0% found this document useful (0 votes)
44 views21 pages

Itp LV SWGR

The document outlines a Site Inspection and Test Plan focusing on health, safety, sustainability, and quality for a project. It details various inspection points, including work preparation, verifications before and after installation, final inspections, and commissioning processes, with specific requirements for approvals and checks. Each section includes hold or witness points, responsible departments, and necessary documentation to ensure compliance and quality assurance throughout the project lifecycle.

Uploaded by

Adel Morsy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views21 pages

Itp LV SWGR

The document outlines a Site Inspection and Test Plan focusing on health, safety, sustainability, and quality for a project. It details various inspection points, including work preparation, verifications before and after installation, final inspections, and commissioning processes, with specific requirements for approvals and checks. Each section includes hold or witness points, responsible departments, and necessary documentation to ensure compliance and quality assurance throughout the project lifecycle.

Uploaded by

Adel Morsy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

CARILLION CORE FORM

HEALTH, SAFETY, SUSTAINABILITY AND QUALITY


Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

1 WORK PREPARATION
Collect all relevant shop drawings and Approved
Prior to start
1.1 documents at the latest revision
IFC Drawings
the work
Shop H H R N/A
Drawings
Verify that all the relevant material is ready Approved
with respect to the required quantity, type and Prior to start
1.2 Material Sub. No.
the work
Material H H R N/A
specifications. Submittal

Verify that the relevant method statement is Approved


ASU-QC-EL-LV SWGR-MS- Prior to start
1.3 approved and is the last revision GEN-001 the work
Method H R R N/A
Statement
Verify that the relevant ITP used is approved ASU-QC-EL-LV SWGR-MS- Prior to start
1.4 and is the last revision GEN-001 the work
Approved ITP H R R N/A

Verify that the relevant risk assessment is ASU/MEP/EXPO2020/RA- Prior to start Approved Risk
1.5 approved and is the last revision 016 the work Assessment
H R R N/A

Verify that all necessary authorities’ approvals Prior to start


1.6 had been done N/A
the work
NOC,..etc H R R A

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 1/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

2 VERIFICATIONS BEFORE INSTALLATION


Verify that safety requirements are applied Prior to start
2.1 N/A
the work
N/A H H R N/A

Verify that relevant civil works are over. Prior to start


2.2 N/A
the work
N/A H H R N/A

Verify that all necessary tools and equipment


are available with relevant calibration Prior to start
2.3 N/A
the work
Cal. Cer. H R R H
certificates.

Material request for inspection Prior to start


2.4 N/A
the work
MIR No. H H R N/A

Verify the positioning, leveling & alignment of ASU-QC-EL-LV


the supports and structures that the Prior to start SWGR-QR-GEN-
2.5 N/A
the work 001 H M M N/A
equipment to be mounted on.

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 2/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

3 VERIFICATIONS AFTER INSTALLATION


ASU-QC-EL-LV
Perform Visual and Mechanical Inspection. Make After SWGR
3.1 sure that there is no physical defects or damage
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R W N/A

ASU-QC-EL-LV
Check the panel board nameplate data and After SWGR
3.2 compare with drawings and specifications
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R M N/A

Inspect anchorage, alignment, grounding, and ASU-QC-EL-LV


After SWGR
3.3 required area clearances SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R M N/A

Verify that fuse and circuit breaker sizes and


types correspond to drawings and coordination ASU-QC-EL-LV
After SWGR
3.4 study as well as to the circuit breakers address for SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R R N/A

microprocessor-communication packages.
ASU-QC-EL-LV
Verify that current and voltage transformer ratios After SWGR
3.5 correspond to drawings.
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R R N/A

Verify tightness of accessible bolted electrical ASU-QC-EL-LV


After SWGR
3.6 connections by calibrated torque-wrench method SECTION 26 2300 installation
SWGR-QR-GEN- H H W M
in accordance with manufacturer’s published data 001
ASU-QC-EL-LV
Inspect insulators for evidence of physical After SWGR
3.7 damage or contaminated surfaces.
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H H M N/A

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 3/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

ASU-QC-EL-LV
After SWGR
3.8 Verify the compartment doors alignment SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R W N/A

Verify that filters are in place and vents are ASU-QC-EL-LV


After SWGR
3.9 clear
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R R N/A

