Itp LV SWGR
Itp LV SWGR
1 WORK PREPARATION
Collect all relevant shop drawings and Approved
Prior to start
1.1 documents at the latest revision
IFC Drawings
the work
Shop H H R N/A
Drawings
Verify that all the relevant material is ready Approved
with respect to the required quantity, type and Prior to start
1.2 Material Sub. No.
the work
Material H H R N/A
specifications. Submittal
Verify that the relevant risk assessment is ASU/MEP/EXPO2020/RA- Prior to start Approved Risk
1.5 approved and is the last revision 016 the work Assessment
H R R N/A
Symboles, Abreviations :
Symboles, Abreviations :
ASU-QC-EL-LV
Check the panel board nameplate data and After SWGR
3.2 compare with drawings and specifications
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R M N/A
microprocessor-communication packages.
ASU-QC-EL-LV
Verify that current and voltage transformer ratios After SWGR
3.5 correspond to drawings.
SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R R N/A
Symboles, Abreviations :
ASU-QC-EL-LV
After SWGR
3.8 Verify the compartment doors alignment SECTION 26 2300 installation
SWGR-QR-GEN-
001
H R W N/A
Symboles, Abreviations :
Symboles, Abreviations :
5 COMMISSIONING
Refer to Gnd
5.1 Perform ground-resistance tests. SECTION 26 2300 All Location
Res. Test
H R,W W N/A
ASU-QC-EL-LV
Perform a polarity test for the incoming supply by
5.6 polarity tester before energizing panels
SECTION 26 2300 All Location SWGR-QR-GEN
010
H R M H
Symboles, Abreviations :
Symboles, Abreviations :
ASU-QC-EL-LV
5.11 Perform system function tests. SECTION 26 2300 All Location SWGR-QR-GEN
003
H R W H
Symboles, Abreviations :
ASU-QC-EL-LV
5.17 Check functions of motor operated ACB/MCCBs SECTION 26 2300 All Location SWGR-QR-GEN
003
H R M H
ASU-QC-EL-LV
Verify operation of cubicle switchgear/switchboard
5.18 space heaters.
SECTION 26 2300 All Location SWGR-QR-GEN
003
H R R H
Symboles, Abreviations :
6.4 Hand over the O&M Manuals SECTION 26 2300 All Location O&M Manuals H R R,A N/A
6.5 Hand over Spare parts and associated lists SECTION 26 2300 All Location Spare part list H R R,A N/A
Training
6.6 Perform Trainings as required. SECTION 26 2300 All Location Attendance H R R,A N/A
log
Symboles, Abreviations :
Signature
Date
Symboles, Abreviations :
- Name plate and data are matching with the drawings and conform with
the project specifications
- Lose material (fuses, breakers, relays) ratings’ are matching with the
drawings and requirements
- Bolted connections for the bus bars are tightened to torque values
complying with the manufacturer recommendations
- Insulation resistance test on the bus bar had been performed ASU-QC-EL-LV SWGR-
QR-GEN-002
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date
Remarks
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date
Values Should Not Exceed The Maximum Value Mentioned In The Manufacturer Instructions.
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date
L1-L2 L1-L2
L1-L3 L1-L3
L2-L3 L2-L3
L1-E L1-E
L2-E L2-E
L3-E L3-E
1- TURNS RATIO TEST
Test Device Brand / Model: Calibration Date:
Name
Sign.
Date
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date
Panel Identification Panel location ASU Rep. Al Futtaim Rep. EXPO2020 Rep
Name Name Name
Sign. Sign. Sign.
Date Date Date
Third Party
Name
Sign.
Date
Remarks