0% found this document useful (0 votes)
140 views9 pages

Process Safety Review Checklist

The document outlines a comprehensive Process Safety Review (PSR) and Process Hazard Analysis (PHA) checklist for assessing safety and operability issues in proposed projects. It includes three phases: a preliminary review assessing project safety, a detailed analysis of piping and instrumentation diagrams, and a follow-up field inspection to ensure compliance with safety standards. Key considerations include chemical hazards, operating procedures, personnel training, and mechanical and electrical safety issues.

Uploaded by

Akhtar Quddus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views9 pages

Process Safety Review Checklist

The document outlines a comprehensive Process Safety Review (PSR) and Process Hazard Analysis (PHA) checklist for assessing safety and operability issues in proposed projects. It includes three phases: a preliminary review assessing project safety, a detailed analysis of piping and instrumentation diagrams, and a follow-up field inspection to ensure compliance with safety standards. Key considerations include chemical hazards, operating procedures, personnel training, and mechanical and electrical safety issues.

Uploaded by

Akhtar Quddus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Process Safety Review Checklist

The PSR & PHA (Process Hazard Analysis) identifies safety & operability issues &
concerns for a process. The following checklist will assist the Team in preparing for a
PSR and/or PHA.
PHASE I - Preliminary Review
This review assesses & makes safety & operability recommendations regarding the
proposed project. In addition, the Process Safety Review Committee (PSRC) will
provide a recommendation for conducting either a Phase II PSR or a PHA Study
(e.g. HAZOP). The Experimental Team may directly request a PHA study in place of
a Phase II PSR.
General Description:
· What is the process description & purpose of the unit?
· Provide a process sketch, which shows the major equipment & process lines.
· What is the life expectancy of this process unit?
General:
· Where is the unit to be located?
· Are the Chemical Hazards (quantities) consistent with limits set by the Building
Occupancy Classification? Is the operation a closed system or open
system? Are that & the operating pressure consistent with the requirements of
the Building Occupancy?
· Does separation & spacing between containers of hazardous materials meet the
requirements of the Building Code & NFPA 30?
· Would unit operation pose an undue hazard to neighboring units during normal
operation?
· Will equipment be located in high traffic areas?
· Is any part of the unit outside the building?
· What are the applicable codes & standards?
· Is there adequate access?
· What are the escape (egress) routes?
· What is the electrical classification of the area?
· Will this be a fully attended unit?
· Was the NFPA 704 rating, toxicity, chemical volume & pressure of all materials
considered in the attended/unattended designation?
· Number of operating personnel?
· Are there any radiation sources involved?
· Has this been discussed with the radiation Safety Officer?
· Are there any concerns about static electricity?
· What special safety requirements are unique to this process/unit?
Process:
· Have applicable aspects of Inherently Safer Design per ETP GP 48-04 been
reviewed?
· What chemicals do you plan to use as feeds?
· In what quantities?
· Material Safety Data Sheets (MSDS's) if available or equivalent information.
· How will you handle & where will you store your hazardous feeds?
· What path will you use to transport feeds to your unit?
· What personnel safety equipment will be required?
· Personnel training?
· What chemical products & by-products can you make, under normal & abnormal
conditions?
· In what quantities?
· What will your product inventory be?
· Is the process reaction classified as a hazardous chemical reaction?
· Do you consider this process hazardous? Why?
· What is the fire hazard of the materials involved based on NFPA 704M
"Recommended System for the Identification of the Fire Hazards of Materials" &
NFPA 49 "Hazardous Chemicals Data"?
· Are there any dangerous properties of the materials involved?
· At what maximum & minimum temperatures & pressures, both normal &
abnormal conditions, can you operate?
· Does this unit operate below ambient temperature & pressure?
· Will you operate under normal or abnormal conditions in the flammability region?
· In oxygen enriched atmosphere?
· Explosive situations?
· Are you mixing oxygen/air with flammables?
· Has this been discussed with a Process Safety Specialist?
· Will you be handling flammable or combustible liquids?
· What flash points?
· Lower explosive limits (LEL's)?
· Will an exothermic reaction be involved?
· Under abnormal conditions?
· Are there any unusual chemical or physical properties of the materials involved?
· Have all aspects of decommissioning & remediation of the unit at end of use
been considered?
· Will corrosion or erosion be a problem?
· Will process containment (gaseous or liquid spill) be required?
· Mechanical hazards such as moving parts, hot temperatures, etc.
· Will material compatibility be a problem?
· Ventilation requirements: General? Local/Spot? Purged areas? Hoods?
· What special construction techniques will be required for the unit: Process
equipment? Structure? Enclosure? Explosion cell?
Environmental:
· What will you do with your waste?
· EPA permit required?
· Have you discussed this with the HSE department?
· Solid waste involved?
· Where will you store your waste?
· What special protection or procedures will be required in handling the waste?
· Personnel training required?
· What do you plan to vent to the atmosphere?
· If so, how much per hour? per day?
· Will this need to be treated or scrubbed before release?
