4
4
Scaffold
Suspended Scaffold
                                               Refers to scaffolds in which the supports for the platform are step
                Trestle Scaffold
                                               ladders, tripods or similar movable contrivances.
                                               Also referred to as sole plates, are the load-bearing base of a
                 Base Plates                   scaffold. They're used to distribute weight and support the vertical
                                               scaffolding poles known as standards.
                                                Also known as uprights, verticals, or legs, are the long pipes or
                  Standards
                                                tubes that connect the whole scaffold to the ground.
                                              1/9
4 Scaffolding Safety Guidelines and Regulations
Study online at https://quizlet.com/_gt064s
                                               Also referred to as runners, ledgers are tubes that run horizontally
                    Ledgers
                                               along the length of the scaffold.
                   Transoms                           Horizontal members that meet the ledgers at right angles.
                                                    Provide support for the standards and the working platform by
                Main transoms
                                                    holding them in position.
                                                    Provide additional board support when placed at intervals be-
           Intermediate transoms
                                                    tween the main transoms.
                    Boards                               Planks that form the working platform on a scaffold.
                   Couplers                                    Hold components of a scaffold together.
                    Braces                                Diagonal tubes that reinforce the scaffold's rigidity.
                                               Provides strength by controlling the 'unbraced length' of the scaf-
                    Bracing
                                               fold leg.
                                               So that the worker can stand on the platform to do their work easily
               Working platform
                                               and safely.
                                                    Scaffolding supports the platform used by the worker as their
       Platform and walking passage
                                                    walking path to transport the material and logistics.
                                                    Every scaffold must be built with materials that are strong and
               Quality materials
                                                    sturdy enough for the specific job it's meant to do.
                                                Timber used for scaffolds should be in good condition, with the
               Timber condition                 bark fully removed, and not painted or treated in any way that
                                                would hide defects.
Height limit for timber or bamboo scaffolds    Should not exceed a height of 6 meters from the ground or base.
                Steel scaffolds                        Must be used instead for scaffolds taller than 6 meters.
                                                    Must have stress removed from welded or bent joints, and the
         Load-bearing components                    design and construction must be approved by the appropriate
                                                    authority.
           Manufactured scaffolds               Must comply with the manufacturer's designs and specifications.
                                               The technical properties and data of scaffolds must be certified by
                 Certification
                                               a qualified testing laboratory.
                                               Must create and approve the design for scaffolds over 6 meters in
             Structural engineer
                                               height.
                                                    Must be approved by the appropriate authority after being de-
          Site-fabricated scaffolds                 signed and examined by a structural engineer if taller than six
                                                    meters or has a working load more than 150 kg/m².
          Fall protection equipment                  Must be used when working at heights of 2 meters or more.
            Fall arrest equipment                        Required for work at heights of 10 meters or above.
                                               All personnel involved in scaffolding must have proper training and
          Training and certification
                                               certification.
                                                Each scaffold platform must be fully decked or planked between
          Scaffold platform decking
                                                the uprights and guardrail supports.
                                                Should be installed with a gap no wider than 1 inch (2.5 cm)
               Platform unit gap
                                                between adjacent units and between the platform and uprights.
                                               Each scaffold platform and walkway should have a minimum width
           Minimum platform width
                                               of 18 inches (46 cm).
                                                Must extend at least 6 inches (15 cm) beyond its support center-
           Platform end extension
                                                line, unless secured by cleats, hooks, or similar means.
                                               The end should not extend more than 12 inches (30 cm) unless
 Platform extension for 10 feet or shorter     designed to support workers or materials safely or has guardrails
                                               preventing access to the cantilevered end.
                                              2/9
          4 Scaffolding Safety Guidelines and Regulations
          Study online at https://quizlet.com/_gt064s
Should not extend more than 18 inches (46 cm) beyond their
support unless they are designed to safely hold workers or have
guardrails preventing access to the cantilever end.
Outrigger Beams
                                              5/9
4 Scaffolding Safety Guidelines and Regulations
Study online at https://quizlet.com/_gt064s
                                               Attach the mast to the base securely and verify all connections are
        Mast and Platform Assembly
                                               stable.
                                                    Inspect the power source and test the control panel to confirm
         Power and Controls Testing
                                                    lifting and lowering functions work correctly.
                                               Install guardrails on all open sides of the platform and ensure fall
Guardrails and Safety Features Installation
                                               protection equipment is available and used properly.
