaction of earth work (soft, ordinary or hard soil)

b) Compaction by rolling with animal driven roller/hand rammed.

ii) Ordinary soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Bullockman 1.25 No. per day -


2 Cooly un-skilled 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 46
DESCRIPTION OF ITEM:

Item No. 24 Compaction of earth work (soft, ordinary or hard soil)

b) Compaction by rolling with animal driven roller/hand rammed.

iii) Hard soil.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Bullockman 1.25 No. per day -


2 Cooly un-skilled 0.75 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 24 Compaction of earth work (soft, ordinary or hard soil)

b) Compaction by rolling with animal driven roller/hand rammed.

iv) Admixture of shingle.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Bullockman 1.50 No. per day -


2 Cooly un-skilled 0.75 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 47
DESCRIPTION OF ITEM:

Item No. 24 Compection of earth work (soft, ordinary or hard soil)

c) Ramming earthwork (all type of soil)

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled 1.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 24 Compaction of earth work (soft, ordinary or hard soil)

d) Ramming earthwork behind retaining walls.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for watering & ramming 2.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 48
DESCRIPTION OF ITEM:

Item No. 25 Compaction of earthwork with power road roller, including ploughing,
mixing, moistening earth to optimum moisture content in layers etc.
complete.

i) 95% to 100% maximum modified AASHTO dry density.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1000 Cft


LABOUR

As per item No. 5 (i) of this chapter for machi 0.00 1000 Cft ‰ Cft -

Total Rate for 1000 Cft -

ITEM RATES

Composite rate per 1000 Cft Rs. -


Composite rate per Cum Rs. -

DESCRIPTION OF ITEM:

Item No. 25 Compaction of earthwork with power road roller, including ploughing,
mixing, moistening earth to optimum moisture content in layers etc.
complete.

ii) 90% maximum modified AASHTO dry density.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1000 Cft


LABOUR

As per item No. 5 (ii) of this chapter for mach 0.00 1000 Cft ‰ Cft -

Total Rate for 1000 Cft -

ITEM RATES

Composite rate per 1000 Cft Rs. -


Composite rate per Cum Rs.

Page 49
DESCRIPTION OF ITEM:

Item No. 25 Compaction of earthwork with power road roller, including ploughing,
mixing, moistening earth to optimum moisture content in layers etc.
complete.

iii) 85% maximum modified AASHTO dry density.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1000 Cft


LABOUR

As per item No. 5 (iii) of this chapter for mac 0.00 1000 Cft ‰ Cft -

Total Rate for 1000 Cft -

ITEM RATES

Composite rate per 1000 Cft Rs. -


Composite rate per Cum Rs.

DESCRIPTION OF ITEM:

Item No. 26 Extra for wet earth work.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging, filling & lifting 3.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 50
DESCRIPTION OF ITEM:

Item No. 27 Extra for slush or daldal including dewatering.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging, filling & lifting


and dewatering 8.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 28 Extra for puddling.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Bahishti 1.50 per day -


2 Coolies un-skilled 4.75 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 51
DESCRIPTION OF ITEM:

Item No. 29 Earthwork on small rain water drains along canal banks roads and
plantion drains dressed etc., complete.

Detail Unit Rate (British System) per 100 Rft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 125 Rft


LABOUR

1 Coolies un-skilled 0.95 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate fore 125 Rft -

ITEM RATES

Labour rate per 100 Rft Rs. Say -


Labour rate per metre Rs. Say -

DESCRIPTION OF ITEM:

Item No. 30 Filling and compacting soil earth and boulders behind retaining walls
(including excavation of soil and lead upto 50 ft. (15 metre).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Excavation, carriage & filling 7.00 Nos. per day -


2 Watering and compaction 2.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 52
DESCRIPTION OF ITEM:

Item No. 31 Dag belling 3" (75 mm) deep.

Detail Unit Rate (British System) per Mile

Qty Rate Per Unit Amount (Rs.)

Assume 2500 Rft


LABOUR

1 Dresser 1.40 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate for 1 Mile Rs. Say -


Labour rate for 1 Kilometre Rs. Say -

DESCRIPTION OF ITEM:

Item No. 32 Turfing slopes of banks or lawns with grass sods including ploughing
laying settling and watering (Turf got from within a distance of 5 miles
(8 kilometre) and maintenance for 15 days).

