0% found this document useful (0 votes)
95 views2 pages

Lifting Hook

The document contains two reports on the examination of lifting machines at Mesuka Eng. Co. Pvt Ltd., conducted by Brijesh Naik on December 6, 2024. Both lifting hooks, identified as LH/15 and LH/16, passed inspection with no defects found, confirming their safety for use at a SWL capacity of 6 tons. The next inspection for both machines is due on December 5, 2025.

Uploaded by

gurudevssrji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views2 pages

Lifting Hook

The document contains two reports on the examination of lifting machines at Mesuka Eng. Co. Pvt Ltd., conducted by Brijesh Naik on December 6, 2024. Both lifting hooks, identified as LH/15 and LH/16, passed inspection with no defects found, confirming their safety for use at a SWL capacity of 6 tons. The next inspection for both machines is due on December 5, 2025.

Uploaded by

gurudevssrji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

FORM NO.

: 10
(Prescribed under rule 60)
Prescribed for report Examination of the lifting machines, ropes and lifting tackles.
Report No.: RCIPL/AMNS/MECPL/DEC-24/001 Date : 06/12/2024

1. Name of occupier of factory : Mesuka Eng. Co. Pvt Ltd.


2. Address of factory : Site : 27 KM Surat-Hazira Road, Hazira, Surat.
3. Distinguishing number of mark (if any) and : Lifting Hook
description sufficient to identify the lifting Id No.: LH/15
machine, chain, rope or the lifting tackle. SWL Capacity: 6 Ton
Length of Plate : 555mm, Hook Eye Inside Dia :
54mm, Hook Thickness : 32mm, Height : 300mm,
Plate Eye Inside Dia : 40mm
Location: CRM-2 (AM / NS)
4. Date when the lifting machine, chain, rope or : Not Known
lifting tackle was first used in the factory.

5. Date of each examination made under section : Thorough inspection carried out on 06/12/2024 by
29(1)(a)(iii) and by whom it was carried out. BRIJESH NAIK Competent Person. (Load test at
1.25 Times of SWL)
6. Date and number of the certificate relating to : Not Available
any test examination made under sub- rule (1)
of Rule 60 together with the name of the
person who issued the certificate.

7. Date of annealing or other heat treatment if the : Not Applicable as per sub rule 6 of rule 60.
chain and lifing tackle carried out under
sub-rule(5) of Rule 60 and by whom it was
carried out.

8. Particulars of any defect found at any such : No defects noticed. Safe to use at SWL Capacity.
examination or after annealing and affecting
the safe working load and the steps taken to
remady such defect.

I certify that on 06/12/2024 , I have thoroughly examined the above mentioned lifting Machine/Chain/
Rope/Lifting tackle and that the above is correct report of the result.

Signature __________________
Name of the Competent Person : BRIJESH NAIK
Qualification : BE MECHANICAL
ANST LEVEL II IN UT, RT, PT, MPT
Competency Certificate No. : GUJ/DISH/CPT/A/1166/2023 VALID UP TO 28/04/2025.
Issued By : Director, Industrial Safety & Health, Gujarat State, Ahmedabad

Next Inspection Due on : 05/12/2025


FORM NO. : 10
(Prescribed under rule 60)
Prescribed for report Examination of the lifting machines, ropes and lifting tackles.
Report No.: RCIPL/AMNS/MECPL/DEC-24/002 Date : 06/12/2024

1. Name of occupier of factory : Mesuka Eng. Co. Pvt Ltd.

2. Address of factory : Site : 27 KM Surat-Hazira Road, Hazira, Surat.

3. Distinguishing number of mark (if any) and : Lifting Hook


description sufficient to identify the lifting Id No.: LH/16
machine, chain, rope or the lifting tackle. SWL Capacity: 6 Ton
Length of Plate : 555mm, Hook Eye Inside Dia :
54mm, Hook Thickness : 32mm, Height : 300mm,
Plate Eye Inside Dia : 40mm
Location: CRM-2 (AM / NS)
4. Date when the lifting machine, chain, rope or : Not Known
lifting tackle was first used in the factory.

5. Date of each examination made under section : Thorough inspection carried out on 06/12/2024 by
29(1)(a)(iii) and by whom it was carried out. BRIJESH NAIK Competent Person. (Load test at
1.25 Times of SWL)

6. Date and number of the certificate relating to : Not Available


any test examination made under sub- rule (1)
of Rule 60 together with the name of the
person who issued the certificate.

7. Date of annealing or other heat treatment if the : Not Applicable as per sub rule 6 of rule 60.
chain and lifing tackle carried out under
sub-rule(5) of Rule 60 and by whom it was
carried out.

8. Particulars of any defect found at any such : No defects noticed. Safe to use at SWL Capacity.
examination or after annealing and affecting
the safe working load and the steps taken to
remady such defect.

I certify that on 06/12/2024 , I have thoroughly examined the above mentioned lifting Machine/Chain/
Rope/Lifting tackle and that the above is correct report of the result.

Signature __________________
Name of the Competent Person : BRIJESH NAIK
Qualification : BE MECHANICAL
ANST LEVEL II IN UT, RT, PT, MPT
Competency Certificate No. : GUJ/DISH/CPT/A/1166/2023 VALID UP TO 28/04/2025.
Issued By : Director, Industrial Safety & Health, Gujarat State, Ahmedabad

Next Inspection Due on : 05/12/2025

You might also like