Earth Work Analysis
Earth Work Analysis
EARTH WORK
(EXCAVATION & EMBANKMENT)
DESCRIPTION OF ITEM:
Item No. 1 Earth work excavation undressed lead upto a single throw of kassi,
Phaorah or shovel.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 1
DESCRIPTION OF ITEM:
Item No. 1 Earth work excavation undressed lead upto a single throw of kassi,
Phaorah or shovel.
b) In ordinary soil.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 2 Earthwork excavation in ashes, sand and soft soil or silt clearance,
undressed lead upto 50 ft (15 metre).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 2
DESCRIPTION OF ITEM:
Item No. 3 Bed clearance and dressing slopes of drains to required sections
including the removal of weeds, roots, etc, disposal of excavated
materials within 50 ft (15 metre) lead.
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 3 Bed clearance and dressing slopes of drains to required sections
including the removal of weeds, roots, etc., disposal of excavated
materials within 50 ft (15 metre) lead.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 3
DESCRIPTION OF ITEM:
Item No. 4 Borrowpit excavation undressed lead upto 100 ft. (30 metre)
a) Ordinary Soil.
1 Coolies unskilled for digging and filling 4.00 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 4 Borrowpit excavation undressed lead upto 100 ft. (30 metre).
b) Hard Soil.
1 Coolies unskilled for digging and filling 5.60 Nos. per day -
2 Coolies unskilled for carrying 3.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 4
DESCRIPTION OF ITEM:
Item No. 5 Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(i) 95% to 100% maximum modified AASHTO dry-density with vibratory roller.
Mixing, Moisterning earth to optimum moisture contant in layer etc.
complete with tractor complete with rotorator blade.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
Total -
ITEM RATES
Page 5
DESCRIPTION OF ITEM:
Item No. 5 Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
Total -
ITEM RATES
Page 6
DESCRIPTION OF ITEM:
Item No. 5 Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
Total -
ITEM RATES
Page 7
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 8
DESCRIPTION OF ITEM:
Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
i) Ordinary
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging, filling & dagbelling 4.00 Nos. per day -
2 Coolies unskilled for carrying 1.50 Nos. per day -
3 Coolies unskilled for temporary diviation 0.50 No. per day -
4 Coolies unskilled for removal of surplus water 0.50 No. per day -
5 Cooly un-skilled 1.00 No. per day -
6 Dresser 1.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 9
DESCRIPTION OF ITEM:
Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
ii) Hard
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging, filling & dagbelling 5.60 Nos. per day -
2 Coolies unskilled for carrying 1.50 Nos. per day -
3 Coolies unskilled for temporary diviation 0.50 No. per day -
4 Coolies unskilled for removal of surplus water 0.50 No. per day -
5 Cooly un-skilled 1.00 No. per day -
6 Dresser 1.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 10
DESCRIPTION OF ITEM:
Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging, filling & dagbelling 7.30 Nos. per day -
2 Coolies unskilled for carrying 1.50 Nos. per day -
3 Coolies unskilled for temporary diviation 0.50 No. per day -
4 Coolies unskilled for removal of surplus water 0.50 No. per day -
5 Cooly un-skilled 1.00 No. per day -
6 Dresser 1.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 11
DESCRIPTION OF ITEM:
Item No. 7 Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
iv) Gravel and Shingle.