Detail Unit Rate (British System) per 100 Sft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 300 Sft


LABOUR

1 Coolies un-skilled for digging sods 0.50 No. per day -


2 Coolies un-skilled for carrying load 8 km 1.00 No. per day -
3 Laying setting and watering 1.00 No. per day -
4 Watering for 15 days 1.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 300 Sft -

ITEM RATES

Labour rate per 100 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

Page 53
DESCRIPTION OF ITEM:

Item No. 33 Berm cutting

a) Lead upto a single throw of Kassi, phaora or shovel (without dressing).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging including


dag-belling for barrow pits 4.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 33 Berm cutting

b) Upto 50 ft. (15 metre) lead (including dressing).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging filling, dag-belling 4.00 Nos. per day -
2 Carrying 3.00 Nos. per day -
3 Dresser (for slopes and load) 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 54
DESCRIPTION OF ITEM:

Item No. 34 Berm trimming both sides of channels

a) Upto 3½ ft (1 metre) depth.

Detail Unit Rate (British System) per one Mile

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1.5 Miles


LABOUR

1 Dresser's earthwork (for dag-belling & dressing) 2.00 Nos. per day -
2 Coolies un-skilled coolies (for trimming etc.) 12.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 miles -

ITEM RATES

Labour rate for 1 Mile Rs. Say -


Labour rate for 1 Kilometre Rs. Say -

DESCRIPTION OF ITEM:

Item No. 34 Berm trimming both sides of channels

b) Exceeding 3½ ft. (1 metre) to 5 ft (1.5 metre) depth.

Detail Unit Rate (British System) per one Mile

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1.5 Miles


LABOUR

1 Dresser's earthwork (for dag-belling & dressing) 3.00 Nos. per day -
2 Coolies un-skilled 15.50 Nos. per day -
3 Mate earthwork for supervision 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Miles -

ITEM RATES

Labour rate for 1 Mile Rs. Say -


Labour rate for 1 Kilometre Rs. Say -

Page 55
DESCRIPTION OF ITEM:

Item No. 34 Berm trimming both sides of channels

c) Exceeding 5 ft. (1.5 metre) to 8 ft (2.4 metre) depth.

Detail Unit Rate (British System) per one Mile

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1.5 Miles


LABOUR

1 Dresser's earthwork (for dag-belling & dressing) 4.00 Nos. per day -
2 Coolies un-skilled 25.50 Nos. per day -
3 Mate earthwork for supervision 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Miles -

ITEM RATES

Labour rate for 1 Mile Rs. Say -


Labour rate for 1 Kilometre Rs. Say -

DESCRIPTION OF ITEM:

Item No. 35 Ploughing and leveling borrow pits.

i) Upto 3 ft. (914 mm) depth.

Detail Unit Rate (British System) per Acre

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 Bullockman with pair of bullocks 60.00 1.00 No. per day -


2 Coolies un-skilled for leveling 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate per Acre Rs. Say -


Labour rate per Hectare Rs. Say -

Page 56
DESCRIPTION OF ITEM:

Item No. 35 Ploughing and leveling borrow pits.

ii) Above 3 ft (914 mm) depth.

Detail Unit Rate (British System) per Acre

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 Double of item No. 35 (i) = 0.00 508.20 Acre -

ITEM RATES

Labour rate per Acre Rs. Say -


Labour rate per Hectare Rs. Say -

DESCRIPTION OF ITEM:

Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing

(i) In unploughed land.

a) From 10 ft (3 metre) to 20 ft (6 metre) wide.

Detail Unit Rate (British System) per Chain

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1.5 Chain


LABOUR

1 Earth work dresser 0.50 No. per day -


2 Cooly un-skilled 1.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Chain -

ITEM RATES

Labour rate per Chain Rs. Say -


Labour rate per Running Metre Rs. Say -

Page 57
DESCRIPTION OF ITEM:

Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing

(i) In unploughed land.

b) From 20 ft (6 metre) to 40 ft (12 metre) wide.

