Relaxo New Site Configaration
Relaxo New Site Configaration
Maintain transportation planning point SPRO ⇒ Enterprise Structure ⇒ Definition ⇒ Logistics Exe
Assign sales organization - distribution channel - pl SPRO ⇒ Enterprise Structure ⇒ Assignment ⇒ Sales and D
Remarks
W_T024W_ASSIGN
Purchasing group
PGR PGR Description
BM1 BRN material purchase Group
BS1 BRN service purchase Group
COM common purchase group
GM1 GKP material purchase group
GS1 GKP Service purchase group
HM1 HQ Material purchase group
HS1 HQ service purchase group
SM1 SIN material purchase group
SS1 SIN service purchase group Plant
TRD Trading Purchase Group U102
Condition Control
Short Description
Adjust for quantity variance
Free
Changed manually
Fixed
Condition value and basis fixed
Condition value fixed (billed items)
Condition basis fixed
Condition value fixed (cost price)
Scale Base Value and Condition Amount Fixed (for BYD only)
Condition Type
Name
Taxes on the PO
P&F Chrg % after GST
P&F Value after GST
Freight % after GST
Freight Value af GST
Freight Qty aftr GST
Freight Bf GST Value
Freight bf GST Qty
Insurnce Chrg Value
Insurnce % AF GST
Insurnce Qty AF GST
Insurnce Valu BF GST
Insurnce % BF GST
Insurnce Qty BF GST
Inland Trnst Insurce
Load/Unloading Value
Misc.Value With GST
Other Charges
Base Price Auto
Base Price Manual
P&F Chrg % bef GST
P&F Chrg Val bef GST
P&F Chrg Qty bef GST
Discount % on Gross
Discount Fixed Value
Discount Per Qty
Strg Cum erctn insur
Weight machine charg
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
HURL Issues Raise At User End
While Creating PO Frieght charge not Trigger
While Creating PO GST, Texes Not charge not Trigger
Not able to Release the PO from finance Side
can we Delete the PO OR PR Number after creation
Material 9000024501 Not Maintain by Accounting Departments
We have Created PR & PR has been Released after that I want to chamnge the PR Values after UnReleased That PR but Not able to change the PR values
As mutually discussed with C&M GKP & Finance HO regarding SAP 11 Digit String is acceptable whereas the 4 digit after Decimal is not required. Kindly
change it from 04 Decimal to 02 Decimal (as confirmed by MCO Japan, JPY is 0 decimal currency hence not requiring any decimal value in JPY).
how can we check the change Account history against vendor code
City & street wrong Update against plant code 1563 & 1564
Issue in Processing Service Enrty Sheet while doing MIRO
Maintain Material Code in Plant HR01
how to extend the Material in Material Master
how to activate Material ledger
open & active the period for next month
URGENT//UNABLE TO DE-RELEASE THE PO -5000000613
Business place was not Dertermine or Assign with Plant
Not able to update Per. unit price in material master
Error during MIGO , valuation Record M7400000005 u103 CONT does Not Exits
not able to change in UOM in material master
Customization incorrectly maitain
PDIL has issued an amendment against SAP PO no. 6000000513 (attached herewith), in this amendment PDIL have reduced the amount and Qty of a few items. We
are not able to amend these reduced Qty/Amount in SAP PO. Therefore, we are not able to enter the invoices which are to be processed against this PO. May
please advise/take necessary action for amending the SAP PO as per attached LOI amendment. The invoices are to be processed before 30th September otherwise
there will be loss of 95Lacs against GST.
acct. 1070071 for trans./event key bsx, postable directly message no. m7109- 3229 (reservation number)
acct. 1070071 for trans./event key bsx, postable directly message no. m7109 - 9000000439 (PO Number)
Not able to De-reales the PO - 6000000949 , Docoments has already been outputed funtion not posible
Error while while performing SES in sap (same activity number 4000000012 have 2 line service number)
While performing of SES system is picking up PR price instead of PO price(PO done with PR reference after a month we make price changes in PO & then while
doing service entry sheet gross price are picking priviously- 6000001633
While creating SES , PO price & service price are different in PO No-6000001379
While creating SES , PO price & service price are different in PO No-6000001589
Valuation record M7610030001 U102 EXTR does not exist in PO No- 5000001079 have multiple line item
While Performing of SES in PO No- 6000001186 in 2nd line item not trigger price from PO there price showing
error is Interval does not exist for object LEISTUNG ACNR Message no. NR751
Rake Desposal Report in excel master sheet of 2600 MT Against 96 STO/PO
Migo Reversal against Docomets number -1000059346 & 1000059348
unable to change G/L Account , purchase order has been created but still not Released & have not any forther Process
Valuation data for the material Mxxxxxxxx , valuation type EXTR does not exists
Valuation data for the material Mxxxxxxxx , valuation type EXTR does not exists
Material Purchase Requisition Total value not updated to zero when item flagged for deletion.
How to attached the note while doing Migo (Receipts Docoments Attached while performing MIGO )
How to attached the note while doing SES (Service Entry sheet Docoments Attached while performing SES )
Supplier 1001287 has not been Created for Purchasing organization 1005
Material Group Maintain in material master for Trading Product for all sales office
Valuation class Maintain in material master for Trading Product for all sales office
Account assigments category Maintain in material master for Trading Product for all sales office
Material discription Maintain in material master for Trading Product for all sales office
How can we change the valuation class for the Material if there has been goods Receipts Done against PO - 4000 Qty & still billing process not Done
How can we change the valuation class for the Material if there has been goods Receipts Done against PO - 4000 Qty & billing process Done for 2050 Qty there is
1950 stock pending
how to move stock from scheduled for delivery to unrestricted
Status "Blocked for procment/whse" of material APPW000001 does not allow external procurement
Material Transfer Posting from One Location to Another Location throught use of Transfer posting (when Migo has been done in wrong Storage Location )
R09 Material Remove from the storage location & move the Stock from Plant Label
Material Place in Storage Location from Plant code Location with the Reefernce of Material Docoments
Actual GI Date Not Reflecting in Rake Desposal Report against the STO - 8000011762, OBD No - 8600020253
Layout change in PR , Total value & Net value Are not Reflecting in PR Screen.
OBD not Generating against the STO
Save shipments, Action for shipments end ,Posting Goods issues for delivery In shipments , account Determination for entry h000 AUM not Possible
MIGO canclation 1366 in Material 9000024501 (Dinesh chowdhari)
In PR No- 1000001610 two value are Reflecting in two currency INR & EUR
Batch Felids Validation in ME21N & docoments Type ZSTO Unable feids Done!!
Deleted Service Line Item 10.20 & 10.50 is showing in the SAP PO 6000001514 in the print
Service Line Item Has been Deleted & save . Is that possiable to Un-Delete that service Line item
Batch 9000014501 5000 0212 SU0123HDPE does not exists
How to extend validity Period in Purchase order
How to change service short Text & unit of Measure (UOM ) in service master
Service Line Item Has been Deleted & save. But while performing Service PO Print that Deleted Item Reflecting in Print
How to check & find the SRV List (Reservation List inventory Management)
Service Code UOM change in service Master
update the Long Text Description In Material Master
where we can update house bank & bank account along with bank Key & bank name
What is the T-code to find List of material From material master
What is the T-code to find list of purchase order
Where we can find the service PR Total values
what is the Table name to find purchase order List
Goods receipt not possible for outbound delivery 8700001487 error code 8
Goods receipt not possible for outbound delivery 8700001487 error code 4
Valuation record S0301010001 U102 EXTR does not exist in PO No- 9000000543 have issues in line item 20
As customer, can we create one Vendor Code with have Multiple Branches having with Multiple Address . In the vendor master, only a single
address can be maintained for a vendor code. Is there an option to maintain multiple addresses for a vendor code? The user should have the
facility to select a particular address out of the many addresses, at the time of entering the PO
Error saving valuation data for material M7002900062 U101 , Message no. M8829, Error occurred when the system tried to save the valuation
data. Contact your system administrator. 5000001414. Need to be Resolved by Debaging at table .
No goods receipt possible for purchase order 5000001679, Message no. M7036, Make sure your entries are correct.
Enter Valuation Type Error While Performing MIGO against PO 9000000687 in Material M7401080005, M7400000005
How to Creat Service PR
Goods receipt not possible for outbound delivery 8700001487 error code 8
Define a cost element category for account 4020122 (controlling area H000)
Account determination for entry H000 GBB H001 VBR 5011 not possible
Account determination for entry H000 GBB H001 VNG 5520 not possible
No direct postings possible to G/L account 4000055, Message no. M7059, Diagnosis, No direct postings can be made to the G/L account (because
it is a reconciliation account).System Response, The system cannot post the amount to this account.The system cannot post the amount to this
account. Procedure.If the system has determined the G/L account, the system setting is faulty. Contact your systems administrator.If you have
entered the G/L account manually, enter a different account or cancel the account entered, so that the system determines an account
automatically.