Perform visual and mechanical inspection of ASU-QC-EL-LV


After SWGR
3.10 instrument transformers
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R M N/A

Perform insulation-resistance tests on each ASU-QC-EL-LV


After SWGR
3.11 bus section, phase-to-phase and phase-to- SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R W W
ground, for one minute.
Ensure electrical continuity between:
- All metal parts and main earth bar ASU-QC-EL-LV
After SWGR
3.12 - Door and main earth bar SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R W W
- Continuity test according to control circuit
diagram
4 FINAL INSPECTION
Make sure that all checks have been ASU-QC-EL-LV
4.1 performed before handing over the system to SECTION 26 2300 All Locations SWGR-QR- H R R N/A
commissioning department. GEN-001

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 4/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

Make sure that all relevant checks lists and


test sheets had been filled and signed by all ASU-QC-EL-LV
4.2 the concerned parties before handing over the N/A All Locations SWGR-QR-
GEN-001
H R R N/A

system to commissioning department.


Make sure that all relevant NCR had been
4.3 closed and signed by all the concerned parties
N/A All Locations NCR Closeout H R R N/A

Make sure that all relevant corrective actions Corrective


4.4 had been taken and approved by all the SECTION 26 2300 All Locations action H R R N/A
concerned parties. Number
IR &
Make sure that the area is left clean and Checklist
4.5 secure3 and that all safety equipment are still N/A All Locations ASU-QC-EL-LV H R R N/A
SWGR-QR-
installed and ready to be used. GEN-001

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 5/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

5 COMMISSIONING
Refer to Gnd
5.1 Perform ground-resistance tests. SECTION 26 2300 All Location
Res. Test
H R,W W N/A

Verify correct functioning of draw out ASU-QC-EL-LV


5.2 disconnecting and grounding contacts and SECTION 26 2300 All Location SWGR-QR-GEN- H R M H
interlocks. 003

Perform resistance measurements through ASU-QC-EL-LV


5.3 bolted electrical connections with a low- SECTION 26 2300 All Location SWGR-QR-GEN - H R M H
resistance ohmmeter, if applicable 004

Perform Dielectric test on the bus bar. Test voltage


ASU-QC-EL-LV
of 2.5kV for 1 minute shall be applied between
5.4 Phase to phase, Phase to neutral, Phase to earth &
SECTION 26 2300 All Location SWGR-QR-GEN -
008
H R M H
Neutral to earth
ASU-QC-EL-LV
Perform Earth Leakage Test for earth leakage
5.5 circuit breakers by means of RCCB tester.
SECTION 26 2300 All Location SWGR-QR-GEN -
009
H R M H

ASU-QC-EL-LV
Perform a polarity test for the incoming supply by
5.6 polarity tester before energizing panels
SECTION 26 2300 All Location SWGR-QR-GEN
010
H R M H

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 6/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4
ASU-QC-EL-LV
5.7 Check the outgoing circuits with hand lamp. SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H

Determine accuracy of all meters and calibrate watt ASU-QC-EL-LV


5.8 hour meter. SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H

Control Power Transformers test:


- Perform insulation-resistance tests. Perform
measurements from winding-to-winding and
each winding-to-ground. Test voltages shall be
in accordance to which specified by the
manufacturer. ASU-QC-EL-LV
5.9 - Perform a turns-ratio test on all tap positions if
SECTION 26 2300 All Location SWGR-QR-GEN
005
H R M H
applicable
- Verify correct secondary voltage by energizing
the primary winding with system voltage.
Measure secondary voltage with the secondary
wiring disconnected.
Voltage Transformers test ASU-QC-EL-LV
5.10 - Verify secondary voltages by energizing the SECTION 26 2300 All Location SWGR-QR-GEN
006
H R M H
primary winding with system voltage.