Detail Unit Rate (British System) per Chain

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1.5 Chain


LABOUR

1 Earth work dresser 1.00 No. per day -


2 Cooly un-skilled 1.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Chains -

ITEM RATES

Labour rate per Chain Rs. Say -


Labour rate per Running Metre Rs. Say -

DESCRIPTION OF ITEM:

Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing

(ii) In ploughed land.

a) From 10 ft. (3 metre) to 20 ft. (6 metre) wide.

Detail Unit Rate (British System) per Chain

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 as per item No.36 (i) (a) 0.00 ÷ 1.5 0.00 -


2 Ploughing charges 0.032 Acre P.Acre -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate per Chain Rs. Say -


Labour rate per Running Metre Rs. Say -

Page 58
DESCRIPTION OF ITEM:

Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing

(ii) In unploughed land.

b) From 20.1 ft. (6.1 metre) to 40 ft. (12 metre) wide.

Detail Unit Rate (British System) per Chain

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 as per item No.36 (i) (b) 0.00 ÷ 1.5 0.00 -


2 Ploughing charges L.S

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate per Chain Rs. Say -


Labour rate per Running Metre Rs. Say -

DESCRIPTION OF ITEM:

Item No. 37 Earthwork by boats including hire of boats.

i) Digging and loading into boats upto 50 ft. (15 metre) lead.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled for digging, filling in baskets


and lifting 4.00 No. per day -
2 Coolies un-skilled for carrying and loading in
boats 3.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 59
DESCRIPTION OF ITEM:

Item No. 37 Earthwork by boats including hire of boats.

ii) Carriage by boat upto 10 chains (300 metres).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

(Capacity of boat 200 Cft 5.66 m³)


LABOUR

1 15 trips in a day/rate for one trip boatman with


large boats per trip 15 trips in a day 0.07 No. per day
2 8 No. extra boatmen (0.53 No. per trip) 0.53 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1 trip (200 Cft -
Rate for 5 trips (100 Cft) 58.27 x 5

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 37 Earthwork by boats including hire of boats.

iii) Extra for every additional one chain (30 metre) or part thereof beyond
10 chain (300 metre).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Analysis for 1250 Cft


LABOUR

1 Extra boatman required for one chain (30 metre) 0.20 No. per day -
lead.

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 60
DESCRIPTION OF ITEM:

Item No. 37 Earthwork by boats including hire of boats including hire of boats.

iv) Unloading earth from Boats.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Coolies un-skilled 3.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 38 Unloading earth from B.G. Tracks and clearing 5 ft. (1.5 metre) from rail.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

1 Cooly un-skilled for unloading and clear 5 ft.


(1.5 metre) 3.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 61
DESCRIPTION OF ITEM:

Item No. 39 Earthwork by train way, digging and loading in truck, upto 50 ft. (15 metr
lead.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Analysis for 1250 Cft


LABOUR

1 Cooly un-skilled for digging and loading 7.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 40 Unloading earth from B.G. trucks and spreading upto 15 ft. (4.5 metre) from
rail.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 Cooly un-skilled for unloading 2.50 Nos. per day -


2 Coolies un-skilled for spreading 2.00 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Page 62
DESCRIPTION OF ITEM:

Item No. 41 Supplying clean and screened river or pit sand within 5 chain (150 metre).

Detail Unit Rate (British System) per 100 Cft

Qty Rate Per Unit Amount (Rs.)

MATERIAL

1 Royalty 100 Cft. % Cft. -

Contractor's Profit & Ove ##### Percent -


Total -

LABOUR

1 Coolies (for excavation of sand, and


removal of pit earth loading and 0.424 No. per day -
screening etc.)

-
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

TOTAL -

CARRIAGE

Ist Chain = -
2nd Chain = -
3rd Chain = -
4th Chain = - -
- -

ITEM RATES

Labour rate per 100 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 100 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 63
DESCRIPTION OF ITEM:

Item No. 42 Earth work excavation inopen cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except, shingle gravel and rock.