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging, filling & dagbelling 10.00 Nos. per day -
2 Coolies unskilled for carrying 4.50 No. per day -
3 Coolies unskilled for temporary diviation 2.00 No. per day -
4 Coolies unskilled for removal of surplus water 1.00 No. per day -
5 Cooly un-skilled 0.50 No. per day -
6 Dresser 2.00 No. per day -
7 Skilled cooly for fixing and timbering
under pinning 0.20 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 12
DESCRIPTION OF ITEM:
Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
i) Ordinary soil
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging and filling 4.00 Nos. per day -
2 Coolies unskilled for carrying 4.00 Nos. per day -
3 Coolies unskilled for removing surface water 0.50 No. per day -
4 Dresser for dressing, fixing shuttering
removing and temporary shuttering 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 13
DESCRIPTION OF ITEM:
Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging and filling 5.60 Nos. per day -
2 Coolies unskilled for carrying 4.00 Nos. per day -
3 Coolies unskilled for removing surface water 0.50 No. per day -
4 Dresser for dressing, fixing shuttering
removing and temporary shuttering 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 14
DESCRIPTION OF ITEM:
Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Coolies unskilled for digging and filling 7.30 Nos. per day -
2 Coolies unskilled for carrying 4.00 Nos. per day -
3 Coolies unskilled for removing surface water 0.50 No. per day -
4 Dresser for dressing, fixing shuttering
removing and temporary shuttering 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 15
DESCRIPTION OF ITEM:
Item No. 8 Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 16
DESCRIPTION OF ITEM:
Item No. 9 Excavation in shingle or gravel formation and rock, not, requiring
blasting, undressed lead upto 100 ft. (30 metre).
i) Dry
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 9 Excavation in shingle or gravel formation and rock, not, requiring
blasting, undressed lead upto 100 ft. (30 metre).
ii) Wet
ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -
Page 17
DESCRIPTION OF ITEM:
Item No. 9 Excavation in shingle or gravel formation and rock, not, requiring
blasting, undressed lead upto 100 ft. (30 metre).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 10 Earth work excavation in irrigation channels, drains, etc., to designed
section, grades and profiles excavated material disposed off and dressed
with in 50 ft (15 metre) lead.
i) Ordinary soil
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -
Page 18
DESCRIPTION OF ITEM:
Item No. 10 Earth work excavation in irrigation channels, drains, etc., to designed
section, grades and profiles excavated material disposed off and dressed
with in 50 ft (15 metre) lead.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -
Page 19
DESCRIPTION OF ITEM:
ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -
DESCRIPTION OF ITEM:
Item No. 11 Excavation in rock dressed to designed section, grades and profiles,
excavated material disposed off within 100 ft. (30 metre) and lift upto 5
(1.5 metre).
a) Soft rock, Slate, Shale, Schist or laterite works, with pick & crowbar.
1 Coolies unskilled for digging & carrying 14.00 Nos. per day -
2 Dresser 4.00 Nos. per day -
3 Bahishti 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -
Page 20
DESCRIPTION OF ITEM:
LABOUR
1 Coolies skilled for boring holes with steel jumper 3.00 Nos. per day -
2 Coolies skilled for tempering & fixing charges 0.13 No. per day -
3 Blowman 1.00 No. per day -
4 Coolies unskilled for digging 12.00 Nos. per day -
5 Breaking coolies un-skilled stone and removing the spoil 9.00 Nos. per day -
6 Mate (skilled cooly) 0.50 No. per day -
7 Dresser 2.00 Nos. per day -
8 Hammerman 1.00 No. per day -
9 Blacksmith for repairing tools etc. 1.00 No per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 21
DESCRIPTION OF ITEM:
Item No. 12 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
i) Grade-I
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 22
DESCRIPTION OF ITEM:
Item No. 12 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
ii) Grade-II
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Quarrymen for boring hole and fixing etc. 4.00 Nos. per day -
2 Digging and breaking
large stone into small one 7.00 Nos. per day -
3 Chiselar for dressing 1.00 No. per day -
4 Bahishti 0.50 No. per day -
5 Black-smith for repairing tools etc. 0.50 Nos. per day -
6 Smithy cooly 0.50 No. per day -
7 Coolies unskilled for remaining spoil
upto 50 ft. (15 metre) lead 6.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 23
DESCRIPTION OF ITEM:
Item No. 12 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
iii) Grade-III
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Quarrymen for boring hole and fixing etc. 5.00 Nos. per day -
2 Digging and breaking large stones
into small one. 8.50 Nos. per day -
3 Chiselar for dressing 1.50 No per day -
4 Bahishti 0.75 No. per day -
5 Blacksmith for repairing tools 0.75 No. per day -
6 Smithy cooly 0.75 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 24
DESCRIPTION OF ITEM:
Item No. 11 (a) Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
iv) Grade-IV
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Quarrymen for boring hole and fixing etc. 6.00 Nos. per day -
2 Digging and breaking large stones
into small one. 9.00 Nos. per day -
3 Chiselar for dressing 2.00 No per day -
4 Bahishti 0.75 No. per day -
5 Blacksmith for repairing tools 1.00 No. per day -
6 Smithy cooly 1.00 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 25
DESCRIPTION OF ITEM:
Item No. 12 Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc., complete.