What is the use of movements type 551 (How to scrap the stock which is available in MMBE overview.
While performing Print of PO PDF Fright charges are not fetching in That Print OUT
How to Reverse OBD Number in SAP
In PO where We can find which Tab we can find the GST number
In Trading Product PO what is procedure for Goods Receipts what we will have to perform for the same
Updatetion of control Code/HSN code in Material Master for the Material of FACTAMMSUL
Creation of Service PO
Picked quantity is larger than the quantity to be delivered Message no. VL019
Frieght value are incorrectlly picking while performing print out of PO
Remove of K Account Assignment mandatory for SAP Item codes in Material Type ZNSPNon-Valuated Spare HURL & ZPSEPersonal Use Items
Vendor code 1000736 not extened for purchase organization 1003, it is only extened for purchase organization 1001
Account assignment mandatory for material 702 (enter acc. ass. cat.)
Error While Performing Limit PO Print. ‘’Fleld T/D Does not exist in form’’
What is the Transection code to find the List of sap user with Address
Customer data Address not reflecting in PO print priview at Header label (at Top of the Page)
Valuation record M8205010008 U101 EXTR does not exist in PO No- 9000000761Line item no 7.
Enter Batch Message no. M7018 Diagnosis You have not entered a value in field "Batch" although an entry in this field is mandatory. System
Response The system cannot continue processing. Procedure Enter a value in field "Batch" or press F4 (possible entries). Note: If the storage
location or batch is missing it may be possible to enter * in the field and branch into the storage location/ batch selection list. You can find out
whether this function is defined for this field via the F1 help.
Check table T159L: entry 1727 does not exist, Message no. M7001
Material 9000014501 does not exists for storage location S001
Creation of asset PR
Creation of asset PO
where we can check price change history in Material master , what was the old price & new price too in sap mm ( Material Price change hsitory)
is that possible to change mateial type in material master once material has been created
ERROR WHEN REDUCE QUANTITY FOR ONE LINE ITEM 2150 FROM 98 TO 74 - in asset Purchase order
8100114013 subsequence function picking from Delivary not possible due to credit block
What is the T-code to find the list of Reservation Created throught MB21.
Account determination for entry H000 PRD H001 ___ 6011 not possible Message no. M8147 Diagnosis The system did not find an account for this
transaction. This means that the account determination for key H000 PRD H001 ___ 6011 is not maintained in MM Customizing (Valuation). The key is made
up of: •Chart of account •Transaction key (= Posting transaction) •Valuation grouping code •Account grouping code •Valuation class System Response The
system cannot update a G/L account for this transaction. You cannot post the transaction. Procedure Contact your system administrator. If you have the
authorization, check the Account determination in Customizing for Valuation. Proceed Note The relevant posting transaction can be found in Table T030A.
Valuation Record M9796010005 U101 EXTR does Not exists against the purchase order- 5000002112
Valuation Record M6101350019 U101 EXTR does Not exists against the purchase order- 5000001830
Valuation Record M7200080006 U101 EXTR does Not exists against the purchase order- 5000001899
Valuation Record M7400000004 U101 CONT does Not exists against the purchase order- 5000001900
Valuation Record M9103510001 U103 EXTR does Not exists against the purchase order- 9000000860
Release Stratgry Tab not Appearing in service PO :- 60000002021 against the PR Number :- 3000001111
Supplier 1600261 has not been Created for Purchasing organization 1003
8100114013 subsequence function picking from Delivary not possible due to credit block
Creation of shipments cost & shipments
By mistake I have checked the free item check box in the PO, I have done goods receipt for this PO. Now I want to remove this check box in the PO and post
the invoice. Please help me.
Creation of Asset service PO
RC Number - 4600000108 has been already created with one line item after that we want to adopt from PR & add on line another line item in same RC.
close
29.08.2023
close 30.08.2023
close 31.08.2023
close 01.09.2023
close 04.09.2023
close 05.09.2023
close 06.09.2023
close 07.09.2023
close 10.09.2023
close 11.09.2023
close 10.09.2023
close 10.09.2023
close 10.09.2023
close 10.09.2023
close 19.09.2023
close 20.09.2023
close 22.09.2023
close 22.09.2023
cloes 22.09.2023
close 22.09.2023
close 22.09.2023
close 28.09.2023
close 28.09.2023
close 28.09.2023
close 28.09.2023
close 30.09.2023
close 03.09.2023
close 03.09.2023
close 10.10.2023
close 11.10.2023
close 11.10.2023
close 11.10.2023
close 12.10.2023
close 12.10.2023
close 14.10.2023
close 14.10.2023
close 18.10.2023
close 19.10.2023
close 19.10.2023
close 19.10.2023
close 19.10.2023
close 21.10.2023
close 25.10.2023
close 27.10.2023
close 23.10.2023
close 01.11.2023
close 01.11.2023
close 07.11.2023
close 08.11.2023
close 13.11.2023
close 14.11.2023
close 15.11.2023
close 16.11.2023
close 22.11.2023
close 17.11.2023
close 17.11.2023
close 22.11.2023
close 21.11.2023
close 23.11.2023
close 23.11.2023
close 23.11.2023
close 24.10.2023
close 24.11.2023
close 26.11.2023
close 26.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 29.11.2023
close 30.11.2023
close 30.11.2023
close 30.11.2023
close 30.11.2023
close 30.11.2023
close 01.12.2023
close 01.12.2023
close 03.12.2023
close 04.12.2023
close 04.12.2023
close 04.12.2023
close 05.12.2023
close 05.12.2023
close 06.12.2023
close 06.12.2023
close 06.12.2023
close 06.12.2023
close 06.12.2023
close 07.12.2023
close 07.12.2023
close 07.12.2023
close 08.12.2023
cloes 08.12.2023
open 08.12.2023
close 08.12.2023
close 08.12.2023
close 12.12.2023
close 12.12.2023
close 13.12.2023
close 13.12.2023
close 13.12.2023
closed 15.12.2023
closed 18.12.2023
closed 18.12.2023
closed 18.12.2023
closed 19.12.2023
closed 19.12.2023
closed 19.12.2023
close 20.12.2023
close 20.12.2023
close 21.12.2023
close 21.12.2023
close 22.12.2023
close 22.12.2023
close 22.12.2023
close 23.12.2023
close 26.12.2023
Close 28.12.2023
cloes 28.12.2023
close 29.12.2023
close 28.12.2023
close 29.12.2023
close 29.12.2023
close 29.12.2023
close 29.12.2023
close 20.12.2023
close 31.12.2023
close 01.01.2024
close 02.01.2024
close 02.01.2024
close 02.01.2024
close 02.01.2024
close 03.01.2024
close 03.01.2024
close 03.01.2024
close 03.01.2024
close 04.01.2024
close 04.01.2024
close 04.01.2024
close 04.01.2024
close 04.01.2024
close 05.01.2024
close 05.01.2024
close 05.01.2024
close 05.01.2024
close 08.01.2024
close 08.01.2024
close 08.01.2024
close 08.01.2024
close 09.01.2024
close 09.01.2024
close 09.01.2024
close 10.01.2024
close 10.01.2024
close 10.01.2024
close 12.01.2024
close 15.01.2024
close 17.01.2024
close 18.01.2024
close 18.01.2024
close 19.01.2024
close 19.01.2024
close 19.01.2024
close 23.01.2024
close 23.01.2024
close 23.01.2024
close 23.01.2023
close 24.01.2023
close 24.01.2024
close 29.01.2024
close 29.01.2024
CLOSE 01.02.2024
close 02.02.2024
close 02.02.2024
close 02.02.2024
close 09.02.2024
close 09.02.2024
close 09.02.2024
close 09.02.2024
close 09.02.2024
close 09.02.2024
close 09.02.2024
close 12.02.2024
close 12.02.2024
close 14.02.2024
close 14.02.2024
close 15.02.2024
CLOSE 15.02.2024
close 16.02.2024
close 16.02.2024
close 16.02.2024
close 11.03.2024
close 12.03.2024
close 13.03.2024
close 17.03.2024
close 19.03.2024
close 29.03.2024
close 29.03.2024
close 31.03.2024
close 31.03.2024
close 31.03.2024
close 09.04.2024
close 09.04.2024
close 09.04.2024
close 09.04.2024
close 15.04.2024
close 15.04.2024
close 16.04.2024
16.04.2024
16.04.2024
16.04.2024
close 23.04.2024
close 24.04.2024
close 01.05.2024
close 01.05.2024
close 07.05.2024
close 08.05.2024
close 09.05.2024
close 09.05.2024
close 09.05.2024
close 09.05.2024
close 09.05.2024
close 09.05.2024
close 09.05.2024
CLOSE 15.05.2024
CLOSE 15.05.2024
close 21.05.2024
close 22.05.2024
CLOSE 22.05.2024
CLOSE 22.05.2024
close 24.05.2024
close 31.05.2024
close 31.05.2024
close 10.06.2024
close 10.06.2024
close 10.06.2024
close 13.06.2024
CLOSE 13.06.2024
CLOSE 13.06.2024
CLOSE 14.06.2024
close 18.06.2024
close 19.06.2024
close 19.06.2024
CLOSE 19.06.2024
close 20.06.2024
close 20.06.2024
close 25.06.2024
close 27.06.2024
close 28.06.2024
close 28.06.2024
close 04.06.2024
close 04.06.2024
close 04.06.2024
CLOSE 04.06.2024
close 08.06.2024
CLOSE 09.06.2024
close 12.07.2024
CLOSE 18.07.2024
CLOSE
CLOSE
CLOSE
Solution
In pricing procedure , in condition Table that matrial was Assign in condition Table
need to Assign materil in pricing procedure to define it for that material
SU53 Authorization was not for the RUN the program from basis side
We can delete in PO the Service Number & Line item through T-code ME22N But We can Delete PO or PR number
Need to extend the Material through T-code MMO1 Which was Not Extended with the new Plant with Existing Plant
PO already Created Against the PR That’s why we are not able to change the PR Values
Before you continue, please read the following text carefully. If you do not heed this note, you can cause
irreparable damage to the system with this transaction. In the R/3 System tables currency fields are stored as decimal figures with a variable number of decimal place
point is not stored in the field in the database. Instead, each currency field refers to a currency key field. In this transaction you assign the number of decimal places to
uniquely. Example: If you have set currency USD to have two decimal places and you post an amount of 100
USD, an amount of 10000 USD is stored in the currency field in the database. Not until this amount is processed further or is output does the system use the currency
reference field to determine the number of decimal places via this table. In this way the table content can be interpreted correctly for further processing or formatted
the correct punctuation.