(i) 0 ft. to 7.0 ft.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

MATERIAL (For Shutterng 1750 Cft)

1 Vertical planks 26 x 4' x 10" x 1½" = 10.83 Cft


Can be used 80 times
Per time 10.83 ÷ 80 = 0.14 Cft

STRUTS

Wood 26 x 4.75' x 6" x 3" = 15.44 Cft


Can be used 100 times
for one time 15.44 ÷ 100 = 0.154 Cft
Total 0.294 Cft
Wastage 5% 0.0147 Cft
0.31 Cft 0.31 Cft Cft -

Ist class sawing charges 0.31 x 10 = 3.10 Sft 3.1 Sft Sft -

Nail bolts & nuts 0.083 Kg. Per Kg. -

Total -
Contractor's Profit & Ove ##### Percent except sawing charges
i.e on Rs. 0.00 -
Total rate for 1750 Cft -
Total rate for 1000 Cft

1 For excavation coolies un-skilled for 1250 Cft 6.50 Nos. per day -
2 Dresser 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
Labour rate for 1000 Cft -

(b) LABOUR for removing surface water 1250 Cft

1 Cooly un-skilled 0.25 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1250 Cft -
Labour rate per 1000 Cft

(c) LABOUR for shutterng for 1750 Cft

1 Carpenter 0.10 No. per day -


2 Cooly un-skilled 0.40 No. per day -

Page 64
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1750 Cft -
Total rate for 1000 Cft

ITEM RATES

Labour rate for 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 65
DESCRIPTION OF ITEM:

Item No. 42 Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle, gravel and rock.

(ii) 7.01 to 15 ft. (2.1 metre to 4.5 metre).

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Analysis for rate for 2000 Cft


MATERIAL for Shuttering

1 Vertical planks 26 Nos. Ist class kail wood


26 x 8' x 10" x 1½" = 21.67 Cft
Can be use 80 times
21.67 ÷ 80 = 0.27 Cft

2 STRUTS 39 Nos.

Kail wood 39 x 4.75 x 6" x 3" = 23.16 Cft


Can be used 100 times
Wood for one time 23.16 ÷ 100 = 0.23 Cft

Total 1 + 2 = 0.27 + 0.23 = 0.50 Cft


Wastage 5% = 0.03 Cft
0.53 Cft 0.53 Cft Cft -
Sawing charges = 0.53 x 10 = 5.3 Sft 5.30 Sft Sft -
Bolts, nuts & nails 0.083 Kg. Per Kg. -

Total -
Contractor's Profit & Ove ##### Percent 0.00 -
(except on sawing charges)
Total -
Cost per 1000 Cft 212.69 ÷ 2 = 0.00 -

Analysis for 2000 Cft


(a) LABOUR for Shutterng

1 Carpenter 0.20 No. per day -


2 Cooly un-skilled 0.80 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 2000 Cft -
Total rate for 1000 Cft

Page 66
(b) For Excavation 1250 Cft

1 Coolies un-skilled 12.00 Nos. per day -


2 Dresser 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
Total rate for 1000 Cft -

(c) Labour For Dewatering

Coolies un-skilled 0.12 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 67
DESCRIPTION OF ITEM:

Item No. 42 Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle gravel and rock.

(iii) Above 15 ft. (4.5 metre) depth.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Analysis for rate for 2000 Cft

MATERIAL (For Shuttering)

1 Kail wood vertical plants 26 Nos.


26 x 8' x 10" x 1½" = 21.67 Cft
Can be used 80 times
Wood for one time 21.67 ÷ 80 = 0.27 Cft

STRUTS 39 Nos.

2 Kail wood 39 x 4.75 x 6" x 3" = 23.16 Cft


Can be used 100 times
Kail wood for one time 23.16 ÷ 100 = 0.23 Cft

Total ( 1 + 2 ) = 0.27 + 0.23 = 0.50 Cft


Wastage (5%) 0.03 Cft
Total 0.53 Cft 0.53 Cft Cft -

Sawing charges 0.53 x 10 = 5.30 Sft 5.30 Sft Sft -


Bolt, nuts & nails 0.083 Kg. Per Kg. -

Total -
Contractor's Profit & Ove ##### Percent on 189.50 (Except sawing charges) -
Total rate for 2000 Cft -
Cost per 1000 Cft 212.69 ÷ 2 = 0.00 -

Analysis for Rate for 2000 Cft


(a) LABOUR (For Shutterng)

1 Carpenter 0.20 No. per day -


2 Cooly 0.80 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 2000 Cft -
Total rate for 1000 Cft

Page 68
(b) For Excavation 1250 Cft

1 Coolies un-skilled 16.00 No. -


2 Dresser 1.00 No. -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
Total rate for 1000 Cft -

(c) Labour for Dewatering

1 Coolies un-skilled 0.12 No. -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total per 1000 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 69
DESCRIPTION OF ITEM:

Item No. 43 Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.