· Will you be handling toxic chemicals?
· If so, which ones and in what quantities and threshold limit values (TLV's)?
· What will be your handling procedures?
· Personnel safety equipment required? (Task Hazard Assessment done?)
· Personnel training?
· Has this been discussed with the site Industrial Hygienist or the Safety Staff?
PHASE II - Piping & Instrumentation Diagram Analysis
A detailed P&ID Analysis will be conducted during the Phase II review. Safety &
operability recommendations will be identified. If a PHA (HAZOP) is conducted, it will
serve as the Phase II PSR.
General:
· Review the Phase I Checklist & data
· Is a Design Review warranted to cover all aspects of construction?
· Does the drawing conform to Engineering Standard Specification?
· Are the correct drawing symbols used? If not, is a symbol legend included?
· Does the P&ID representation of the process reflect the actual process?
· Are the instrumentation & safety monitored circuits (SMC’s) shown correctly?
· Are there any obvious mechanical hazards?
· Do vessels indicate their size, material of construction, design pressure &
temperature?
· Are there any unique construction characteristics such as Autoclave, Hoke,
quartz, etc.?
· Have MR numbers been assigned to vessels & X numbers to relief devices?
· Do all the lines, which terminate themselves on the P&ID drawing, indicate
where they go with text?
· Do all the pumps show their capacity on the P&ID?
· Are the feed chemicals indicated on the P&ID?
· Are all the gas cylinders shown & indicated on the P&ID?
Process:
· Are there any obvious hazards involved in the chemistry being used?
· Does this process mix air/oxygen with flammables?
· Can air get in the system inadvertently?
· Is the system adequately pressure protected with relief valves, rupture disks,
manometer blowouts, etc.?
· Do the relief devices on vessels correspond to the design pressure?
· Do all relief devices have “X” numbers & indicate set pressure?
· Are there any valve arrangements or connections which could lead to a
hazardous situation?
· Can any section of the lines be dead-ended or blocked in?
Design:
· Is the design in compliance with Site Technical Practices (STPs)? Are there any
exceptions? Is there a system in place to ensure compliance such as design
review by qualified person(s)?
· Is there any one action of the operator which could lead to a hazardous or
unsafe condition?
· Are two likely actions?
· Are the appropriate utilities such as air, city water, nitrogen, or hydrogen double-
checked between the building & the unit?
· Are the process lines adequately checked?
· Are the piping/equipment materials adequate for this service?
· Is piping design & selection in accordance with STP ES54-01?
· Are the blowdown vessels adequately sized for the inventory they serve?
· Do all relief device vent lines that could contain liquids or solids go to blowdown
vessel(s)?
· Where do they vent to?
· Do they have a nitrogen purge?
· Are there high temperature switches (TIS’s) on all electric heaters except self-
limiting heaters (Autotrace)?
· Is the safety system separate & independent from the control system?
· Is the control system approved for installation?
· Is there any need for emergency electrical supply (generator or UPS)?
· Is the grounding system/method addressed adequately?
· Is all electrical equipment suitable for the area classification?
· Does the emergency shutdown system block the feeds & vent & purge the
system?
· What happens if the purge gas is unavailable?
· Would you know it?
· Does the system fail safe?
· What happens during utility failures including ventilation or power interruptions?
What happens when the utility returns?
· Do all the control valves & solenoids fail-safe?
· Are compressed gas feeds in accordance with STP ES54-03?
· Do all the hazardous gas feeds have surge checks?
· Are all the hazardous gas vents piped to a hazardous gas vent?
· Do all the hazardous gas regulator vents vent to a hazardous gas vent?
· Are there adequate indicators/recorders/controllers to indicate & control the
process at all times?
· Are there adequate alarms to indicate process problems?
· Do all hazardous feeds have block valves at the point of supply & at the point of
use?
· Is there any venting of hazardous gases?
· Is there any need for gas detection per STP ES66-05?
· Do they need to be treated or scrubbed?
· Are nitrogen purges/blankets provided for hot oil heaters?
· Is there sufficient valving & other isolation for LOTO during maintenance?
PHASE III - Phase II Follow-up and Field Inspection
During the Phase III Review the Operating Procedures are reviewed. Phase II
recommendations are reviewed. In addition, a review at the physical plant installation
is conducted to ensure that applicable codes & engineering standards are met.
· Review the Phase I & II review results to see if they have been incorporated into
the design.
· What are the major changes to the process or design since those reviews?
· Use the Phase II Checklist to review the changes to the P&ID.
· Are there written operating & emergency procedures?
· Is there a complete safeguard listing indicating the safeguards & their functions?
· Are there procedures for periodic testing of safeguards (e.g., Safety Monitoring
Controls, or SMCs) & documenting tests?
· Are there procedures for handling hazardous materials?
· Have your personnel been trained in handling the hazardous materials used in
the unit?
· Is there any specialized training required for the safe operation of this unit?
Operating Procedures
· Written operating procedures should be developed, implemented & maintained
for all process operations. These procedures must address:
o Steps for each operating phase
o Safe Design Limits (SDL) & Safe Operating Limits (SOL)
o Safety & health considerations
o Safety systems & their functions