v) Grade-V
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Quarrymen for boring hole and fixing etc. 7.00 Nos. per day -
2 Digging and breaking large stones
into small one. 10.00 Nos. per day -
3 Chiselar for dressing 2.50 No per day -
4 Bahishti 1.00 No. per day -
5 Blacksmith for repairing tools 1.00 No. per day -
6 Smithy cooly 1.00 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 26
DESCRIPTION OF ITEM:
Item No. 12 Excavation in hard rock requiring blasting, and disposal of excavated
material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc., complete.
vi) Grade-VI
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
1 Quarrymen for boring hole and fixing etc. 8.00 Nos. per day -
2 Digging and breaking large stones
into small one. 10.00 Nos. per day -
3 Chiselar for dressing 3.00 No per day -
4 Bahishti 1.00 No. per day -
5 Blacksmith for repairing tools 1.25 No. per day -
6 Smithy cooly 1.25 No. per day -
7 Coolies un-skilled for removing spoil upto 50 ft.
(15 metre) 6.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 27
DESCRIPTION OF ITEM:
Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
i) Grade-I
LABOUR
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete).
ii) Grade-II
LABOUR
ITEM RATES
Page 28
DESCRIPTION OF ITEM:
Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
iii) Grade-III
LABOUR
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
iv) Grade-IV
LABOUR
ITEM RATES
Page 29
DESCRIPTION OF ITEM:
Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
v) Grade-V
LABOUR
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 12 (b) Excavation in hard rock requiring blasting, but blasting prohibited, and
disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
vi) Grade-VI
ITEM RATES
Page 30
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 31
DESCRIPTION OF ITEM:
Item No. 14 Rehandling of gravel work or excavated rock, lead upto 50 ft. (15 metre).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 32
DESCRIPTION OF ITEM:
ii) With new earth excavated from outside, lead upto one chain (30 metre).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 33
DESCRIPTION OF ITEM:
Item No. 16 Extra for every 50 ft. (15 metre) additional lead or part thereof.
(a) 28 men detailed as below Kharkar (owner) 1.00 No. per month -
Belcha men for excavation 8.00 Nos. per month -
Gantiman (with pick axes) 4.00 Nos. per month -
Topalies (men with donkeys for carrying earth) 10.00 Nos. per month -
Langri (Cooks) 2.00 Nos. per month -
Chowkidars 2.00 Nos. per month -
Dobashi (man for supervision) 1.00 No. per month -
Total -
Exenditure per day 0 0.00 -
30
(b) Jamadari commission for supplying labour on Rs.