(i) 0 ft. (0 metre) to 4 ft. (1.2 metre) depth below S.S.W.L.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

MATERIAL

(i) M.S. sheet 8' x 4' x ¼" ft.


For
Excavation 10 Nos.
Platform 2 Nos.
12 Nos.
12 x 8' x 4' = 384 Sft @ 5 lbs/sft = 1920 lbs
Life = 200 times
For one operation 1920 ÷ 200 = 9.60 lbs
(ii) R.S Joist 4 No. 12' long
4 x 12 = 48 Rft @ 20 lbs/Rft = 960 lbs
Life 1500 times
For one operation 960 ÷ 1500 = 0.64 lbs
Total 9.6 + 0.64 = 10.24 lbs 10.24 lbs kg -
4.64 kg
(iii) Jhambs 2.00 Nos.
life = 100 time
One opertion = 2 ÷ 100 = 0.02 No. 0.02 No. each -
(iv) Charakharies complete 2.00 Nos. each -
(v) Kail wood first class planks = 10 Nos.
10 x 10' x 10" x 1½" = 10.41 Cft
Life 20 times
One operation 10.41 ÷ 20 = 0.520 Cft
(vi) Ballies 16.00 Nos.
16 x 10 x 8" x 4" = 35.55 Cft
Life 200 time
One operation = 35.55 ÷ 200 = 0.18 Cft
(vii) Struts = 16.00 Nos.
16 x 6.25' x 8" x 4" = 22.22 Cft
Life = 100 times
One operation = 22.22 ÷ 100 = 0.22 Cft
Kail wood first class total 0.52 + 0.18 + 0.22 0.92 Cft
Wastage (5%) = 0.92 + 0.05 = 0.97 Cft 0.97 Cft Cft -
Sawing charges 0.97 Cft x 10 = 9.7 Sft 9.70 Sft Sft -
Bolts and nuts 0.083 Kg. - Per Kg. -
(viii) Manila Rope 1" 100' long
Life 25 times
One operation = 100 ÷ 25 = 4.00 Rft 4.00 Rft Rft -

Total -
Contractor's Profit & Ove ##### % Except sawing 0.00 -
Total -

Page 70
LABOUR for 1500 Cft

1 Diver sinker 2.00 No. per day -


2 Charakhar-man 4.00 No. per day -
3 Cooly for pully out 2.00 No. per day -
4 Coolies for removing earth 2.00 No. per day -
5 Skilled coolies for hammering M.S sheet to 2.00 No. per day -
drive and takout
6 Cooly for making platform 0.50 No. per day -
7 Carpenter for making shuttering and removing 0.25 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1500 Cft -
Total rate per 1000 Cft

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 71
DESCRIPTION OF ITEM:

Item No. 43 Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.

(ii) 4 ft. to 8 ft. (1.2 metre to 2.4 metre) depth below SSWL

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

MATERIAL

(I) M.S. sheet (8' x 4' x ¼" ft.)


For
Excavation 20 Nos.
Plate form 4 Nos.
24 Nos.
24 x 8' x 4' = 768 Sft @ 5 lbs/Sft = 3840 lbs
Life = 200 times
One operation 3840 ÷ 200 = 19.20 lbs
(ii) R.S. Joist = 4 Nos. 12' long
4 x 12 = 48 Rft @ 20 lbs/Rft = 960 lbs
Life 1500 times
One operation 960 ÷ 1500 = 0.64 lbs
Total 19.84 lbs 19.84 lbs kg -
9.00 kg
(iii) Jhambs = 2.00 Nos.
Life = 100 times
One operation 2 ÷ 100 = 0.02 No. 0.02 No. each -
(iv) Charakharies complete = 2.00 Nos. 2.00 Nos. each -
(v) Wooden planks = 10.00 Nos.
Kail wood first class 10 x 10' x 10" x 1½" = 10.41 Cft
Life 20 times
One operation = 10.41 ÷ 20 = 0.52 Cft
(vi) Ballies = 16.00 Nos.
16 x 10' x 8" x 4" = 35.55 Cft
Life 200 time
One operation 35.55 ÷ 200 = 0.18 Cft
(vii) Struts 16.00 Nos.
16 x 6.25' x 8" x 4" = 22.22 Cft
Life = 100 times
One operation 22.22 ÷ 100 = 0.22 Cft
Kail wood Ist class total 0.52 + 0.18 + 0.22 = 0.92 Cft 0.97 Cft Cft -
Add 5% wastage 0.05 Cft
0.97 Sft
Sawing charges 0.97 x 10 = 9.7 Sft 9.70 Sft Sft -
Bolts and nuts 0.083 Kg. - Per Kg. -
(viii) Manila Rope 1" x 100' long
Life 25 times
One operation 100 ÷ 25 = 4.00 Rft 4.00 Rft Rft -

