0% found this document useful (0 votes)
55 views1 page

M-P-192 1ST Basement Plan

The document outlines the plumbing layout for a first basement floor plan of an office building, including details on cold and hot water supply systems, drainage channels, and various room specifications. It includes a legend for abbreviations used, such as CWS for cold water supply and HWS for hot water supply. Additionally, it notes the implementation requirements for Advanced Metering Infrastructure (AMI) as per regulatory amendments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

M-P-192 1ST Basement Plan

The document outlines the plumbing layout for a first basement floor plan of an office building, including details on cold and hot water supply systems, drainage channels, and various room specifications. It includes a legend for abbreviations used, such as CWS for cold water supply and HWS for hot water supply. Additionally, it notes the implementation requirements for Advanced Metering Infrastructure (AMI) as per regulatory amendments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES:

LEGEND
- CWS MAIN
- HWS

CWS - COLD WATER SUPPLY

HWS - HOT WATER SUPPLY

F/A - FROM ABOVE

F/B - FROM BELOW

T/A - TO ABOVE

T/B - TO BELOW
1 2 3 4 5 6 7
9200 8650 8650 8650 8650 9200 EWH - ELECTRIC WATER HEATER

L/L - LOW LEVEL

H/L - HIGH LEVEL

LI - LITER
PAVEMENT - 4.900 FFL
- 5.175 SSL
WTP - WATER TRANSFER PUMP
E.T.S
TO 2ND BASEMENT BP - BOOSTER PUMP
- 4.900 FFL
- 4.900 FFL - 5.175 SSL
L/S - LITER PER SECOND
- 5.175 SSL FROM GROUND FLOOR
DRAIN CHANNEL Ø28 TO CHILLED
WATER SYSTEM

FROM 2ND BASEMENT BACK FLOW PREVENTOR


A - 5.075 FFL
IV E.T.S VALVE
- 5.175 SSL TO GROUND FLOOR CHAMBER NOTE FOR AMI PROVISIONING :
(2000x4000mm)
- 4.900 FFL Ø22 BIB TAP
PAVEMENT - 5.175 SSL ALL required provisioning for AMI shall be implemented as per
8650

Ø22 CWS & HWS B1


amendment to the Regulations titled :
W-08
Ø16 CWS & HWS [Amendment to the regulation for the Instalation of Electrical
TOILET FRESH AIR FRESH AIR
Ø22 CWS & HWS
B1
W-01 GUARD RM IV
SHAFT SHAFT ABOVE wiring to accommodate the Advanced Metering Infrastructure
IV
(AMI) components - Additional Field Requirements for AMI]
Ø22 CWS & HWS
PARKING
FHC IV IV Ø22 BIB TAP FHC B1 B1
W 06 W 07

B EWH-3
Ø22 BIB TAP - 4.900 FFL
- 5.175 SSL
Ø35 CWS H/L
Ø22 CWS H/L Ø28 CWS H/L
Ø35 CWS H/L B1 MV ROOM
W 05
0 17-08-2023 ISSUED FOR CONSTRUCTION

MV - PANEL
FRESH AIR RESERVED PARKING FOR
8650

SPEED HUMP AS PER SPEC. Removable Platform


SHAFT FUEL EFFICIENT VEHICLES
- 5.075 FFL - 4.875 FFL
(PARKINGS 1 TO 10) - 4.900 FFL DRIVEWAY
- 5.175 SSL - 5.175 SSL
FRESH AIR Ø35 CWS @ H/L B1
SHAFT ABOVE - 4.900 FFL W 04

- 5.175 SSL
Ø22 CWS & HWS
EWH-2 Ø35 CWS @ H/L Ø28 CWS @ H/L
IV
IV

C Ø16 CWS
IV

Ø35 CWS H/L


B1
W 03
- 4.875 FFL
Ø22 CWS & HWS M. CHANGING RM PARKING
EWH-2 TELEPHONE/ Space for TX TX ROOM
IV
OOREDOO ROOM
Ø22 CWS & HWS Ø28 CWS MDF ROOM