                                                Verify that the scaffold platform does not exceed the rated load
            Load Capacity Check
                                                capacity, factoring in the weight of workers, tools, and materials.
                                                Conduct a thorough inspection of the assembled aerial scaffold,
           Final Safety Inspection
                                                including all safety systems and structural components.
                                               All modifications should not impair the stability of the scaffold and
                 Modifications
                                               should be approved if adding sheeting or debris netting.
                                                A process to ensure that scaffolds are safe for use and properly
      Scaffold Inspection and Tagging
                                                marked.
             Scaffold Inspection                            All scaffoldings shall be inspected prior to use.
                                                Inspection and tagging shall be performed by a qualified or com-
               Qualified Person
                                                petent person.
                                               All manufactured scaffolds shall follow the manufacturers' recom-
           Manufactured Scaffolds
                                               mendations.
                                               Direct connections shall be evaluated by a qualified or competent
       Direct Connections Evaluation           person who shall confirm that the supporting surfaces can resist
                                               the loads to be imposed.
            Inspection Frequency                        Inspections should be carried out daily and every shift.
                                               All site fabricated/conventional supported scaffolds exceeding 6
    Height Requirement for Evaluation          meters in height or a working load of 150 kg/m2 shall be evaluated,
                                               tested and approved by a qualified person.
                                               All scaffold identification tags shall be of a solid green, yellow, or
         Scaffold Identification Tags
                                               red color with black lettering.
                                                    Green tags shall be hanged at each scaffold access that have
                  Green Tags
                                                    been inspected and are safe for use.
                                                    Yellow tags shall be placed whenever special requirements for
                  Yellow Tags
                                                    safe use are required.
                                                Red 'DANGER - UNSAFE FOR USE' tags shall be used during
                   Red Tags
                                                erection and dismantling when the scaffold is left unattended.
                                                All the records of the inspections shall be available on site and
             Inspection Records
                                                made available to proper authority upon request.
                                               All scaffolds shall be properly maintained and every part shall be
            Scaffold Maintenance
                                               kept, fixed and secured in position to prevent displacement.
                                                No partly dismantled scaffold shall be used unless it is rendered
         Partly Dismantled Scaffold
                                                stable, strong and safe for the purpose.
                                               Scaffoldings left standing for four (4) months shall not be used until
         Standing Scaffold Duration
                                               damaged members are replaced.
                                               During dismantling, no component which endangers the stability
              Dismantling Safety
                                               of the remaining structure should be removed.
                                               If dismantling has reached the stage at which a critical member
                                               has to be removed, the stability of the structure should be assured
          Critical Member Removal
                                               by fixing a similar or otherwise adequate member in place before
                                               removal.
                                               If changes are made in the scaffold structure during its working
              Dismantling Order                life, it is not safe to assume that dismantling can be carried out in
                                               the reverse order to the erection.
              Material Handling
                                              6/9
4 Scaffolding Safety Guidelines and Regulations
Study online at https://quizlet.com/_gt064s
                                               Materials should be lowered to the ground and not stored on the
                                               scaffold.
                                                Scaffolds, which are to be progressively dismantled during the
          Progressive Dismantling               demolition of a building, should not be left projecting above the
                                                residual height of the walls more than is necessary.
                                                    Scaffolds, which are to remain in use while partly dismantled,
     Partly Dismantled Scaffold Safety
                                                    should be fitted with end guardrails and toe boards.
                                                If access is possible onto a partly dismantled scaffold, warning
               Warning Notices
                                                notices should be fixed.
                                                Scaffolds accessories requiring lubrication shall be oiled prior to
    Scaffold Accessories Maintenance
                                                storage in a covered or closed container.
                                                All loading and unloading operations, including transport of scaf-
       Loading/Unloading Operations
                                                folds, shall be properly planned by a competent person.
                                                During loading/unloading and transport of scaffolds, the opera-
             Transport Planning                 tions shall be appropriately supervised and carried out in a safe
                                                manner.
                                                Equipment provided on any scaffold 2m (6 feet) or more above
    Scaffold Fall Protection Equipment
                                                ground to protect personnel from falling.
                                               Platforms supported by legs, outriggers, beams, brackets, poles,
             Supported Scaffolds
                                               uprights, posts, frames, or similar rigid support.
                                                A system that reduces injury when a fall occurs, comprising an
                                                anchor, fall arrest connector, and harness.
9/9