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 7/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

ASU-QC-EL-LV
5.11 Perform system function tests. SECTION 26 2300 All Location SWGR-QR-GEN
003
H R W H

Confirm correct operation and sequencing of


electrical and mechanical interlock systems.
- Attempt closure on locked-open devices. ASU-QC-EL-LV
5.12 Attempt to open locked-closed devices.
SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H

- Make key exchange with devices operated


in off-normal positions.
Checking the proper operation of indicator ASU-QC-EL-LV
5.13 lamps (with transformers), voltmeter etc.
SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 8/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4
Current Transformers test
- Perform current tests by primary injection with
ASU-QC-EL-LV
magnitudes such that a minimum of 1.0 ampere
5.14 flows in the secondary circuit. Verify correct
SECTION 26 2300 All Location SWGR-QR-GEN-
007
H R M H

magnitude of current at each device in the


circuit.
ASU-QC-EL-LV
Perform phasing checks on double-ended or dual-
5.15 source switchgear to insure correct bus
SECTION 26 2300 All Location SWGR-QR-GEN
003
H R R H

Verify correct function of control transfer relays ASU-QC-EL-LV


5.16 located in the switchgear with multiple control SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H
power sources.

ASU-QC-EL-LV
5.17 Check functions of motor operated ACB/MCCBs SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H

ASU-QC-EL-LV
Verify operation of cubicle switchgear/switchboard
5.18 space heaters.
SECTION 26 2300 All Location SWGR-QR-GEN
003
H R R H

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 9/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

6 SYSTEM HANDING OVER


Include this ITP and relevant test certificates in the
Related
erection and commissioning records set as per the SECTION 26 2300
6.1 project specific management documentation
All Location Quality H R R,A R
Records
procedure.
Hand over Maintenance Materials:
- Enclosure Keys: Two of each different key SECTION 26 2300 Hand over
6.2 All Location
documents
H R R,A N/A
- Circuit Breakers
Letter of
6.3 Hand over valid warranty documents SECTION 26 2300 All Location
warranty
H R,W R,A N/A

6.4 Hand over the O&M Manuals SECTION 26 2300 All Location O&M Manuals H R R,A N/A

6.5 Hand over Spare parts and associated lists SECTION 26 2300 All Location Spare part list H R R,A N/A

Training
6.6 Perform Trainings as required. SECTION 26 2300 All Location Attendance H R R,A N/A
log

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 10/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY
Making tomorrow a better place
SITE INSPECTION AND TEST PLAN Freq. Of Related HOLD OR WITNESS POINTS
Specs OR Clause Ref Inspection OR Records
Point Test Approval Generated
Description
N°. 1 2 3 4

ASU AFC EXPO 2020 Rep.


Nom

Signature

Date

Symboles, Abreviations :

1. ASU 2. AFC 3. EXPO2020 REP. 4. Third Party

R: Review A: Approval M: Monitor H: Hold Point W: Witness


Responsible Dept. : QA/QC Prepared by : QC ENGINEER Verified by: QA/QC Manager Approved by: Project Director

Rev: Lang. Page: DOCUMENT Number


1 En 11/11 ASU-QC-EL-LV SWGR-ITP-GEN-001

CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Field Verifications Checks Low Voltage Switchgear


DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-001
Description Acc. Rej. Remarks
- Alignment, positioning and leveling of supports structure

- Compartments are free from physical damage

- Name plate and data are matching with the drawings and conform with
the project specifications

- Lose material (fuses, breakers, relays) ratings’ are matching with the
drawings and requirements

- The IP protection is matching with the specifications.

- Doors are aligned and operating freely without obstacles


- Instrument transformers ration conforms to the drawings and
requirements
- Isolators are free of damage

- Bolted connections for the bus bars are tightened to torque values
complying with the manufacturer recommendations

- Wirings identification is matching with the drawings

- Devices identification is matching with the drawings

- Connection to grounding completed

- Insulation resistance test on the bus bar had been performed ASU-QC-EL-LV SWGR-
QR-GEN-002
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Bus Bar Insulation Resistance


Low Voltage Switchgear
Test

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-002

Test Device Brand / Model: Calibration Date:

Room Temperature= ᵒᴄ Relative Humidity= %

Test Voltage Between Applied Test Voltage Result Resistance (MΩ)