If after posting you changed the number of decimal places for USD, for example, to 3, the existing field content of 10000 would be
Postal code was wrong updated during creating plant code 1216 & save it so postal code will change use of t-code OX10
Under Procesing
in that file some colomn has been hided that why this error was coming so before uploading the file need to check & unhide the Colomn
go to the MM02 pest the material which need to change of UOM , go to the purchasing view -- click on additional data --- choos the unit of mesure & delete any alternate uni
unit of mesure
Invoices created on 3 month ago & all finance activities has been done & period has been closed that why we are not able do the pending Qty GR
go to the BP transection Inter the vendor code then inter , next screan will apear double click on that vendor code & select the vendor Row & go to the change history & we w
Postal code was wrong updated during creating plant code 15663 & 1564 & save it so city & street will change use of t-code OX10
go to ckmstart & active the material ledger against plant code HR01 & then extend the material through MM01
go to MM01 , enter the material which material u want to extend from one plant to another plant
enter T-code MMPV fill it required filled & excute , go to MMRV & enter the Company code- H001, check the priviouse open period & current period (need to do in pro
Go through with The T-code SU53 & took the Authorization of it after that we can de-Released that PO
go through t-code sm30 & assign business place with company code & use table name J_1BT001WV click on edite & change
go through the t-code MR21 & enter the Requied fields & display it & change it , in that we can change valuation type & Price
Go to the T-code ML81N , enter the other purchase order & enter the service entry number & enter & then click on display & change buttom & then click on revok & af
buttom.
go to the the t-code CKMSTART & enter the Plants tick on imiditate & untick on the testing & back & excute so production servers will activate
go to MM01 , enter the material which material u want to extend from one plant to another plant
Go to the T-code ML81N , enter the other purchase order & enter the service entry number & enter & then click on display & change buttom & then click on revok & af
buttom.
in that material PO need delete that line item & then do the migo after that undelete that PO item & then again do the migo
System is not allowing to change the UOM , becouse there is some stock available against that material so stock must be Zero & then we can UOM through tcode MM02
there Is some sequence which we need to debug & delete some msg & sequence too
go to mm02 & update the Accoount determination for APPW00001 & APPW00005 in sales organization 2 & update account assigment group material
we can not UOM of any Material if there is a stock available in inventory along with open period & close period stock shoud not be available
the techanical fields discription fetch from material while creating PO so can not make change that discription only we can change aprovels
GO TO AC02 , click on other services & pest the activity number & then enter after that click on change & display buttom & change the uom .
go to T-code FS00 & select the GL find the GL account & click on change button go to the create bank intrest tab & click on post automatically only.
GL account against the Reservation No -3229 , G/L- 4060040 , valuation class or material group - 6010 which is incorrect. Kindly correct your GL account against the v
class.Valuation class - 6010 , G/L- 1070071 is correct
need to maintain Account assigments category which was not maintain for the cost centre K & do the the Migo.
need to go throught the output configaration Delete the Existing output in me9f & excute new output
Due to same activity number have 2 line item system will consumed first line item & then second line item.
Go to the MM01 & enter the material which we want to extend in EXTR , Select the accounting View 1 & enter the Plant code u102 & valuation type (EXTR) Again ente
go to the BP transection Inter the customer code then inter , next screan will apear double click on that customer code & then enter so next screen will apear go to the
update the GST Number.
1. use T-code MB22 & put the Reservation No & enter then new screen will open & tick mark on deleted flage & save. 2 another method is enter the reservation no & c
reservation & click delete.
when we have make a chages in PO price with wrong way that why changes price not updated in PO condition table so during SES price picks up priviousely instead o
need to select the line item & click on condition update the price in PRSX table & Save it.
when we have make a chages in PO price with wrong way that why changes price not updated in PO condition table so during SES price picks up priviousely instead o
need to select the line item & click on condition update the price in PRSX table & Save it.
when we have make a chages in PO price with wrong way that why changes price not updated in PO condition table so during SES price picks up priviousely instead o
need to select the line item & click on condition update the price in PRSX table & Save it.
Go to the MM01 & enter the material which we want to extend in EXTR , Select the accounting View 1 & enter the Plant code u102 & valuation type (EXTR) Again ente
Firstly we need to check the PO price in conditions there is updated or not , if not then need to update in condition Label so problems will Reslove automatically, if ser
price are diff , if po price 200 & service price is 0 , related to price & Qty issues need to check in condition table it will Resolved all kind of issues in condition table
Go through T-code ACNR & click on change Group icon & select the Non assign elements & click on assing elemets in the Group & save it Number range will assingn
All Data update from Table & compaleted master sheet
In that PO we have 2 category of item one is without cost centre & one is for Asset (A) , without cost center there is available values & with cost centre asset (A) case t
value show becouse in the Asset case final process done
Go to the Me22n & click on change & display icon after that select the service line at item label & click on account assigment symbol Bottom label & update the G/L Ac
Go to the Migo & select the Good Received & select the other & use movement type 511 & enter the Material enter batch , enter vendor , enter text Enter storage locati
Go to the T-code MM02 & go to the General Plant Data & click on tick mark on the Required batch managements
Go to the MM01 & enter the material which we want to extend in EXTR , Select the accounting View 1 & enter the Plant code u102 & valuation type (EXTR) Again ente
Go to the MM02 & select the basic data view click on the additional data & go the unit of measurment & update th bag save
Go to the MM02 & select the basic data 1 view & uptade the Gross weight & net Weight
Go to the MM02 & select the basic data 1 view & change the Description as per the Requirments
Go to the MM02 & go to accounting view 1 & update the Valuation class
Go to the MM02 & go to sales org 2 view 1 & update the Account assigments as per the Requiments
Go to the T-code MIGO & select the Goods Cenclelation & enter the material Docoments number
go to the T-code MM02 , Enter the Material code & select the Accounting view 1 & Remove the valaution category & save it . At the time remove the material category
the material from PO line item then only system will allow to save in material master
Before Delation of Service entry must be reverse the service entry & then only we can delete the service entry sheet , go to the ML81N & enter the entry sheet number
we have reversed , click on change & display report select the line item & click on delete icon.
Before set the Delation of material in PR we need to remove the valuation Tab & Remove the Valuatio price & save after that we will set the Delation flag so value will
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the Plant Genaral
drop down shipping data & update the Transportation group-0001 & Loadong Group-0001
Migo- good Receipts - other & use the Movements type 521,511 Filled the Required data & save it
go to the MM01 & enter the material which we want to extend in plant 3027 , enter the which we want to extend & where we need to copy go to sales general plant d
profit center U101 TO T101 & go to the acconting view enter the piece control from standard (S) to Moving price (V) & save it . so that the material extention will don
Go the MM02 & enter the Material & plant code & go to the accounting View 1 & update the price control from Standard (S) to Moving price (V) & save it. This accoure
control not maitain According to requirments.