0.00 @ 6% -
(c) Food etc as under
i) One seer Atta per man daily for 28 men 28.00 seer per kg -
26.12 kg
ii) Kitchen expenses (tea meat, milk,
fuel, fat & aplienees) L.S. -
iii) Lantern, Patromax lamp depreciation
and K. oil consumption L.S. -
iv) Kitchen Utensil, cost of repair and
replacement etc. L.S. -
Total: = a + b + c = 0.00 -
II - i)Donkeys
28 Nos. Donkeys worker 500 ft. lead in belcha
7 No. Donkey in each belcha
Average working life of one donkey 6 years
Average cost price of one donkey = 0.00
After depriceation cost of one donkey = 0.00
Amount per day 28 x 0 = 0.00
6 x 365 Say -
ii) Food etc as under for 28 donkeys
Phak, 5 seers (4.67 kg) per day per donkey
= 28 x 5 = 3.50 mds 3.50 mds per Md -
40
Grams, 2 seers (0.933 x 2) = 1.866 kg per donkey
Per day 28 x 2 = 1.40 mds 1.40 mds per Md -
40
Total-II -
iii) Material
Page 34
replacement etc. 2.00 Nos. each -
e) Sutli consumption 0.6 Kg. - P. Kg. -
Total - III -
Rate for 1000 Cft lead 50' as per item No. (10-i) SR
of this Chapter 0.00
Difference for lead 450ft 0.00 - 0.00 0.00
Rate for 50 ft. lead 0.00 0.00
9
Rate for every 50 ft. add lead or a part thereof
iii) Progress per belcha in hard soil 1150 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000 = 0.00
1150
Page 35
9
Rate for eveyr 50 ft. Add. lead or part thereof
(i) (iFor gravel, shingle or rock extra labour required This rate shall apply to
for 1000 Cft. The carriage of spoil from these lead upto ½ mile when
formalities over and above that required for soil the lead is more than
is 20% ½ mile lead shall be
paid as carriage of
material by
mechanical mean.
0.00 x 20 0.00 -
100.00
ITEM RATES
Page 36
DESCRIPTION OF ITEM:
Item No. 17 Transportation of earth all types when the total distance, including the l
covered in the item of work, is more than 1000 ft.
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 17 (b) For every 330 ft. additional lead or part-thereof, beyond ¼ mile upto one m
ITEM RATES
Page 37
DESCRIPTION OF ITEM:
Item No. 17 (c) For every ¼ mile additional lead or part thereof, beyond one mile upto 5 m
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 17 (d) For every ½ mile additional lead or part thereof, beyond 5 miles.
ITEM RATES
Page 38
DESCRIPTION OF ITEM:
Item No. 18 Dressing and levelling of earth work to designed section etc., complete:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 18 Dressing and levelling of earth work to designed section etc., complete:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 39
DESCRIPTION OF ITEM:
Item No. 18 Dressing and levelling of earth work to designed section etc., complete:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 150 Rft -
Rate per 100 Rft
ITEM RATES
Page 40
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Sft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 20 (b) Dressing of earth work (done by Machinery or otherwise and left undressed)
to designed section.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1600 Sft -
ITEM RATES
Page 41
DESCRIPTION OF ITEM:
1 Coolies un-skilled for digging & refilling 5.00 Nos. per day -
2 Coolies un-skilled for carrying earth 3.00 Nos. per day -
3 Dresser 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
b) In ordinary soil.
1 Coolies un-skilled for digging & refilling 6.00 Nos. per day -
2 Coolies un-skilled for carrying earth 3.00 Nos. per day -
3 Dresser 1.50 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 42
DESCRIPTION OF ITEM:
1 Coolies un-skilled for digging & refilling 7.00 Nos. per day -
2 Coolies un-skilled for carrying earth 3.00 Nos. per day -
3 Dresser 1.75 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 43
DESCRIPTION OF ITEM:
Item No. 22 Cutting hard rock such as granite, ballast hard line, stone or sand stone
with chisels and lammers for small foundations.
1 Steel 50 Lbs
22.69 kg kg -
2 Charcoal 500 Lbs
##### kg kg -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 44
DESCRIPTION OF ITEM:
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
ITEM RATES
Labour rate per 1000 Cft Rs. Say -
Labour rate per Cum Rs. Say -
Page 45
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 46
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 47
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
1 Coolies un-skilled for watering & ramming 2.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 48
DESCRIPTION OF ITEM:
Item No. 25 Compaction of earthwork with power road roller, including ploughing,
mixing, moistening earth to optimum moisture content in layers etc.
complete.
As per item No. 5 (i) of this chapter for machi 0.00 1000 Cft ‰ Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 25 Compaction of earthwork with power road roller, including ploughing,
mixing, moistening earth to optimum moisture content in layers etc.
complete.
As per item No. 5 (ii) of this chapter for mach 0.00 1000 Cft ‰ Cft -
ITEM RATES
Page 49
DESCRIPTION OF ITEM:
Item No. 25 Compaction of earthwork with power road roller, including ploughing,
mixing, moistening earth to optimum moisture content in layers etc.
complete.