L1-L2
L1-L3
L2-L3
L1-E
L2-E
L3-E
L1-N
L2-N
L3-N

Remarks

Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place


Commissioning Verifications Low Voltage Switchgear
DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-003
Description Acc. Rej. Remarks
- Electrical and mechanical interlock systems are operating and sequencing
correctly
- Where possible, contact resistance test had been performed on the bus ASU-QC-EL-LV
bar joints SWGR-QR-GEN-004
Refer to dedicated
- Ground-resistance test had been performed test sheet
- All meters and calibrate watt hour meter are accurate.
ASU-QC-EL-LV
- Current transformer had been tested properly SWGR-QR-GEN-007
ASU-QC-EL-LV
- Voltage transformer had been tested properly SWGR-QR-GEN-006
ASU-QC-EL-LV
- Power transformer had been tested properly SWGR-QR-GEN-005
- Control relays are operated correctly
- Space heaters are operated correctly
- Indicator lamps, transformers, voltmeter, etc. are operated properly
- Outgoing circuits had been verified by hand lamp
- Motor operated ACB/MCCBs had been verified for proper operation as
per manufacturer instructions
- Electrical continuity between main earth bar and all metal parts and doors
had been verified
- Earth leakage test for earth leakage circuit breakers had been performed ASU-QC-EL-LV
SWGR-QR-GEN -009
- Earth Fault Loop Impedance Test had been performed ASU-QC-EL-LV
SWGR-QR-GEN -010
- Polarity Test had been performed
ASU-QC-EL-LV
- Dielectric test between bus bars had been performed SWGR-QR-GEN 008
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Bus Bar Contact Resistance Low Voltage Switchgear

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-004

Test Device Brand / Model: Calibration Date:

Reference Point Phase No Measured Reference Point Phase No Measured


Resistance Resistance µΩ)
(µΩ)
-
-
-
-
-
-
-
-
-
-

Values Should Not Exceed The Maximum Value Mentioned In The Manufacturer Instructions.

Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place


Control Power Transformers test Sheet Low Voltage Switchgear
DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-005
INSULATION RESISTANCE ON WINDINGS
Test Device Brand / Model: Calibration Date:

Room Temperature= ᵒᴄ Relative Humidity= %


Applied Test Result Resistance Applied Test Result Resistance
Primary Windings Sec. Windings
Voltage (MΩ) Voltage (MΩ)

L1-L2 L1-L2
L1-L3 L1-L3
L2-L3 L2-L3
L1-E L1-E
L2-E L2-E
L3-E L3-E
1- TURNS RATIO TEST
Test Device Brand / Model: Calibration Date:

Room Temperature= ᵒᴄ Relative Humidity= %


Induced Voltage
Applied Voltage on
Tap Position PR. Windings. V1
On Sec Windings. Value V2/V1
V2
Position 1
Position 2
Position 3
Position 4
2- Voltage Test.
Applied Voltage on PR. Windings= Induced Voltage on SEC. Windings=
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date

Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Voltage Transformers test Sheet Low Voltage Switchgear

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-006

Voltage Transformer Test

VT Number Applied Voltage on PR. Induced Voltage on SEC. Windings


Windings

Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place


Current Transformers test Sheet Low Voltage Switchgear

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-007

Current Transformer Test

CT Number Applied Current on PR. Induced Current on SEC. Windings


Windings

Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Bus Bar Dielectric Test Low Voltage Switchgear

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-008

Test Device Brand / Model: Calibration Date:

Room Temperature= ᵒᴄ Relative Humidity= %

Test Voltage Between Applied Test Voltage Leakage Current


L1-L2
L1-L3
L2-L3
L1-E
L2-E
L3-E
L1-N
L2-N
L3-N
N-E
Remarks

Panel Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep


Identification
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Earth Leakage Test Low Voltage Switchgear

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-009

RCCB Test Device Brand / Model: Calibration Date:

Room Temperature= ᵒᴄ Relative Humidity= %

RCCB Device Number % Current Applied Trip Time Recorded


50 %
100 %
150 %

Remarks

Panel Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep


Identification
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1
CARILLION CORE FORM
HEALTH, SAFETY, SUSTAINABILITY AND QUALITY

Making tomorrow a better place

Polarity Test Low Voltage Switchgear

DOCUMENT NUMBER: ASU-QC-EL-LV SWGR-QR-GEN-010

Polarity Tester Device Brand / Model: Calibration Date:

Room Temperature= ᵒᴄ Relative Humidity= %

Incoming Supply Number Polarity Sequence Comments

Panel Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep


Identification
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date

Doc. Originator: ALSHAFAR UNITED Doc. Rev. Date Page


1 23 Dec. 2017 1 of 1

You might also like