Go to the Migo & select the Good issues & select the other & use movement type 512 & enter the Material enter batch , enter vendor , enter text Enter storage location
Go to the MIGO & enter click services for objects & click on create note & click on create Attchements , select the Attchedments open & save
Go to the ML81N & enter click services for objects & click on create note & click on create Attchements , select the Attchedments open & save
Go to the BP & enter the vendor or supplier Code & click on change in BP Role & select the FLVN01 & Click on purchasing & update the Purchase Organization 1005 &
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the basic data veiw
Material Group as per the Requirments.
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , Go to the Accounting ve
Valuation class as per the Requirments.
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , Go to the Genaral Plants
the Account assigments category as per the Requirments.
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the basic data veiw
Material Description as per the Requirments.
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the basic data veiw
Material Description as per the Requirments.
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the Purchasing da
the Purchaseing Group as per the Requirments.
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the Purchasing da
the Purchaseing Group as per the Requirments.
Go to the MM06 & fill it the Required Details & then enter & click on delete flag Icon & save
If we have stock in mmbe then we can not make any changes in Material master even after billing process not Done in this case De-Release the PO & Delete the Line Item & s
will automatick Remove from Stock over View & then go to the MM02 & go to the Accounting View 1 & update the valuation class as per the Requirments
If we have stock in mmbe then we can not make any changes in Material master even after billing process have Done for some Qty & there is some pending Stock are availabl
can not make any changes in Material master .
Go to the MM02 & enter the material & select the all view & enter Plant , storage location , sales organization & distribution chennal & enter , select the Purchasing da
plant Sp-Material Status & select the Required Details & block the material same we can do the basic data View 1 & X-plant Material Status & select the Required Deta
Go to the BP & enter the Customer Code & click on change in BP Role & select the Customer & Click on sales & Disbustion & click on sales Area click on Create & ente
enter & click on the Transfer bottom & update the Required Details in shipping View & billing Data & save it
Go to the MM02 & enter, Go to the Sales Text view & update the long Description & save it & same update in purchase order Text
SPRO - IMG - Logistics Excution - shipping - Basic shipping Function-Routes- Define Routes- Define Routes & stages , copy the existing Routes has been already Maps &
Fields & save it. Again select the Recent route Mapped & double click on Route Stages & Update the Required Feilds & save It ------------- again Go & click on Route Det
Maintain route Dermination & click on the Position & update the Required Feilds & save It . after That Move the TR in QAS & then Prod.
Use t-code MIGO & select the Tranfer posting -- R10 other use movements type - 411 , enter Material slip as OBD Number along with Docomets Header Text as a OBD
enter The Material code , sales Office code Storage Location & batch in From Tab---- In 2nd Tab Enter The storage Location & batch Where we wanted Move the Mater
Go To MIGO-- Select the A09 Remove from storage -- R10 other -- use Movements Type 303 -- enter The Material Slip as a material Docoments number & enter the St
plant, batch , qty from Tab in Destination Teb enter the Plant Requied Details As per the Requirments save it.
Go To MIGO-- Select the A10 Place in Storage-- enter the Material Docoments Number -- enter The Material Slip as a material Docoments number & enter the Storage
Details As per the Requirments save it.
SPRO - IMG - Logistics Excution - shipping - Basic shipping Function-Routes- Define Routes- Define Routes & stages , copy the existing Routes has been already Maps &
Fields & save it. Again select the Recent route Mapped & double click on Route Stages & Update the Required Feilds & save It ------------- again Go & click on Route Det
Maintain route Dermination & click on the Position & update the Required Feilds & save It . after That Move the TR in QAS & then Prod.
Use T-code VL02N enter the OBD Number & again Enter , click on Post goods issues & save it so actual date will Reflect Automaticaly in Rake Desposal Report
click on Layout & click on change Layout select the which need to be display & click on save as & then click on Right so that The Layout will change
STO Done Properly But while Performing OBD Throught VL10D the Plant Code was not geeting update while performing OBD
Material 9000014501 & plant code is - 1563 . Go to the MM02 enter the Material & plant code go to the accointing view 1 update the price control V for Moving .
Go to the MIGO , select the canclelation & enter the Material Docoments Number & enter click check Tab & save
The Error While making PR we have Taken Two currency INR & EUR that is the Reason there is Two Different values are showing , need to check the PR each & every
Currency . We can check through the change of Layout.
while Performing New PO if we want add a new condition type in condition View click on Magnifine Glass select the Condition as per the Requirments & update the R
Go to the BP & enter the Code , click on system Tab again click on services -- batch Input---click on log
If you create Service Purchase order with item category "D" then service line also mandatory to maintain Quantity / UOM / Gross Price and you cannot delete service
PO's. PO print can be controlled through the smart form programming…
Yes it is that possible to Un-Delete service Line item , First of all we have to De-release the PO & then click on deleted Mark of that Service Line item & drop down clic
& then save it.
This Error will accure when the Material Stock is Zero against the plant code 5000 & storage location 0212 against the batch there is no batch Not maintain
Go to the Me22n & click on change & display icon after that Go to the Additional data View & extend the Validity Period as per the Requirments save it
Go to the BP , click on organization & selct the Vendor Type ZSRV (Vendor for service) & update the Required address in address view & go to the indentification view
Legal form & Legal entity again go to the Payments Transection View & update the Bank Key Details. again go to the FI VENDOR click on general data tab & click vend
update the PAN Card Number .
Go to the t-code AC03 enter new screen will Appear click on other service number & enter the service code , click on change & display icon & edit it as per the Requirm
Go to the ML81N & enter click on other purchase order, enter the entry sheet number & click on change & display Buttom & click on Revoke buttom & save it so SES w
Go to the ML81N & enter click on other purchase order, enter the entry sheet number & click on change & display Buttom & select the Line item which we want to de
Delete buttom & save it so SES will Deleted.
Please Not That if we have Created the PO, PR & Reservation else there is stock Available in MMBE so system will not Allow to change the UOM in Material Master. As
Material have done Reservation that why system is not allowing to change the UOM. we can check that through ME5A- PR, ME2M-PO, MB51- Material status.
Yes we can Delete the Reservation & their Line Item through the T-code - MB21
No we can not Un-Delete the Line item or Reservation once the Delation Done In System
as I can see the PO there is storage location not maintain agianst the line item 20 & in delivary tab there are Valaution type maintain which is not update in Material m
check properly of that if there is something missing & then move to Material master.
We can Create only one vendor code with one Adress in BP either if there are having Muliple Branches of the same vendor code .It is not possible to maintain multiple
vedor code. accout group 0006 also not useful. please check
As we can see in the PO No:- 5000001414 in Delivary Tab There is a Valuation Type Maintain as a EXTR in Multiple Material so we need to do Debuging , Please Go in
enter the PO No & execute it after that we go for Debuging Mode & Enter /H & in variable enter GD-Edit, Variable Value- X . Again Variable- GD-SAPEDIT, variable valu
on Execute
As we can see that PO No:- 5000001679. you have Created Service PO against Standard Documents Type ZNB. it is not a Standard PO which you have Created. MIGO N
Service PO so we have to Process these Documents through the service Entry sheet. only service entry Possible.
Please Process your Service Entry sheet , ''Customizing Incorrectly maintained'' . it does not impact your service Entry. it is not an issue ''customi
Maintain'' .See the below Snapshot of the same service entry.
Kindly Took the Authorization of SU53. Kindly Run the SU53 Share the Snapshot to IT Team for the Authorization.
Go to the ME51N enter , selsect the ZMAT Docoments Type for the Material PR & then enter the Material Code , Plant code, Qty & valuation price along with Storage Lo
check Buttom & save it so that PR will Generate.
As we can see that in the screenshot you have Selected Wrong Movements Type 102. Kindly Use Movements Type 101 Goods Receipts.then we can post the Docomen
Go to AC03 & enter the Service code click on change & display Icon & undelete the Delation indicator & save it so that the will Resolved .
As we can see That in Both Material have set the valuation Category ''S'' in Material Master so we need to Delete the valuation Category from Material Master & then w
MIGO. Before Delete the Valuation Categoey ''S'' we have to check there should not be open any PO & stock Sholud be Zero in MMBE. then we can only Delete the categ
If the Error code is 8 , it means that good Received has already been done No need to GR again we can check it in Purchase order History , if the Goods Receipts not do
docoments number has already been open in someone system that why system are not allow Goods Receipts. go to vl02n & enter the try to display OBD number there
id who has been open in the system. else STO number also can be blocked.
Go to the FS00 enter the G/L 1070122 & then enter go to the Create/bank/interest Tab click on the change & edit icon like pencil & then mark the tick post automatic
OBYC & check the G/L assign with valaution class 5530 or not
Yes we can Create the ZSTO in Back Date
FS00 & click on find buttom then enter G/L & then Again Enter go to the Type/description Tab G/L Accont type current Type was nonoparating Expens or income & s
Type Primary Cost Or Revanue & enter then Go into the Control Data Tab go to the Account setting controlling Area & click on magnifine glass of cost elements Catego
Primary cost /cost Reducing Revanues & save it.