o Exclusion zones during high risk activities
 Steps & THAs for each operating phase:
o Initial startup
o Normal operations
o Temporary operations
o Unattended operations
o Normal shutdown
o Emergency shutdown
o Startup after Emergency shutdown
o Extended or “mothballing” shutdowns
o Testing of operation Safeguards
 Operating Limits:
o Consequences of deviation from normal operating limits
o Steps required avoiding or correcting deviation
 Safety and Health Considerations
o Properties of, & hazards presented by, the chemicals used in the process
or equipment.
o Precautions necessary to prevent exposure, including engineering
controls, administrative controls & personal protective equipment.
o Precautions necessary to restrict or limit access to the general area of the
unit during high risk activities
o Control measures taken if physical contact or airborne exposure occurs.
o Control of hazardous chemical inventories.
o Special or unique hazards (radiation, hot surfaces, rotating equipment,
etc.).
o Maintenance procedures including lockout/tagout, Hot Work Permits,
opening process equipment or piping, confined space permits, etc.
o Emergency procedures
 Safety Systems & their Functions:
o Testing of operation safeguards.
o Safety systems, including a complete description, initiators, actions, time
delay, bypass & schedule showing the frequency of testing.
 Miscellaneous
o Procedures comply with the EH&S Manual.
o Procedures are located so as to be eaxily accessible.
o Unattended Operations Notification forms are posted.
 Training -- Applicable training should be conducted for all employees involved
in operating, maintaining & supervising a process. The Team is responsible to
ensure all personnel are adequately trained to perform the assigned duties of
their position. Training sign off is required.
o Process Technology
o Operating Procedures
o Process hazards
o Hazards of chemicals
o Safety requirements
o Emergency response
o Response to abnormal operations
o Process safety
o OSHA Personal Protective Equipment
o Task Hazard Assessment Certification Form completed?
o Standard Training Certification Form completed?
o Respirator training
o Records to document training
Walk-through Inspection:
· Is the unit congested such that it might be unsafe to work in or on?
· Will the congestion affect the ventilation?
· If in a hood, is the unit 6 inches inside the hood?
· Are hoods or spot ventilation systems been tested, balanced & certified?
· Any physical hazards such as “head knockers”, sharp points or edges, open
moving parts, exposed surfaces, etc.?
· Is there adequate guarding & warning signs for these hazards?
· Does unit sign contain contact information, names & phone numbers?
· Is anything located such that to operate it during the normal course of activities
would require an unsafe act?
· Are there adequate warning signs for hazards such as toxic materials, radiation
sources, etc.?
· Are there at least two escape (egress) paths from the unit?
· Is there any place in the unit where a person could become trapped in an
emergency?
Mechanical Issues
· Are there any vents, open pipes or tubing, or relief devices venting to the
atmosphere?
· What do they vent?
· Are there adequate block valves at the point of supply & at the points of use for
all hazardous feeds to ensure isolation?
· Are the hazardous feeds labeled?
· Are there block valves at other appropriate locations?
· Is all the piping secure?
· Is the process equipment adequately supported & anchored?
· Are required shields in place (both fixed & movable)?
· Are toxic gas cylinders in ventilated enclosures (where required) with warning
signs?
· Gas detectors provided?
· Procedures for regular calibration of the gas detectors?
· Are all gas cylinders properly secured?
· Are there nitrogen purge/blankets for hot oil heaters?
· Are the unit valves, equipment, and piping tagged & labeled & match the P&ID to
ensure safe operation?
Electrical Issues
· Was all electrical work done in a professional manner? Raceways (conduits)
adequately supported? Electrical boxes & wire ways covered? No loose wiring or
exposed wiring or terminals.
· Does the system have an emergency shutdown button?
· Emergency switches shall be at egress routes.
· Is an alarm and/or unit shutdown required if ventilation fails?
· Other indication of ventilation failure?
· Are initial inspections of electrical equipment in hazardous area completed &
documented per specification?
· If the unit is unattended, is the hood at full capacity all the time (at night)?
· Are electrical disconnects & power distribution enclosures labeled with power
source?
· If served by a circuit breaker, is the circuit breaker labeled as to service?
· Are circuit breaker schedules properly filled out in service panels?
· Is the equipment served labeled as to which circuit breaker is the disconnect?
· Is there proper working space about electrical equipment per codes?
· Are thermocouples & associated jack stations properly labeled with tags as
shown on the P&ID?
· Are the unit controls & safeguard devices on the unit clearly labeled to ensure
safe operation?
· Do all enclosures having voltages above 50 volts to ground have warning signs
indicating voltage level present?
· Do all power distribution panels have a sign indicating service voltage?
· Is the panel identified?
· Is the unit properly grounded? Are areas where static is a concerned properly
bonded?
· Are receptacles near a sink or other source of moisture ground fault interrupter
type?
· Are heaters fed from ground fault interrupting circuits?
· Do all heaters have a grounded metal covering?
· Do all heaters (except for autotrace) have high temperature protection per site
standards?
· When were critical instruments / monitors last calibrated / checked?
· Is there anything out of the ordinary that requires a warning sign to alert visitors
a hazard exists?
·