As per item No. 5 (iii) of this chapter for mac 0.00 1000 Cft ‰ Cft -
ITEM RATES
DESCRIPTION OF ITEM:
1 Coolies un-skilled for digging, filling & lifting 3.50 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 50
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 51
DESCRIPTION OF ITEM:
Item No. 29 Earthwork on small rain water drains along canal banks roads and
plantion drains dressed etc., complete.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate fore 125 Rft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 30 Filling and compacting soil earth and boulders behind retaining walls
(including excavation of soil and lead upto 50 ft. (15 metre).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 52
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 32 Turfing slopes of banks or lawns with grass sods including ploughing
laying settling and watering (Turf got from within a distance of 5 miles
(8 kilometre) and maintenance for 15 days).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 300 Sft -
ITEM RATES
Page 53
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
1 Coolies un-skilled for digging filling, dag-belling 4.00 Nos. per day -
2 Carrying 3.00 Nos. per day -
3 Dresser (for slopes and load) 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 54
DESCRIPTION OF ITEM:
1 Dresser's earthwork (for dag-belling & dressing) 2.00 Nos. per day -
2 Coolies un-skilled coolies (for trimming etc.) 12.00 Nos. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 miles -
ITEM RATES
DESCRIPTION OF ITEM:
1 Dresser's earthwork (for dag-belling & dressing) 3.00 Nos. per day -
2 Coolies un-skilled 15.50 Nos. per day -
3 Mate earthwork for supervision 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Miles -
ITEM RATES
Page 55
DESCRIPTION OF ITEM:
1 Dresser's earthwork (for dag-belling & dressing) 4.00 Nos. per day -
2 Coolies un-skilled 25.50 Nos. per day -
3 Mate earthwork for supervision 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Miles -
ITEM RATES
DESCRIPTION OF ITEM:
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 56
DESCRIPTION OF ITEM:
LABOUR
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Chain -
ITEM RATES
Page 57
DESCRIPTION OF ITEM:
Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1.5 Chains -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 58
DESCRIPTION OF ITEM:
Item No. 36 Making boundry or service roads including dag-belling, levelling & dressing
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
DESCRIPTION OF ITEM:
i) Digging and loading into boats upto 50 ft. (15 metre) lead.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 59
DESCRIPTION OF ITEM:
ITEM RATES
DESCRIPTION OF ITEM:
iii) Extra for every additional one chain (30 metre) or part thereof beyond
10 chain (300 metre).
1 Extra boatman required for one chain (30 metre) 0.20 No. per day -
lead.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1250 Cft -
ITEM RATES
Page 60
DESCRIPTION OF ITEM:
Item No. 37 Earthwork by boats including hire of boats including hire of boats.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 38 Unloading earth from B.G. Tracks and clearing 5 ft. (1.5 metre) from rail.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total Rate for 1250 Cft -
ITEM RATES
Page 61
DESCRIPTION OF ITEM:
Item No. 39 Earthwork by train way, digging and loading in truck, upto 50 ft. (15 metr
lead.
1 Cooly un-skilled for digging and loading 7.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 40 Unloading earth from B.G. trucks and spreading upto 15 ft. (4.5 metre) from
rail.
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 62
DESCRIPTION OF ITEM:
Item No. 41 Supplying clean and screened river or pit sand within 5 chain (150 metre).
MATERIAL
LABOUR
-
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
TOTAL -
CARRIAGE
Ist Chain = -
2nd Chain = -
3rd Chain = -
4th Chain = - -
- -
ITEM RATES
Page 63
DESCRIPTION OF ITEM:
Item No. 42 Earth work excavation inopen cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except, shingle gravel and rock.