Go to OBYC T-code & click on GBB & go to the VBR & check there is 4020122 G/L Assign with Valuation class 5011 or not if not Then Assign the Valuation class 5011 w
& save first we have to do Dev Serversrs & then We can Move the TR into PRD.
Go to T-code BP click on Organization icon & select the Vendor Type ZTRP (Vendor Transporter ) & update the Address as per the Attched Docoments in Address Tab
for identification Tab update the Legal form & Legal entity, go to the Payments Transection Tab & Update the Bank Details & then save , click on BP Role group icon , s
vendor & click on purchasing Tab go to the Purchasing Data Tab & update the Required Feilds click on BP Role group icon , select the FLVN00 FI vendor & click on Com
to the Vandor Account Managments Data Tab & update the Required Feilds, go to the Vendor : Payments Transection & update Req feilds , go to the vendor:withholdin
the Required Feilds & save it
Go to the FS00 enter the G/L 1070121 & then enter go to the Create/bank/interest Tab click on the change & edit icon like pencil & then mark the tick post automatic
OBYC & check the G/L assign with valaution class 5530 or not
Go to OBYC T-code & click on GBB & go to the VNG & check there is 4020121 G/L Assign with Valuation class 5011 or not if not Then Assign the Valuation class 5011 w
& save first we have to do Dev Serversrs & then We can Move the TR into PRD.
The Reason No direct postings possible to G/L account 4000055 while performing Reservation We were entering G/L acoount Number 4000055 which we don’t nee
only cost center need to be entered & go for the forther Process. Use Movemen type - 201, & cost center as per the Requirments. G/L Number will Automaticlly picked
Backend .Enter the Material code , Qty along with Storage location.
Go Throght the Transection code MB21, enter the Movements type 201 (GI for Cost center ) & plant code (u101, u102 & U103) & then enter new screen will Appear e
center , material code & Qty along with Storage location enter & then Save . So that Resrvation number will Generate.
use the Transection code like ZME9F enter the PO Number & Execute then click on Print Priview & then enter PDF! & again enter then save the Data.
K&D
K
Go to the SE16N & use table name LFA1 & click number of entry then we will get total number of supplier & KNA1
STO Creation Done Dec'23 & perfroming of OBD in Jan'24 that's why this Error Accuring while performing OBD , need to change the Delivary Craetion Date & then we
proces.
Go Trought T-code - VL02N & enter the OBD Number click on change & display Icon & select the line item & click on Delete buttom & then save so OBD will be Deleted
We can check in Purchase order history has been processed or
We can move the Stock from Quality Inspection to Unrestricted Stock Through the use Transfer posting , Go to MIGO select the Transfer Posting ----- R10 other----mov
material move from QI to UNR . enter Material - M0401010204, plant code -U101 & Storage location as per the Requirments FROM TAB. enetr so data will fetch in des
automatically. enter Qty in Qty Tab & then click on check tab & then click on post buttom .
go to MM01 , enter the material which material u want to extend from one plant to another plant -u103, sloc--cs01, sales org---1003, Distribution chennal---99 at orga
copy from Tab enter plant U101, sloc---cs03, sales org---1003, Distribution chennal---99. maitain profit center U101- U101, U102-U102, U103-U103. cost center - V
Go to the MB21 enter the Movments type --201 , Plant code--5000 then enter cost center--T101015015, material code --- APPW000001, QTY---10MT,
while performing the MIGO in system We have select the Wrong Movements type (102) instead of 101, so we need select the Movements type 101 while performing G
Go to the ME21N & select the Docoments Type ZTRP , Enter Vandor code - xxxxx, enter purchase organization, purchase group, company code, A--U, I--D, Enter short T
Material Group , service code , short Text & Qty & gross Price. Go to the Invoice Tab enter tax code & click on GR-based-IV, S-Based-IV. Go to the Condition Tab & enter
& save it .
issues was Related to smart form which done by subhdip
Go through T-code VL09 , enter the outbond Delivary Number & execute & select the Line item & click on reverse Bottom so OBD Number will Reverse .
open the PO in ME29N & go to customer data Tab in at header Label & we can see their if GSN Number has been maintain in vendor master then it will reflect in PO ot
reflect if we have not maitain then it will not Reflect.
once the PO will Created for the Tranding product, we can make the MIGO against the purchase order directlly we can perform the Docoments number directly in MIG
Go to to the MIR7 & enter the Plant code & again enter , enter the invoice Date in date tab, enter invoice number in Reference Tab after that enter Docoments number
do MIR7 (Like PO , SES number , delivry note, ) & then click on the calculate tax, bussiness place along with Amount in basic data tab , Enter PO number in assigmen
Tab, click on simulate buttom & check if everything is in order then save it.
Go to the MM02 enter the Material code , plant & again Enter , go to the intl Trade Tab & update the HSN code As per the Requirments & save
Go to the ME21N & select the Docoments Type ZSRV & ZSES , Enter Vandor code - xxxxx, enter purchase organization, purchase group, company code, A--K, I--D, Ente
code , Material Group , service code , short Text & Qty & gross Price, G/L Account , cost center . Go to the Invoice view Tab mark on tick GR-Bsd IV along with the Tax c
Taxts View tab at header Label & enter the texts as per the Requirments.
Go to MR21 enter Plant code , Material code again click on enter & enter the new Price & save it, price changes can be done only in current Date we can check the Ent
ZU01.
Go to ME2N enter the ''ALV'' in place of ''BEST'' , Enter the Vendor code in supplier Fields & execute it then we will get list of PO against The vendor.
open the PO in ME29N & click on the Invirments Icon & click on Header changes & their we will Get the user id of that Changers
open the reoprt Through the customized T-code & click on the system application Tab & go to status view & click on the Program & click on the utilities tab & click on
click on Virsion managments & we will get the TR list.
While performing Delivary & then we Go for PGI system are not allow to becouse we have not update the Valuation type EXTR So we need to update EXTR in valuation
becouse stock which Maitain in stock overview as split valuation type EXTR there at the place of Batch where we maintain.
Smart form Devlopments has been done as per the Condition of Item Label which was incorrect after we make devlopments at Condition at Header Label
open the BP & enter the customer code again enter & click on change in BP Role search icon , select the customer click on sales & Distribution Tab & enter the sales or
channel division & enter the sales distric, customer Group , sales office & sales Group , customer price procedure(1) in orders Tab. go to the shipping Tab & enter Ship
go to the Billing Tab & enter account assigments group Customer(01) & save so that customer will extend.
open the BP & enter the customer code again enter & click on change in BP Role search icon , select the VENDOR click on Purchasing Tab & enter the Purchasing organ
the order currency & payments Terms in purchase data tab & save so that Vendor will extend.
Go to the Me29n enter the PO Number change the Net price from 1.00 to 3.00 & save it . Again click on change & display buttom chenge the price from 3.00 to 1.00 & s
stretgry Triggerd after that.
Go to the BP & enter the vendor or supplier Code & click on change & display icon & go to Status view Tab ticked on not Released, central block or Archiving Flag & sa
Go to transaction type OMS2. Check whether the material type u are using is ticked for Value update if not then mark ticked Qty updating & Value Updating in Devlopm
Move the TR into Production.
Open BP & enter the Vendor Code, click on change in BP role icon & select the FLVN01 Vendor & click on purchase Tab & click on purchase organization Tab & click on
enter the Purchase organization & enter again click on Transfer Tab then enter currency & Payments terms in purchasing data Tab & then Save Buttom.
Go to transaction type OMS2. Check whether the material type u are using is ticked for Value update if not then mark ticked Qty updating & Value Updating in Devlopm
Move the TR into Production.
Check the PO 9000000731 in ME23N. Go to item 60, tab 'Texts'. It contains: "ELECTRODE, WELDING, STAINLESS STEEL, E-316, SIZE- 3.15 MM DIA, MAKE- ADOR/ESA
click on the text that gets into the full-screen editor. Here you find: ELECTRODE, WELDING, STAINLESS STEEL, E-316, SIZE- 3.15 MM DIA, MAKE- ADOR/ESAB/L
use the graphical editor, you see that &T/D& is marked as a symbol in the text. So &T/D& shall not be printed as text. Because the symbol &T/D& does not exist, you g
message SSFCOMPOSER604. You should check how this text was entered. It looks like it was not entered in the graphical editor.To solve it, remove the "&" from "&T/
Go throught the T-code- SUIM to find the list of user by system, user by roles , user by profile , user by lincence data , etc
open the PO in ME22N only & go to the customer data at Header label Tab & enter the customer data code or Receiving plant code H101 & then save & then click on p
we can Create material PO without material code if that material is one time purchase process with the account assigments category K for the cost center & G/L then w
PO with ME21N & Docoments type ZNB ENTER THE VENDOR CODE------PORG---PGRP---COMPANY CODE----ORDERING PLANT CODE IN CUSTOMER DATA TAB-----E
MATERIAL CODE IN SHORT TEXT TAB-----QTY---- UOM-----DATE--- MATERIAL GROUP------Receiving Plant-----price per unit-----cost center----G/L----- TAX CODE & T
BASED IV IN INVOICE TAB ----- CLICK ON THE CHECKED TAB---- SAVE----PO WILL CREATE
SPRO---IMG---MATERIAL MANAGMENTS---PURCHASING-----PURCHASE ORDER----TEXTS FOR PURCHASE ORDER----DEFINE TEXTS TYPE FOR HEADER TEXTS---NE
SAVE
Go to the SE09 new screen will apear then click on create buttom & click on transport of copies, enter the short description along with traget like S4Q & click on save b
include objects , objects list from request & select the TR which we want to copy the data & click on copy Tab & select the TR number & released the TR & click on refr
Go to MM02 enter the plant code u101 , storage location , Sales organzation & distribution chennel & go to the accounting View tab 1 & remove the Valaution category
Before that we stock should be Zero if PO has been created of that line item then delete it & then master will allow toi change.
