COMPRESSIVE STRENGTH TEST RESULT OF HARDENED CONCRETE CUBE
Method IS 456:2000
SAMPLE LABEL INFORMATION
Project Name :- Dakshineswar clubbata Gumbajane bato ma wall nirmaan
Office of the Municipal Executive, Lab. Ref. No. :- C-001
Client :-
Budhanilkantha Municipality Date of Casting :- 2081-08-03
User's Committee Tusal Village Upabhokta Samiti, Bu.Na.Pa.-5
Type of Structure :- Plum Concrete Wall Class of Concrete :- M20/20
Ratio :- Location :- Jointly
Name of lab :- Treasure Lab and Engineering Consultant P. Ltd., Chabahil
Sampled By :-
Cement Manufactured Shivam OPC Admixture :-
Source of Sand Type Melamchi Additive :-
Source of Aggregate Type Melamchi Water :-
Slump (mm) Climate :-
Age of Cube Day 7 Days 28 Days
Date of Testing 2081-08-10 2081-09-01
Identification numbers No 1 2 3 4 5 6
Length of Cube, L cm 15.0 15.0 15.0 15.0 15.0 15.0
Breadth of Cube, B cm 15.0 15.0 15.0 15.0 15.0 15.0
Height of Cube, H (diagonal) cm 15.0 15.0 15.0 15.0 15.0 15.0
Volume of Cube = (L*B*H) cm3 3375 3375
Area of Cube = (L*B) cm2 225 225
Weight of Cube, (gms) A 8156 8116 8088 8198 8178 8198
Density of Cube = A / V gm/m3 2.417 2.405 2.396 2.429 2.423 2.429
Breaking Load , M kN 375 377 389 520 510 505
Corrected Breaking Load kN 383.3 381.2 395.5 555.2 544.2 538.7
Cube Strength = (M/(L*B)*10N/mm2 17.03 16.94 17.58 24.68 24.19 23.94
Average Cube Stregth N/mm2 17.18 24.27
Description Specification Avg. Actual Value
Cube Curing Period (Days) 7 21 7 28
Compressive strength , N/mm2 13.00 20 17.18 24.27
Comments :-
Tested By: Checked By:
* Note: Samples are not taken by us. This test report only represents the tested sample.