0% found this document useful (0 votes)
36 views2 pages

Getachew 70 Labour Cost

The document outlines the labor costs for the construction of a G+3 building in Mekelle, detailing various structural and additional works with associated quantities and rates. The total cost for the main construction work is 296,265.00, with additional works including plastering, block work, gypsum work, painting, ceramic work, electrical installation, and sanitary installation. The agreement is made with the client, Ato Getachew Kefei.

Uploaded by

Fikre
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

Getachew 70 Labour Cost

The document outlines the labor costs for the construction of a G+3 building in Mekelle, detailing various structural and additional works with associated quantities and rates. The total cost for the main construction work is 296,265.00, with additional works including plastering, block work, gypsum work, painting, ceramic work, electrical installation, and sanitary installation. The agreement is made with the client, Ato Getachew Kefei.

Uploaded by

Fikre
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project: G+3 Builiding Document title : - LABOUR-COST

Location: Mekelle 70 karea AGREEMENT


client: Ato Getachew Kefei
G+3 Builiding
Item No DESCRIPTION Unit QTY Rate Amount
A, STRUCTURE- Work
1.10 Closing of Open Down , work includes
chiseling of concrete, rebar work ,concrete
work and form work PCS 1 10,000.00 10,000.00
1.20
Column , work includes , rebar work
,concrete work and form work PCS 5 3,500.00 17,500.00
1.30
re-work of Column, work includes
demolition of existing column, rebar
work, concrete work and form work
PCS 1 5,000.00 5,000.00
1.40 3rd Floor slab work , work includes ,
rebar work, concrete work ,play-wood
form work and electrical Condit
installation (area of the slab is 65 m2) m2 65 1,700.00 110,500.00
1.50
stair case cover slab work , work includes
, rebar work, concrete work ,play-wood
form work and electrical Condit
installation (area of the slab is 25 m2)
m2 25 1,700.00 42,500.00
1.60 2rd Floor stair case , work includes ,
rebar work, concrete work ,play-wood
form work and electrical Condit
installation PCS 1 15,000.00 15,000.00
1.70 Top-tie beam , work includes , rebar
work, concrete work ,play-wood form
work ml 17.5 750.00 13,125.00
1.80
Demolishing, work 20cm thick HCB
structure
m2 81 65.00 5,265.00

Demolishing, exexting concrter work


around stair case
m3 4.5 2,500.00 11,250.00
1.90

sum 230,140.00
B, Construct water tank with the detail
specification given below
2.10 1.Excavation & Earth work (3*3*2.75) m3 25 465.00 11,625.00
2.20 2.HCB Masonry Works PCS 1 5,000.00 5,000.00
2.30 3.Concrete Work PCS 1 15,000.00 15,000.00
2.40 4.Steel reinforcement PCS 1 5,000.00 5,000.00
2.50 5.form work PCS 1 15,000.00 15,000.00
2.60 6. cart away surplus materials m3 36 400.00 14,500.00
sum 66,125.00

Total Carried to summary (A+B) 296,265.00

Additional Works
Quantity to
Item No DESCRIPTION Unit be unit price Amount
calculated

3.1 Plastering
Two Coats plastering in cement sand
mortar of ratio 1:3 to internal and
external HCB wall m2 150
3.2 BLOCK WORK
Class B 150mm thick HCB wall both external
surfaces left for plastering bedded in cement
mortar (1.3). Price includes mortar bed. m2 120
3.3 Gypsum WORK
a) Gypsum plastering m2 60
b) Gypsum bord m2 600
c) Frame ml 350
3.4 PAINTING
A) apply three coats of approved quality
plastic paint.Price shall include pre-
cleaning and preparation of surfaces. m2 70
B) apply two coats of approved quality
Quartz paint.Price shall include pre-
cleaning and preparation of surfaces. m2 90
3.5 Ceramic work
a) ceramic wall tile bedded to walls m2 180
b) ceramic for floor tile m2 150
c) Window sill ml 250
d) Stair Riser and Tread instalation . ml 250
3.6 ELECTRICAL INSTALLATION WORKS PCS 1 35,000.00
3.7 SANITARY INSTALLATION PCS 1 25,000.00

You might also like