Go to MM02 enter the Material code 30000042 , plant code u101 , storage location , Sales organzation & distribution chennel & go to the sales/general plant tab 1 & u
batch & batch managments & save it .
Go to MM01, enter the Required fields & input the from Tab & copy from tab then enter the cost center from u101 to T101 & go to the accounting view 1 & enter the p
''V'' & save
Go to MM01, enter the Required fields & input the from Tab & copy from tab then enter the cost center from u102 to T101 & go to the accounting view 1 & enter the p
''V'' & save
Go to MM01, enter the Required fields & input the from Tab & copy from tab then enter the cost center from u103 to T101 & go to the accounting view 1 & enter the p
''V'' & save
Go to the CKMSTART T-CODE & enter the Plant code & untick the ( background processing & test run too) & click on execute buttom so that
will active.
Go to MM01, enter the Required fields & input the from Tab & copy from tab then enter the cost center from u101 to T101 & go to the accounting view 1 & enter the p
''V'' & save
Go to MM01, enter the Required fields & input the from Tab & copy from tab then enter the cost center from u102 to T101 & go to the accounting view 1 & enter the p
''V'' & save
Go to MM01, enter the Required fields & input the from Tab & copy from tab then enter the cost center from u103 to T101 & go to the accounting view 1 & enter the p
''V'' & save
Go to the OLMB to config the Plant parameter for the config against the Plant code, click on plant parameter & select the old any code & click on copy as a & enter the n
save.
Go to MM01 & extend the Storage location for Material 9000014501 & storage location S001 & Save.
Go to the ME51N enter , selsect the ZMAT Docoments Type for the Material PR for Asset & then enter the account assigments '' A '' & then enter the Asset code in acco
Tab , Material Code , Plant code, Qty & valuation price along with Storage Location . Click on check Buttom & save it so that Asset PR will Generate.
Go to the ME21N enter , selsect the ZMAT Docoments Type for the Material PO for Asset & then enter the account assigments '' A '' & then enter the Asset code in acco
Tab , Material Code , Plant code, Qty & valuation price along with Storage Location . Click on check Buttom & save it so that Asset PO will Generate.
Go Throught the t-code-CKM3 & we can check the price change history
MMAM
open the PO & delete the line item first then go to the material master MM02 & enter the plant code & storage Location & go to the Accounting view 1 & romove the Valuati
save
open the PO & delete the line item first then go to the material master MM02 & enter the plant code & storage Location & go to the Accounting view 1 & romove the Valuati
save
open the PO & delete the line item first then go to the material master MM02 & enter the plant code & storage Location & go to the Accounting view 1 & romove the Valuati
save
Open the Asset purchase order & reduce the Qty at Header Label & go to the account Assigments fields & reduce the qty 0.5 from Each one & then Save it.
Go through the t-code VKM4 & enter the Docoments number in SD docoments Fields & execute after that select the Line item & click on the Green flags & then save it.
T-code to find List of Reservations is MB24/MB25
AS01-- Create Asset, AS02--- change Asset, AS03---Display Asset . Enter T-code AS01. Asset class AS85 -------Company code---H001 & then again enter & go to the Time depen
bussiness area & cost center.
We can Set the Delation Flag in material master Through the T-code - MM06.
EKET
mvke
Go to the Migo , select the Good Issue --- other ---- use movemnets type- 511 & do the Stock
Issue has been resolved by changing valuation class as per given below: MM02 ==>> Material code ==>> accounting view ==>> enter plant code in accounting view there is a b
Period/Year. after clicking on this system shows a window where previous class was showing. there i have changed valuation class & issue has been resolved
While adopting the rate contract number during creation of PO kindly enter the rate contract line item in PO
Material was created with material type ZSPR with split valaution CONT & EXTR was missing in split valuation that why the different G/L was Heating . Once we go in Material
material with EXTR .
in PO - 5000001867 , We have select the account assigments Category ''A'' against the Asset Material code But we did not select the account assigments category K against th
material so kindly select the account assigments category ''K'' & then Do the MIGO.
The Released Stretgy Tab not reflecting in PO becouse in service PO we have select the wrong purchase group GM1 Instead of GS1 That is the Reason the Released stratgy tab
once I change the group from GM1 to GS1 . It was reflecting Automaticully.
we can use movments type Goods Receipts------other----movments type 511-------& then do the migo
This error occure when the Rate contract number is not Released in from intiater end or open in someone other system .
Go to the MM02 & enter the material & select the all view & enter supplying Plant , storage location , sales organization & distribution chennal & enter , select the Plan
veiw & see drop down shipping data & update the Transportation group-0001 & Loadong Group-0001
Go to the BP & enter the vendor or supplier Code & click on change in BP Role & select the FLVN01 vendor & Click on purchasing & click on purchase organization Tab
Purchase Organization 1003 & click on create tab & enter the purchase organization 1003 & click on Transfer tab & save it
open the Material Master & change the Description which has been Maintained in Material Master in purchase order Tab
In Material Master ---- purchase order Taxt there is T/D Maintain as long taxt description need to be delete & save then only we can reslove the issues Related to PR.
Go the MM02 & enter the Material & plant code & go to the accounting View 1 & update the price control from Standard (S) to Moving price (V) & save it. This accoure
control not maitain According to requirments.
Go through the t-code VKM4 & enter the Docoments number in SD docoments Fields & execute after that select the Line item & click on the Green flags & then save it.
VT01N/VT02N/VT03N
Go to the BP ----- click on organization tab-----click on grouping tab & select the YDPR Debetors Depot & railway Yard -----Address Tab & fill the address ---- Identification(legal
& save it. Again click on change in BP Role & selct the Customer-----click on sales & distribution tab & enter the sales organization -1003 , Distrubution chennel-99, Divition-99
office in order tab & customer price procedure. go to the shipping tab & enter the shipping conditions - 01, & go to the billing Tab & enter the account Assigments grp cust-01
customer change in bp Role & click on company code Tab & maintain the Reconcilation account & short Key in customer mananagment Tab & save the it.
Go Throught the T-code ME21N , Select the Documents type ZHURL Standard PO --- Enter the vendor code---- purchase group, purchase organization & company code ------- '
assigments category-----enter the Required Details------Asset code in account assigments Category.
Go Throught T-code ME32K & Enter the RC number & click on Contract Tab -----click Create with Reference------ click on purchase Requisition -----enter the PR Number & line
enter------click on adopt Details & save it
We can check at the Table Table, Go to the se16n & enter the Table name EBAN & enter the PR number & excuete so that we will get the PO Numner
PO has already been Created for the against RC Purchase order that why this Error are occuring.
VK11---
S. No. Issue/Enhancement
1 Service PR print
2 Service code long text print in PO / PR /Service Contract
3 Version management of PO and Rate Contracts
4 Contract wise PR and PO report including open and closed quantity / value
5 Service Entry Detailed report -Line item Total qty- Open Qty- Value -Invoice receipt-
6 Dyanamic entry in PO Print
7 Refurbishment or repair orders to be linked with E-waybills in SAP
Routing of goods movement through 103 & 105 with quality inspection. Requires Integration of
8
SAP-QM or an alterntaive tobe suggested.
Wharehouse mangement services - storage sublocation, bin location, printing of all GR
9
movements
10 Prints for all goods movements and respective reports.
Ensuring linking of repaired items in maintainence order and linking with gate entry and e-way
11
bill data.
10 Provision for uploading document in MIRO/SES /MIGO creation with authorization
11 Tax codes for individual service line items in the service PO.
While using the discount in the line item / header item, the discount details are not being
12 calculated in the service line item. In many cases the unit rate in service line item condition and
line item unit rate are different.
When Unlimited tab is cheked in the Service PO, the unit rates of the system cahnges to junk
13
value or turns to PR value.
