0% found this document useful (0 votes)
20 views13 pages

Inventory Format

The Diagnostic Study Report provides an overview of an organization established in 2000, detailing its operations, staff structure, and current sales turnover of Rs. 145.15 lakhs as of September 2012. It outlines the plant layout, manufacturing processes, and quality control measures, including ISO 9001:2008 certification and various quality practices. The report also assesses lean manufacturing principles and identifies areas for improvement in efficiency and waste reduction.

Uploaded by

qms1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views13 pages

Inventory Format

The Diagnostic Study Report provides an overview of an organization established in 2000, detailing its operations, staff structure, and current sales turnover of Rs. 145.15 lakhs as of September 2012. It outlines the plant layout, manufacturing processes, and quality control measures, including ISO 9001:2008 certification and various quality practices. The report also assesses lean manufacturing principles and identifies areas for improvement in efficiency and waste reduction.

Uploaded by

qms1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 13

DIAGNOSTIC STUDY REPORT(DSR)

ORGANISATION

Year of Establishment 2000

HEAD OFFICE

OFFICE TELE.

FAX N.A.

E - MAIL

Business Activity
WEBSITE

WORKS

A B C G
SHIFT OPERATION
YES YES YES YES
0800- 1600- 0000- 0900-
SHIFT TIMING
1600 0000 0800 1700
STAFF 2 2 1 8
WORK
REGULAR WORKERS 14 14 4
FORCE
CASUALS 18 16 14

CURRENT SALES TURN OVER


145.15
Rs.LAKHS TILL 31-09-12

ORGANISATION STRUCTURE (DOWN UPTO SUPERVISOR LEVEL)


Operations

Tarlok Singh

Plant Layout & Manufacturing process flow


Plant layout of the unit and process flow chart
PLANT LAYOUT OF DYNAMIC ENGINEERING INDUSTRIES

MAIN GATE
DG SET ROOM

SECURITY
BOOTH

OFFICE

SUPER
CNC CNC CNC 02
VISOR WIP
TABLE 07 05

CNC CNC CNC CNC CNC


08 01 06 03 04

D
P P SR D E
D D MI E B
E
I I SC. BK K
M/ T. B T.
Cs LI N K LI
WASHING
GAUGES E T. N
AREA E

ROUGHING AREA
D
P P SR D E
D D MI E B
E
I I SC. BK K
M/ T. B T.
Cs LI N K LI
WASHING
GAUGES E T. N
AREA E

ROUGHING AREA

CNC 10
INSPECTION SPARE
AREA MACHINES
CNC 09 CNC 11

AL DE BKT.DRILLING

MAINTNE-
NANCE STORES
ROOM
WORKER
STORES
TOILET

AIR
STEEL SCRAP COMPRESS SHOT BLASTING SPARE MACHINES
AREA OR

TOTAL AVG. TIME OF AVG.TOTAL TOTAL TOTAL


QTY CHANGE CHANGE CHANGE CHANGE OVER
OVER OVERS OVERS/YEAR TIME/YEAR
DESCRIPTION /PRODUCT /MONTH

(A) (B) (C.) (D)=(C.)*12 (E)=(B)*(D)

MOLDS NA

DIES NA

CUTTING TOOLS 46

FIXTURES 505 20 MINS 400 MINS 8000 MINS 96000 MIN

Visual Base lining Summary

CURRENT STATUS
FOCUS AREA NO AWARENESS EDUCATION ON HAND HOLDING ADVANCED ROLE MODEL
TRAINING IN IMPLEMENTATIO
PROGRESS N

5s & Kaizen
*
Safety
*
Visual Control
*
Storage
*
Maintenance
*

Quality

Certification: ISO:9001 2008 (YES/NO), if No then what certification ? ISO:9001 2008

Customer PPM NIL

Inhouse PPM 5000

Supplier PPM. NA

CURRENT STATUS
NO AWARENESS EDUCATION ON HAND HOLDING ADVANCED ROLE MODEL
Quality Practices TRAING IN
PROGRESS
IMPLEMENTATIO
N

Suggestion scheme
*
Quality Circles
*
Shop floor meetings
*
Monthly meetings
*
Use of problem solving
techniques *
Continuous Improvement
(Kaizen) *
Cost of Quality
*

Identification of Seven wastes 2.6


Evaluation on a scale of 1 to 5. (5 being ‘completely lean’ and 1, ‘completely traditional’.)
SCALE DESCRIPTION
5 - Completely Lean Fully follows Lean principles in both letter and spirit and thereby enjoys
benefits of high efficiency fully meeting customer requirements.
4 - Largely Lean Follows lean principles in many areas with few of the traditional practices