STORE-2
B1
8650

W 02
Ø22 CWS & HWS F. CHANGING RM - 4.900 FFL
- 4.900 FFL - 5.175 SSL
Ø16 CWS - 5.175 SSL Ø35 CWS @ H/L
- 5.075 FFL
L V ROOM
STAIR-2 Ø28 CWS @ H/L - 5.175 SSL
ELE.
RM UP Ø54 CWS F/A T/B
CC TV 30

LV - PANEL
29 31
UP Ø54 TRANSFER LINE - 4.875 FFL
DN
20 21 EQUIPMENT ROOM 28
27
32
33
19 22
LIFT 26 34
TO ROOF WATER TANK
D
18 23 25 35
17 24 CC TV CONTROL 17
35 25 LOBBY EWH-1 IV
24
23 18
34 26 IV
ROOM 22 19
33 27 IV 21 20
Ø22 CWS H/L 32
31
28
29
IV
UP
DN Ø42 CWS @ H/L
PARKING PARKING UP
30 JANI. Ø22 CWS & HWS
H.TOI.
- 5.075 FFL RM.
STAIR-1 Ø16 CWS
- 5.175 SSL
TRANSFORMER HATCH
Ø22 CWS & HWS FRESH AIR
PAVEMENT OPENING ABOVE (SIZE
-
8650

3000x3000) SHAFT ABOVE


- 4.900 FFL - 4.900 FFL
DRIVEWAY - 4.900 FFL - 5.175 SSL
1ST BAS
- 5.175 SSL GENERATOR
ROOM 4/M A --
1ST BASEMENT - 5.075 FFL
FRESH AIR SHAFT - 5.175 SSL
FWT 1 PARKING
OPENING ABOVE DRIVEWAY
90 m³ FIRE PUMP ROOM

E Ø22 BIB TAP


Ø40 TANK FILLING LINE
FROM MUNICIPAL
SUPPLY(H/L)
BATTERY ROOM
- 5.075 FFL - 4.900 FFL (photovoltaic system)
- 5.175 SSL DIESEL DIESEL
WHEEL STOPER - 5.175 SSL
- 4.900 FFL ROOM TANK
F W T 2 90 m³ - 5.175 SSL

Ø22 CWS H/L


8650

EXTRACT AIR
SHAFT ABOVE

PARKING WHEEL STOPER

FADEL FOUANI --
F FHC FHC
3226 --
Ø54 WATER SUPPLY PIPE F/A
WATER METER CABINET CORNER GUARD TYPICAL FOR ALL
COLUMN AND ALL WALL EDGE
8050

DRIVEWAY
DN
UP

- 5.075 FFL
31
32
33
34
35
16
17
18
19
20

- 5.175 SSL
STAIR-3
UP
30
29
28
27
26
25
24
23
22
21

Ø22 BIB TAP


-8.575 FFL
- 4.900 FFL
G Ø40 WATER SUPPLY PIPE F/A
- 5.175 SSL

WATER METER CABINET EXTRACT AIR Commercial License: 13160 Exp: 12/12/2023 l MME / EEOACC: 4/M Exp: 13/01/2025
SHAFT
STORE-1
RAIN
WATER TANK - 4.900 FF
Ø32mm PIPE FROM WATERMETER
206 m³
28.2 m³
(GROUND FLOOR) (MUNICIPAL
SUPPLY)
(2B+G+M+3 TYP FLRS) OFFICE BUILDING
-8.575 FFL
-8.575 FFL

IRRIGATION
EXTRACT AIR
SHAFT ABOVE
(ECQ-B04, PIN:69040300)
WATER TANK
EXTRACT AIR EXTRACT AIR
SHAFT SHAFT ABOVE ENERGY CITY - QATAR

QATAR ENDOWMENT AUTHORITY

AUG.2023 18-505

FIRST BASEMENT FLOOR PLAN


PLUMBING LAYOUT

M-P-192 IFC 1:200

Rajeeb

Date Print 20.August.2023

You might also like