14 Advance payment method in SAP to be finalized and the report of same.
15 Detailed vendor report
16 Feilds required in PO and same is required in PO report
17 Report for retrieving Long text of service and material code
Provision in PO print out is required to display unit rate on multiple qty basis. Ex. INR 10/10000
18
units
19 Batch Fields Disable in ME21N & Docoments Types ZSTO
20 New Recording BDC for MIGO against Outbond Delivery
21 Smart Form sevice PO , Deleted Service Line item is Reflecting in Service PO Print
22 WH CONFIG
Date from HURL Remark Raised by Status Priority
21.08.2023 closed Umang Closed Medium
22.08.2023 closed Umang Closed Medium
23.08.2023 Umang Open Medium
24.08.2023 under modifications Umang Open Medium
25.08.2023 under modifications Umang Open Medium
04.09.2023 Surya Kant Dubey Closed Medium
06.09.2023 Rakesh Kumar + Ravendran Open Medium
06.09.2023 Its Related to PP Module Rakesh Kumar + Ravendran Open Low
06.09.223 Not Possiable , its Related Rakesh Kumar + Ravendran Open Low
06.09.2023 Rakesh Kumar + Ravendran Open Medium
06.09.2023 Rakesh Kumar + Ravendran Open Medium
06.09.2023 Rakesh Kumar + Ravendran Closed Medium
06.09.2023 Ravendran Nagaraju Open Medium
Calculation Procedures
Sn.No. Steps T-code
1 Assign Country to Calculation Procedure OBBG Pricing
Sn.No.
Global Parameters 1
Sn.No. Steps T-code 2
1 Enter Global Parameters OBY6 3
MM4to FI Integration
5
Foreign Currency Settings 6
Sn.No. Steps T-code 7
1 Check Exchange Rate Types OB07 8
2 Define Translation Ratios for Currency Translation OBBS 9
3 Enter Exchange Rates OB08 10
4 Specify Default Exchange Rate Type in Document Type OBA7 11
Reservation Sour
Sn.No. Steps T-code Sn.No.
1 Create Reservation MB21 1
2 Change Reservation MB22 2
3 Display Reservation MB23 3
4 Reservations by Material MB24
5 Reservations by Account Assignment MB25 Quo
Sn.No.
Physical inventory Docoments 1
Sn.No. Steps T-code 2
1 Create Physical Inventory Document MI01 3
2 Change Physical Inventory Document MI02
3 Display Physical Inventory Document MI03 Invento
Sn.No.
Display Material (IH09) 1
Sn.No. Steps T-code 2
1 List Extendable Materials MM50 3
2 Material Doc. List MB51 4
3 Display Storage Location MB52 5
4 Stock Overview MMBE 6
5 Create Operating Supplies MMI1 7
6 Create Non-Stock Material MMN1 8
7 Create Service MMS1 9
8 Create Non-Valuated Material MMU1 10
9 Purchase Requisitions: List Display ME5A 11
10 Purchase Requisitions for Project ME5J 12
11 Purch. Transactions by Tracking No. MELB 13
12 Reminder: Purch. Requisition ME5F 14
13 Other Goods Receipts MB1C 15
14 Output Processing for Mat. Documents MB90 16
15 Return Delivery per Mat. Document MBRL
16 Other Goods Receipts MB1C
17 Output Processing for Mat. Documents MB90
18 Transfer Posting MB1B
19 ABC Analysis for Cycle Counting MIBC
20 Batch Input: Create Phys. Inv. Doc. MI31
21 Batch Input: Block Material MI32
22 Batch Input: Freeze Book Inv.Balance MI33
23 Btch Inpt:Ph.Inv.Docs.for Cycle Ctng MICN
24 Batch Input: Ph.Inv.Doc.Vendor Cons. MIK1
25 Batch Input: PhInvDoc. Project Stock MIQ1
26 Print physical inventory document MI21
27 Batch Input: Enter Count MI34
28 Batch Input: Post Zero Stock Balance MI35
29 Batch Input: Count and Differences MI38
30 Batch Input: Document and Count MI39
31 Batch Input: Doc., Count and Diff. MI40
32 Physical Inventory Document Recount MI11
33 Process List of Differences MI07
34 Batch Input: Post Differences MI37
35 Create Characteristic CT01
36 Change Characteristic CT02
37 Display Characteristic CT03
38 Create Class CL01
39 Classes CL02
40 Display Class CL03
41 Delete Class CL04
42 Class Types CL2B
43 Goods Receipt (GR) MIGO
44 MIGO/MB1A - Goods Issue MIGO/MB1A
45 MIRO - Logistic Invoice Verification MIRO
MM Finance integration Setting VENDOR MASTER / BP
Steps T-code Sn.No.
Posting periode verient OBBO 1
Assign posting period veriod with company code OBBP 2
open & close posting perode OB52 3
Define docoment number renge FBN1 4
defind field status verient OBC4 5
Assign field status verient with company code OBC5 6
define chart of account OB13 7
Assign chart of account to comapany code OB62 8
define acoount group OBD4 9
10
11
12
Purchase order(PO)
Sn.No.
1
Pricing Procedure 2
Steps T-code 3
create a condition table M/03 4
Define the access sequence M/07 5
Define condition types: M/06 6
Define calculation schema: M/08 7
Define Vendor schema: OMFN 8
Define schema group for purchase organisation: OMFM 9
Assign vendor schema with your business partner 10
Assign schema group for purchase organisation with
OMFP 11
purchase organisation
Define schema determination: OMFO 12
Define condition records: MEK1 13
Assign schame group to vendor XK01
RFQ
Cost Centre Sn.No.
Steps T-code 1
Creation of Cost Center KS01 2
Creation of Cost Center Group KSH1 3
Posting of Transactions in FI F-02 4
To View Cost Center Wise Report KSB1 5
Repost CO Line Items KB61
Repost Costs KB11N
Planning Cost Center Wise KP06 Service PO
S_ALR_8
To View Cost Center Wise Variance Report Sn.No.
7013611
Display Cost Center Standard Hierarchy OKENN 1
Change Cost Center Standard Hierarchy OKEON 2
Display Cost Center Accounting Document KSB5 3
4
Activity Types 5
Steps T-code 6
Creation of Activity Types KL01 7
Creation of Activity Type Groups KLH1
Enter Activity Allocation KB21N Other T-code Related to P2
Sn.No.
Statistical Key Figures 1
Steps T-code 2
Creation of Statistical Key Figures KK01 3
Creation of Statistical Key Figures Groups KBH1 4
Enter Statistical Key Figures KB31N 5
6
Service Master 7
Steps T-code 8
Service PO & PR AC01 9
Service PR (Item category - D) ME51N 10
Service RFQ ME41
Service PO ME21N Quotations
Service Entry Sheet w.r.t. Service PO ML81N Sn.No.
LIV MIRO 1
2
Source List 3
Steps T-code
Create Source List ME01 PR
Change Source List ME03 Sn.No.
Display Source List ME04 1
2
Quotations 3
Steps T-code
Create RFQ ME41 Rate contract Creation
Change RFQ ME42 Sn.No.
Display RFQ ME43 1
2
Inventory Count 3
Steps T-code 4
Enter Inventory Count with Document MI04 5
Change Inventory Count MI05
Display Inventory Count MI06
Enter Inventory Count w/o Document MI09 Material Master
Create List of Differences with Doc. MI08 Sn.No.
Create List of Differences w/o Doc. MI10 1
Print List of Differences MI20 2
Assign and Process Requisitions ME57 3
Ordering: Assigned Requisitions ME58 4
Automatic Generation of POs ME59
Display Purchase Orders by Material Group ME2C
List Purchase Orders by Number ME2N
Requisitions by Account Assignment ME5K
List Purchase Orders by Account Assignment ME2K
Display Purchase Orders by Vendor ME2L
Display PO by Material ME2M
SPRO-IMG---
Cross
VENDOR MASTER / BP Application
SPRO---
SPRO-----
Component-
IMG----Cross
IMG----
Steps T-code
----Master
application
Material
To define account group data
OBD3
component--
Managemen
to Create a numer range synchronizati
---SAP
t----- XKN1
on-----
business
Purchasing---
assing account group with number range OBAS
Customer/Ve
partner------
----Partner
define & maintain busness partner Business BP
ndor
determinatio
Define Bp role grouping integration--
SPRO-----
partner-----
n----Partner
SPRO-----
SPRO-----
--Business
BasicIMG----
Setting in
Define number rangee IMG----
BUCF
IMG----
partner
Material
setting----
Supplier
Material
Define grouping & define Number Range Material
Setting-----
Managemen
Business
Master
Managemen
Managemen
Asign BP grouping With vendor grouping Setting
partner
Record--t-----for
t-----
t-----
Vendor
Purchasing---
role-------
Assign
define parner role Purchasing---
Purchasing---
integration--
Define Permissible partner roles as per the account partner
----Partner
Define BP
----Partner
----Partner
group role
schema---Field
determinatio
determinatio to
Define Partner Schema determinatio
assignment
n----Define
grouping
account .
n----Partner
n----Define
Assign Partner Schema to account group for
group Vendor
permissible
Setting in
Partner roles
Role
integration--
partner
Supplier
--Assign
as per
Master
Service Master Keys-----
account
record--
Steps T-code
Define
group
Define
create a service master Number
AC03
partner
assignment
Schema
create a material group for OMSF
direction
Create the Valuation class: OMSK
BP to
Define number range PATH Vendor.
