SYSTEM STATUS REPORT OF 400/220 KV JAULJIVI GIS
DATE 02.03.25
TIME 11.00 A.M
BUS VOLTAGE
BUS VRY VYB VBR
400KV BUS 1 409.28 407.88 405.71
400KV BUS 2 409.61 409.61 405.91
220KV BUS 1 223.82 223.94 221.72
220KV BUS 2 223.57 222.01 221.87
220KV BUS 3 223.51 222.11 221.54
220KV BUS 4 223.89 222.13 221.79
POWER FLOW IN TRANSMISSION LINES
400KV BAREILLY 220KV PITHORAGARH
400KV BAREILLY CKT-1 CKT-2 CKT-1 220 KV PITHOR CKT-2 220KV DHAULI CKT-1 220KV DHAULI CKT-2
-29.96 -29.21 29.21 30.27 -1.95 -5.04
BATTERY BANK VOLTAGE
POSITIVE TO NEGATIVE TO
BATTERY BANK EARTH EARTH TOTAL
220 KV BATTERY BANK-1 121.45 116.27 237.17
220KV BATTERY BANK-2 123.45 112.17 237.43
48V BATTERY BANK-1 0.49 51.46 52.37
48 V BATTERY BANK 2 0.54 51.26 53.08
LOAD ON ICT
400/220 KV 315 MVA ICT-1 400/220 KV 315 MVA ICT-2
37.88 26.18
OTI/WTI READING
WTI
ICT/REACTOR DETAIL OTI HV IV LV
400/220 105 MVA ICT1-R PHASE 30 27 28 28
400/220 105 MVA ICT1-Y PHASE 28 30 31 35
400/220 105 MVA ICT1-B PHASE 27 31 33 37
400/220 105 MVA ICT2-R PHASE 28 32 35 34
400/220 105 MVA ICT2-Y PHASE 32 31 30 30
400/220 105 MVA ICT2-B PHASE 22 24 25 25
400/220 105 MVA SPARE ICT 28 26 29 30
400KV 21 MVAR REACTOR-1 R PHASE 40 48
400KV 21 MVAR REACTOR-1 Y PHASE
400KV 21 MVAR REACTOR-1 B PHASE 44 54
400KV 21 MVAR REACTOR-2 R PHASE 44 50
400KV 21 MVAR REACTOR-2 Y PHASE 46 54
400KV 21 MVAR REACTOR-2 B PHASE 42 50
400KV 21 MVAR REACTOR-SPARE 44 50
STATUS OF RTU DATA
BTAMC NTAMC NRLDC
GATEWAY-1 GATEWAY-2 GATEWAY-1 GATEWAY-2 GATEWAY-1 GATEWAY-2
OK OK OK OK OK OK
STATUS OF AHU
400KV GIS OK
220KV GIS OK
STATUS OF DGA OF ICT
ICT-1 R PHASE ICT-1 Y PHASE ICT-1 B PHASE ICT-2 R PHASE ICT-2 Y PHASE ICT-2 B PHASE SPARE ICT
C2H2 0 0 0 0 2.82 0.00 0
C2H4 5.73 0 0.00 0.00 12.11 0.00 0
C2H6 0.00 0 0.00 0.00 0.00 0.00 0
CO2 822.61 899.15 1846.16 1268.07 1601.54 663.81 360.21
CO 389.56 403.13 0 443.97 656.3 0 0
H2O 0.99 1.01 1.01 1.87 1.00 1.00 2.01
H2 0.00 0.0 0.00 0.00 0.00 0.00 0
TDGC 395.29 403.13 0 443.97 671.23 0 0
O2 3163.39 2550.07 0 3922.26 4129.58 2170.34 3725.51
CH4 0.00 0 0.00 0.00 0.00 0.00 0
STATUS OF DGA OF REACTOR
LR-1 R PHASE LR-1 Y PHASE LR-1 B PHASE LR-2 R PHASE LR-2 Y PHASE LR-2 B PHASE SPARE LR
C2H2 0.00 0.00 0.00
C2H4 0 0.00 0.00
C2H6 0.00 0.00 0.00
CO2 582.38 1904.90 1171.19
CO 0 648.84 549.62
H2O 3.85 7.03 5.31 3.12 1.97 2.38
H2 0.00 0.00 0.00
TDGC 0 648.84 549.62
O2 743.4 3386.52 3413.41
CH4 0.00 0.00 0
MISCELLANEOUS STATUS
PARTICULAR OK NOT OK REMARK
STATUS OF 400KV SWITCHYARD
ILLUMINATION OK
STATUS OF 220KV SWITCHYARD
ILLUMINATION OK
STATUS OF 400KV GIS SWITCHYARD
ILLUMINATION OK
STATUS OF 220KV GIS SWITCHYARD
ILLUMINATION OK
WATER IN FIRE FIGHTING RESERVOIR-1 4.0M
WATER IN FIRE FIGHTING RESERVOIR-2 4.0M
DG SET RUNNING STATUS NOT RUNNING
OUTAGE DETAIL IF ANY NO
ANY CRITICAL ALARM IN SYSTEM NO
ANY ABNORMALITY NOTICED IN
400KV GIS NO
ANY ABNORMALITY NOTICED IN
220KV GIS NO
AUXILIARY SUPPLY STATUS OK
TERTIARY SUPPLY STATUS OK
FIREFIGHTING SYSTEM STATUS OK
NAME OF SHIFT INCHARGE - GAURAV LUNTHI
DESIGNATION OF SHIFT INCHARGRE - JE (O&M)
SIGNATURE OF SHIFT INCHARGE -
SHIFT-A