Total -
Contractor's Profit & Ove ##### Percent -
Total -

Page 72
LABOUR for 1500 Cft

1 Diver sinker 2.50 No. per day -


2 Charakhar-man 5.00 No. per day -
3 Cooly un-skilled for pully out 2.50 No. per day -
4 Coolies un-skilled ramming 2.50 No. per day -
5 Skilled coolies for hammering M.S sheet to 2.50 No. per day -
drive and takout
6 Cooly for making platform 0.63 No. per day -
7 Carpenter for making shuttering and removing 0.31 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1500 Cft -
Total rate per 1000 Cft

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 73
DESCRIPTION OF ITEM:

Item No. 43 Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.

(iii) Exceeding 2.40 metre depth below SSWL.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

MATERIAL

(i) M.S. sheet (8' x 4' x ¼" ft.)


For
Excavation 26 Nos.
Plate form 4 Nos.
30 Nos.

30 x 8' x 4' = 960 Sft @ 5 lbs/Sft = 4800 lbs


One sheet for making jaharies
8 x 4 = 32 Sft @ 5lbs/Sft = 160 lbs
Life = 200 times
for one operation 4960 ÷ 200 = 24.80 lbs
(ii) For R.S. Joist 4 No.
4 x 12 = 48 Rft @ 20 lbs/foot = 960 lbs
Life = 1500 time
One operation = 960 ÷ 1500 = 0.64 lbs 25.44 lbs
Total (I + II) 24.80 + 0.64 = 25.44 lbs 11.54 kg kg -
(iii) Thambs = 2.00 Nos.
Life = 100 times
One operation 2 ÷ 100 = 0.02 No. 0.02 No. each -
(iv) Charakharies complete = 2.00 Nos. 2.00 Nos. each -
(v) Wooden planks = 10.00 Nos.
Kail wood Ist class 10 x 10 x 10" x 5" = 10.41 Cft
Life 20 times
One operation 10.41 ÷ 20 = 0.52 Cft
(vi) Ballies = 16.00 Nos.
16 x 10' x 8" x 4" = 35.55 Cft
Life 200 time
One operation 35.55 ÷ 200 = 0.18 Cft
(vii) Struts = 16.00 Nos.
16 x 6.25 x 8" x 4" = 22.22 Cft
Life = 100 times
One operation = 22.22 ÷ 100 = 0.22 Cft
0.52 + 0.18 + 0.22 = 0.92 Cft
Wastage (5%) 0.05 Cft
Total 0.97 Cft 0.97 Cft Cft -
Sawing charges 0.97 x 10 = 9.70 Sft 9.70 Sft Sft -
Bolts and nuts 0.083 Kg. Per Kg. -
(viii) Manila Rope 1" x 100' long
(vi) Cost of rope
Life 25 times
One operation 100 ÷ 25 = 4.00 Rft 4.00 Rft Per Rft. -

Total -
Contractor's Profit & Ove ##### Percent -
Total Material cost -

Page 74
LABOUR for 1500 Cft

1.5 times of item No. (43-ii) 0.00 -

Total rate per 1500 Cft -


Total rate per 1000 Cft

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

Composite rate per 1000 Cft Rs. Say -


Composite rate per Cum Rs. Say -

Page 75
DESCRIPTION OF ITEM:

Item No. 44 Excavation of trenches in all kind of soil except cutting rock, for water
pipe lines upto to 5 ft. (1.5 metre) depth from ground level including trim
dressing sides, leveling the beds of trenches to correct grade and cutting
pits for joints etc. complete in all respects.