STRUTS
Ist class sawing charges 0.31 x 10 = 3.10 Sft 3.1 Sft Sft -
Total -
Contractor's Profit & Ove ##### Percent except sawing charges
i.e on Rs. 0.00 -
Total rate for 1750 Cft -
Total rate for 1000 Cft
1 For excavation coolies un-skilled for 1250 Cft 6.50 Nos. per day -
2 Dresser 1.00 No. per day -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
Labour rate for 1000 Cft -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1250 Cft -
Labour rate per 1000 Cft
Page 64
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1750 Cft -
Total rate for 1000 Cft
ITEM RATES
Page 65
DESCRIPTION OF ITEM:
Item No. 42 Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle, gravel and rock.
2 STRUTS 39 Nos.
Total -
Contractor's Profit & Ove ##### Percent 0.00 -
(except on sawing charges)
Total -
Cost per 1000 Cft 212.69 ÷ 2 = 0.00 -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 2000 Cft -
Total rate for 1000 Cft
Page 66
(b) For Excavation 1250 Cft
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
Total rate for 1000 Cft -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 67
DESCRIPTION OF ITEM:
Item No. 42 Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle gravel and rock.
STRUTS 39 Nos.
Total -
Contractor's Profit & Ove ##### Percent on 189.50 (Except sawing charges) -
Total rate for 2000 Cft -
Cost per 1000 Cft 212.69 ÷ 2 = 0.00 -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 2000 Cft -
Total rate for 1000 Cft
Page 68
(b) For Excavation 1250 Cft
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate for 1250 Cft -
Total rate for 1000 Cft -
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total per 1000 Cft -
ITEM RATES
Page 69
DESCRIPTION OF ITEM:
Item No. 43 Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
MATERIAL
Total -
Contractor's Profit & Ove ##### % Except sawing 0.00 -
Total -
Page 70
LABOUR for 1500 Cft
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1500 Cft -
Total rate per 1000 Cft
ITEM RATES
Page 71
DESCRIPTION OF ITEM:
Item No. 43 Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(ii) 4 ft. to 8 ft. (1.2 metre to 2.4 metre) depth below SSWL
MATERIAL
Total -
Contractor's Profit & Ove ##### Percent -
Total -
Page 72
LABOUR for 1500 Cft
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1500 Cft -
Total rate per 1000 Cft
ITEM RATES
Page 73
DESCRIPTION OF ITEM:
Item No. 43 Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
MATERIAL
Total -
Contractor's Profit & Ove ##### Percent -
Total Material cost -
Page 74
LABOUR for 1500 Cft
ITEM RATES
Page 75
DESCRIPTION OF ITEM:
Item No. 44 Excavation of trenches in all kind of soil except cutting rock, for water
pipe lines upto to 5 ft. (1.5 metre) depth from ground level including trim
dressing sides, leveling the beds of trenches to correct grade and cutting
pits for joints etc. complete in all respects.
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total rate per 1250 Cft -
Total rate per 1000 Cft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 45 Cutting and removing trees within a distance of 100 ft. (30 metre).
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 76
DESCRIPTION OF ITEM:
Item No. 45 Cutting and removing trees within a distance of 100 ft. (30 metre).
(b) Above 2.5 ft. (0.75 metre) to 6 ft. (1.8 metre) grith.
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 46 Uprooting stump and removing with in 100 ft. (30 metre) from 2" to 6 ft.
(0.61 metre to 1.83 metre) grith.
LABOUR
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 77
DESCRIPTION OF ITEM:
Item No. 47 Jungle clearance and removing within 100 ft. (30 metre).
(a) Light
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 1250 Sft -
ITEM RATES
DESCRIPTION OF ITEM:
Item No. 47 Jungle clearance and removing within 100 ft. (30 metre).
(b) Thick
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 1250 Sft -
ITEM RATES
Page 78
DESCRIPTION OF ITEM:
Item No. 48 Up rooting sarkanda growth and disposal within 100 ft. (30 metre).
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 125 Sft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total -
ITEM RATES
Page 79
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 150 Sft -
ITEM RATES
DESCRIPTION OF ITEM:
Total -
Sundries ##### Percent -
Total -
Contractor's Profit & Ove ##### Percent -
Total for 150 Sft -
ITEM RATES
Page 80