3 – Moderate Follows a mix of lean and traditional practices equally

2 - Largely Traditional Follows Traditional practices largely – just getting aware of lean practices
and practicing in few of the areas
1 - Completely Traditional No existence of any Lean practices

7 WASTES -Mr.TIMWOOD
SHORT FULL DESCRIPTION CURRENT LEVEL COMMENTS
T TRANSPORTATION 2
I INVENTORY 2
M MOTION 2
W WAITING TIME 3
O OVER PRODUCTION 3
O OVER PROCESSING 3
D DEFECTS 3
D.E.BKT - AL 0022 D

CUSTOMER SUPPLIED COMPONENT

INSPECTION & STORAGE


ROUGH & FINISH BORE DIA.

FILING OF ALL SHARP EDGES

DRILLING OF DIA.5.2 HOLES

MILLING OF LUG FACES

DRILLING OF DIA.2.2 - 2 HOLES

CLEANING & VISUAL INSPECTION

PACKING

DESPATCH

PROCESS FLOW DIAGRAM

GEAR 4TH DRIVE - 2013869/F

CUSTOMER SUPPLIED FORGING

INSPECTION & STORAGE

ROUGH MACHINING

FINISH TURNING - OIL SLOT SIDE

FINISH TURNING & KIDNEY SLOT MILLING

DEBURRING

INSPECTION - PREDESPATCH

RUST PREVENTIVE APPLICATION

PACKING
DESPATCH

PROCESS FLOW DIAGRAM

SRE BKT. - SM0081B

CUSTOMER SUPPLIED COMPONENT

INSPECTION & STORAGE

MACHINING OF BEARING DIA.

FILING OF SHARP EDGES

DRILLING OF DIA.2.4 - 2 HOLES

DRILLING OF DIA.3.9 - 3 HOLES

DRILLING OF DIA.3.9

DRILLING OF DIA.9.0

DRILLING OF DIA.3.0

DRILLING OF DIA.3.9 - 3 HOLES

COUNTER & REAMING

TAPPING OF M5 - 4 HOLES

TAPPING OF M5 -THRU

TAPPING OF M5 THRU - 3 HOLES

TAPPING M3

WASHING & DEBURRING

INSPECTION
DESPATCH

PROCESS FLOW DIAGRAM

SMDE BKT. - SMDE 152

CUSTOMER SUPPLIED COMPONENT

INSPECTION & STORAGE

SHOT BLASTING

ROUGH & FINISH O.D.TURNING

ROUGH & FINISH (SOLENOID MTG.FACE)

FILING OF SHARP EDGES

DRILLING OF MOUTING HOLE DIA.11DIA.

DRILLING OF DIA.5.5

MILLING OF SHROUD DIA.

TAPPING - M6

WASHING&DEBURRING

CLEANING & VISUAL INSPECTION

INSPECTION -PREDESPATCH

PACKING

DESPATCH
LEAN MANUFACTURING CLUSTER
Lean Manufacturing Cluster Team
Company Name :

Company Address: 0
DATE OF FORMATION OF LMC TEAM:
Ref. NAME DESIGNATION TEAM ROLE DEPTT. EXPERIENCE in MOBILE NO. E-MAIL
years Total (with
the company)

1 PROPRIETOR CAPTAIN 27

2 WORKS MANAGER VICE CAPTAIN 22

3 HEAD Q.A. TEAM MEMBER Q.A. 18

4 HEAD ACCOUNTS TEAM MEMBER ACCOUNTS 16

5 SUPERVISOR TEAM MEMBER M/C SHOP 13

6 SUPERVISOR TEAM MEMBER DRILLING 18

7 OPERATOR TEAM MEMBER CNC 18

8 OPERATOR TEAM MEMBER CNC 8

9 SUPERVISOR TEAM MEMBER MAINTENANCE


###

Inventory
NAME OF COMPANY 0 DATE
0 PREPARED BY
ADDRESS OF COMPANY
APPROVED
MONTHS
Metrics Units
Jan.25 Fab.25 Mar.25 Apr.25 May.25 Jun.25 July.25 Aug.25 Sep.25 Oct.25 Nov.25 Dec.25

Raw Material (RM) Rs. Lakhs

Finished Goods(FG) Rs. Lakhs

Work In Progress(WIP) Rs. Lakhs

Non Moving ITEMS Rs. Lakhs

Scrap Rs. Lakhs

Total Inventory Rs. Lakhs 0 0 0 0 0 0 0 0 0 0 0 0

Sales Turnover Rs. Lakhs

Inventory Turnover No. of times #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

You might also like