Detail Unit Rate (British System) per 1000 Cft

Qty Rate Per Unit Amount (Rs.)

Analysis for 1250 Cft


LABOUR

1 Coolies for dressing earth 6.50 No. per day -


2 Dewatering the rain 0.50 No. per day -
3 Dresser 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1250 Cft -
Total rate per 1000 Cft -

ITEM RATES

Labour rate per 1000 Cft Rs. Say -


Labour rate per Cum Rs. Say -

DESCRIPTION OF ITEM:

Item No. 45 Cutting and removing trees within a distance of 100 ft. (30 metre).

a) Upto 2.5 ft. (0.75 metre) girth.

Detail Unit Rate (British System) for Each

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 Carpenter 0.15 No. per day -


2 Coolies un-skilled 1.00 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate for each Rs. Say -

Page 76
DESCRIPTION OF ITEM:

Item No. 45 Cutting and removing trees within a distance of 100 ft. (30 metre).

(b) Above 2.5 ft. (0.75 metre) to 6 ft. (1.8 metre) grith.

Detail Unit Rate (British System) for Each

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 Coolies un-skilled 2.00 Nos. per day -


2 Carpenter 0.25 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate for each Rs. Say -

DESCRIPTION OF ITEM:

Item No. 46 Uprooting stump and removing with in 100 ft. (30 metre) from 2" to 6 ft.
(0.61 metre to 1.83 metre) grith.

Detail Unit Rate (British System) for Each

Qty Rate Per Unit Amount (Rs.)

LABOUR

1 Coolies un-skilled 1.50 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate for each Rs. Say -

Page 77
DESCRIPTION OF ITEM:

Item No. 47 Jungle clearance and removing within 100 ft. (30 metre).

(a) Light

Detail Unit Rate (British System) per 1000 Sft

Qty Rate Per Unit Amount (Rs.)

Analysis for 1250 Sft


LABOUR

1 Coolies un-skilled 0.25 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 1250 Sft -

ITEM RATES

Labour rate per 1000 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

DESCRIPTION OF ITEM:

Item No. 47 Jungle clearance and removing within 100 ft. (30 metre).

(b) Thick

Detail Unit Rate (British System) per 1000 Sft

Qty Rate Per Unit Amount (Rs.)

Analysis for 1250 Sft


LABOUR

1 Coolies un-skilled 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 1250 Sft -

ITEM RATES

Labour rate per 1000 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

Page 78
DESCRIPTION OF ITEM:

Item No. 48 Up rooting sarkanda growth and disposal within 100 ft. (30 metre).

Detail Unit Rate (British System) per 100 Sft

Qty Rate Per Unit Amount (Rs.)

Analysis for 125 Sft


LABOUR

1 Coolies un-skilled 0.12 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 125 Sft -

ITEM RATES

Labour rate per 100 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

DESCRIPTION OF ITEM:

Item No. 49 Ploughing 3 times

Detail Unit Rate (British System) per Acre

Qty Rate Per Unit Amount (Rs.)

Assumed for 4.0 Acres


LABOUR

1 Bullock-man 3.25 Nos. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -

ITEM RATES

Labour rate per Acre Rs. Say -


Labour rate per Hectar Rs. Say -

Page 79
DESCRIPTION OF ITEM:

Item No. 50 Levelling, dressing and making lawns

Detail Unit Rate (British System) per 100 Sft

Qty Rate Per Unit Amount (Rs.)

Analysis for 150 Sft


LABOUR

1 Coolies un-skilled 0.60 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 150 Sft -

ITEM RATES

Labour rate per 100 Sft Rs. Say -


Labour rate per Sqm Rs. Say -

DESCRIPTION OF ITEM:

Item No. 51 Turfing lawns (excluding cost of turf).

Detail Unit Rate (British System) per 100 Sft

Qty Rate Per Unit Amount (Rs.)

Analysis for 150 Sft


LABOUR

1 Mali 0.50 No. per day -

Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 150 Sft -

ITEM RATES

Labour rate per 100 Sft Rs. Say -


Labour rate per Sqm Rs. Say -