FALLOW
To check the list of services that you have created: AC05/OXA1
To create the source of supply: ME01
to generate the source list ME05
to check the input storage data SE16/SE16N
Purchase order(PO)
Steps T-code
Create PO ME21N
change PO ME22N
display PO ME23N
Release PO ME29N
List of supplier MKVZ
Purchasing Docoments per supplier ME2L
Purchasing Docoments per docoments number ME2N
Purchasing Docoments for material ME2M
Create purchase info Record ME11
change info record ME12
Display info record ME13
Delation Info Record ME14
Material price change MR21
RFQ
Steps T-code
Create RFQ ME41
change RFQ ME42
display RFQ ME43
External vendor Request for quotation ME44
Source of Supply ME01
Service PO
Steps T-code
Create Service PO ME21N
change Service PO ME22N
display Service PO ME23N
Release Service PO ME29N
Service entry against PO. ML81N
List of Service Entry Sheet ML84
List of Service Code AC05/AC06
Quotations
Steps T-code
Create Quotation ME47
Display Quotation ME48
Price Comparison List ME49
PR
Steps T-code
Purchase Requisition ME54
Collective of Purchase Reqs. ME55
Assign Source to Purch. Requisition ME56
Rate contract Creation
Steps T-code
contract creation ME31K
Change contracts creation ME32K
Display contracts creation ME33K
Release contracts Creation ME35K
Material Master
Steps T-code
Create Material MM01
Change Material MM02
Display Material MM03
Display Material Document MB03
M
P2P CYCLE Remarks
PR Create ME51N/ME52N/ME53N/ME54N
PO Create Material PO, Service PO, STO ME21N/ME22N/ME23N/ME29N
Good Receipts/Service entry sheet MIGO/ML81N
Invoice Park Invoice Park MIR7
Invoice Booking Invoice Booking MIRO
FBL1N
MM finance
2 intgration Define docoment number renge
setting
defind field status verient
Assign field status verient with company code
define chart of account
Assign chart of account to comapany code
define G/L acoount group
vendor master
3 or VP( bissness
partner).
Asign BP grouping With vendor grouping
vendor master
3 or VP( bissness
partner).
Create PR
change PR
display PR
Create RFQ
change RFQ
7 P2P display RFQ
External vendor Request for quotation
Compare price
Source of Supply
Good receipts
Invoice Receipt
Purchase requisition tables
Account assignment information.
Document types:
To close previous period and open new period.
Automatic
8 account
determination:
Automatic to maintain account
8 account
determination: Create BOM: CS01 (Trek bag)
change BOM
Display BOM
To check the stock of our material t-code
To check the material linkage to BOM: Table MAST
Batch Lavel and batch status managements
Active internal batch number assigment
Classify batches with in goods Movments
Create a condition Table (batch determination production order )
Define Acces Sequence
Change Asses Sequences over view
change veiw Acces Sequences
change veiw stretgy types
Change stretgy Type
Change view Procedure
Change view Procedure
Search procedure batch dertermination
Order type dependend parameter
SAP MM Module Configaration & intgration with custmization testing ,mapping
T-code
OX15
OX02
OX10
OX09
OME4
OX08
OX16
OX01
OX18
OX17
EC01
SCAL,SE01
OBBO
OBBP
OB52
FBN1
OBC4
OBC5
OB13
OB62
OBD4
OBD3
XKN1
OBAS
BP
BUCF
SPRO-IMG---Cross Application Component-----Master data
synchronization-----Customer/Vendor integration----Business
partner Setting-----Setting for Vendor integration-----Field
assignment for Vendor integration----Assign Keys-----Define
Number assignment for direction BP to Vendor.
SPRO-----IMG----Material Management-----Purchasing-------
Partner determination---- Partner Role-----Define Partner Role
SPRO-----IMG----Material Management-----Purchasing-------
Partner determination----Partner Roles------Define permissible
partner roles as per account group
SPRO-----IMG----Material Management-----Purchasing-------
Partner Setting in Supplier Master record--Define partner
Schema
SPRO-----IMG----Material Management-----Purchasing-------
Partner determination----Partner Setting in Supplier Master
Record--Assign partner schema to account group
OB29
OB37
OMSY
OMS2
OMS3
OMSF
OMX2
OMX3
OMSK
OMX1
CKMSTART
MM01
MM02
MM03
CUNI
AC03
OMSF
OMSK
PATH FALLOW
AC05/OXA1
ME01
ME05
SE16/SE16N
M/03
M/07
M/06
M/08
OMFN
OMFM
OMFP
OMFO
MEK1
XK01
ME51N
ME52N
ME53N
ME41
ME42
ME43
ME44
ME47
ME01
MIGO
MIRO
EBAN
EKBN
OBA7
MMPV
OBYC
CS01
CS02
CS03
MMBE
MAST
OMCT
OMCZ
OMCV
OPLB
V/07
OPLF
V/C2
OPLE
V/C1
OMCY
OPLG
OMCG
OPL8
v/c5
V/CL
CL01
CU70
OMBB
on testing ,mapping
Description DEFINITION
AKP , AKSHAY GROUP OF COMPANY
0002, AKSHAY GROUP OF COMPANY
AKPL
AKSL , STORAGE LOCATION
purchasing group-005,description- raw material, mob
no- 8825648857
Purchase organization - AKPO , discription- akshay
purchase group
cocd-0002, company- akp
porg-akpo, desp-akshay purchase organazation , cocd-
002, company - akshay group of company
cocd-0002, plant- akpl, name of the plant- akshay
interprise plant , company name-akshay group of
company
porg-akpo, desp-akshay purchase organazation , cocd-
002, company - akshay group of company
PENDING
0623BAAP01
Creattin of Enterprise structure MM finance intgratio
Sn No Name T-code Sn No
1 Create a company OX15 1
2 Create a company code OX02 2
3 Create a plant OX10 3
4 Create a storage location OX09 4
5 create a purchasing Group OME4 5
6 to create a purchase organization OX08 6
7 to assing company code with company OX16 7
8 to assin purchse organization with compnay code OX01 8
9 to assign plant with the company code OX18 9
10 to assign plant with purchase organization OX17
11 to check interprise structure EC01
12 to create the fectory colender SCAL,SE01
Inter STO Step process & Config Intra STO Step process
Sn No Name T-code Sn No
1 Create a vendor master BP 1
2 Create a customer master BP 2
3 Create a Material master MM01 3
4 Extend the Material in Material master MM01 4
5 Define shipping Point OVXD 5
6 Assign shipping point with Plant OVXC 6
7 Define shipping Point Determination OVL2 7
8 Create STO ME21N 8
9 Stock overview MMBE 9
10 Stock overview MB52 10
11 Stock overview MB5B 11
12 History of stock overview MB51 12
13 Purchase info record ME11 13
14
15
16
17
18
Pricing procedure
Name T-code
create a condition table M/03
Define the access sequence M/07
Define condition types: M/06
Define calculation schema: M/08
Define Vendor schema: OMFN OMFN
Define schema group for purchase organisation: OMFM
Assign vendor schema with your business partner
Assign schema group for purchase organisation with purchase
OMFP
organisation
Define schema determination: OMFO
Define condition records: MEK1
Assign schame group to vendor XK01
Batch management
Name T-code
Batch Lavel and batch status managements OMCT
Active internal batch number assigment OMCZ
Classify batches with in goods Movments OMCV
Create a condition Table (batch determination production order ) OPLB
Define Acces Sequence V/07
Change Asses Sequences over view OPLF
change veiw Acces Sequences V/C2
change veiw stretgy types OPLE
Change stretgy Type V/C1
Change view Procedure OMCY
Change view Procedure OPLG
Search procedure batch dertermination OMCG
Order type dependend parameter OPL8
v/c5
V/CL
CL01
CU70
OMBB
Material master
Name T-code
Create a Material master MM01
Extend the Material in Material master MM01
Change material master MM02
Display material master MM03
Define fiscal/financial period OB29
Assign fiscal period with company code OB37
Activate the company code setting with material management OMSY
Define material type OMS2
Define industry sector OMS3
Define material group OMSF
Define material ledger OMX2
Assign material ledger with valuation area OMX3
Activate the material ledger OMX1
Activate the production job CKMSTART