100% found this document useful (1 vote)
171 views1 page

JPR5 1122

Jaipur Vidyut Vitran Nigam Limited has issued an order to relax the requirement for physical separation when providing separate connections for electric vehicle (EV) charging stations. This decision aims to promote the use of electric vehicles by allowing consumers to install EV charging stations without needing a separate physical connection, provided that the two connections are electrically separated and used appropriately. The initiative is part of the state's efforts to develop EV charging infrastructure and reduce carbon emissions.

Uploaded by

Shree73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
171 views1 page

JPR5 1122

Jaipur Vidyut Vitran Nigam Limited has issued an order to relax the requirement for physical separation when providing separate connections for electric vehicle (EV) charging stations. This decision aims to promote the use of electric vehicles by allowing consumers to install EV charging stations without needing a separate physical connection, provided that the two connections are electrically separated and used appropriately. The initiative is part of the state's efforts to develop EV charging infrastructure and reduce carbon emissions.

Uploaded by

Shree73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

JPR5-1122

JAIPUR VIDYUT VITRAN NIGAM LIMITED


(A Govt. of Rajasthan Undertaking)
OFFICE OF THE SUPERINTENDING ENGINEER (Comml.)
Regd.Office: Room No. 229, VidyutBhawan, Jyoti Nagar, Jaipur – 302005
Email – secomml@jvvnl.orgTel – 0141-2747041 FAX – 0141 – 2744803
CIN: U40109RJ2000SGC016486
No. JPD/SE(C)/XEN (OA)/F. /D. Dated

ORDER

Sub: Relaxation of the conditions of physical separation for connection


under EV category.

To reduce carbon emission, electric vehicles are the need of the hour. The State
Govt has made Jaipur Discom as State Nodal Agency for developing EV charging
infrastructure throughout the State. Presently installation of EV charging stations is at very
initial stage, the consumers installing EV charging stations in the premises for charging their
electric vehicles which already has an electric connection. Now since, the tariff for EV
charging stations is different from other categories; the consumers can only be benefitted if
they have a separate connection for EV charging stations.

It has been brought to our notice that field officers are insisting on physical
separation as per the provisions of TCOS, 2021 for giving separate connection of EV
charging stations.

To promote the electric vehicles, It is directed that a separate connection for EV


charging stations may be allowed in the premises where there is already another
connection without insisting for physical separation. It should be ensured that two
connections are electrically separated and EV Connection is used for EV charging only.

By Order

Signature Not Verified


Digitally signed by Prem Kumar Gupta
Designation : Superintending Engineer
Date: 2023.02.20 14:20:59 IST
Reason: Approved
RajKaj Ref No. : 3162796