light points fed through PVC insulated conductors 2x2.5sqmm inside PVC crochet conduits
a of 16mm diameter including junction boxes with cover and insulting sctrew cap connectors no 1 2810.36 2,810.4
1.5 extra over light points No 0.0
a flush mounting single switch No 1 519.73 519.7
1.6 SOCKET OUTLET POINTS 0.0
16A/1P single socket outlet points fed through PVC insulated conductors of 3x2.5mm2
inside PVC conduits of 16mm diameter including junction boces with covers and insulating
a screw cap connections No 1 3297.57 3,297.6
1.7 socket outlets 0.0
flush mounting single socket outlet of 16A/1P No 1 521.05 521.1
LIGHTING FITTING AND LAMPS 0.0
LED round panel, 18W lp67 No 1 1171.17 1,171.2
Total Carried To Summary .................... 8,319.88
Take off sheet
Project:- wereda 09 site Consultant:-_________________
Typology:-G+0 garbage storage Contractor:-_______________
Guard house Site Name:-_________________
2.5 4 2.00
2.5 0.5
6.25 4.0
Excavate for foundation trench in ordinary soil Reinforced concrete grade C-25 concrete cast into
to a depth of 60cm. starting from reduced formworks and vibrated around rod reinforcement
ground level. bars.
2 4 0.4 a) For 80x80 mm post
2 0.30
0.30 1.20 0.30 0.14
Selected granular material back fill, around 10cm thick c-15 concrete floor slab
massonry,stare and ramp.
2.00 2.00
2 2.00 4.00
0.25 1.00 4 METAL WORK
A. ALUMININUM WORK
Supply and lay 25cm thick basaltic or equivalent Supply and fix aluminum window and door.
stone hard core well rolled and consolidated with Frame manufactured from tubular frame,
crushed stone. Alcho 5 profile or equivalent 2mm thick ,
silcant and panel wall according to the
2
drawing.
2 4 1.85
4 1.85
2 MASONRY WORK 13.69
cartaway the excavated material to a distance Supply and fix pvc ceiling
5km
1.8 2.00
2.4 2.00 4.00
4.32 B. STEEI STRUCTURE WORK
2 MASONRY WORK Supply and construct RHS for doors and Roof
truss according to the detail drawing design
attached to this BOQ.price shall include
welding, and other necessary work to fulfill
the job.
4 2
2
16.00
Supply & fix 1mm thick lamera or
metal sheet Price shall include
welding and other necessary civil
works.
1 2
2
4.00
5. PAINTING WORK
Supply and apply one coat of antirust and
two coats of metal paint to metal
surface,metal, RHS,decorative metal
panel, louver and other metal
surface .Price shall include one coat of
primer and all other necessary civil work
to fulfill the job.
4 2
2
16
6 FINISHING WORK
Apply cement screed in concrete surface .
Price shall include pre-cleaning and
preparation of the surface.
2
2
4
electrical
light point
1 1.00
one way switch
1 1.00
socket out let
1 1.00
1.3 cartaway the excavated material to a distance 5km m3 12.075 239.93 2897.15
sum 38161.13
2.0 masonry work
50cm thick trachitic or equivalent stone masonry foundation wall below
2.1 m3 2.63 4,809.74 12625.57
NGL.bedded and joined in cement mortar
50cm thick trachitic or equivalent stone masonry foundation wall Above
4,809.74 12625.57
2.2 NGL.bedded and joined in cement mortar m3 2.63
sum 25251.14
3.concrete work
reinforced concrete in c-25 with minimum cement
content of 360kg/m3 filled and vibrated into form
work and around rienforcement bar. Form work and
reinforcement bar measured separatly.
3.1 In 15 cm ground slab m3 6.04 10874.52 65654.94
20mm styrofoam filler for expansion joint between
3.2 middle of slab( two direction) ml 9.00 120.04 1080.33
provide cut and fix in position plywood
metalformwork or equivalent formwork 0.00
3.3 In 15 cm ground slab m2 2.25 872.88 1963.97
reinforcement steel bar according to the structural
drawing. Price shall include cutting bending and
placing in position.
3.4 dia 8mm kg 215.47 159.89 34452.85
sum 103152.09
Take off sheet
Project:- wereda 09 site Consultant:-_________________
Typology:-G+0 garbage storage Contractor:-_______________
Take off sheet No.: Fence Site Name:-_________________
2 2
5.75 23.00 m2
supply and fix 20x20mm 1.5mm thick wire mesh wall
welded on the frame above the shutter door as shown on.
Price includes washer self screew naails and all th
necessary works and material to fullfill the job.
2 1.6
5.75 18.40
50*50*3mm ( horizontal support for shutter door)
1 4.31 conversion factor
10.40 length
49.57
2.metal work
supply and fix electrically operate roller shutter door made
from galvanized steel. Includes 3phase moter per wired
with a 5 pin 16 amp CE plugg and 3 buttn low voltage
slave station. fitted with galvanized stel post for fast
fitment to temporary building.shall be built upon mrtal
frames.
supply and fix steel roof structures as shown in the detail structural drawing price
4.1 shall include J BOLT, WASHER two coats of anti rust and all necessary works
c. RHS 30X30X3mm vertical and diagonal rhs kg 347.23 347.36 120613.81
Total carried to summary 120613.8128
Total carried Summary 157,167.94
FENCE
2.0 concrete work
2.1 50mm thick lean concrete c-5 with minimum cement of 150kg/m3 under
m3
b) footing pad m3 5.76 387.73 2233.32
reinforced concrete in c-25 360kg cement/m3 filled in to formworks and
vibrated around rod reinforcement
steel abd formworks measured separately 0.00
a) footing pads m2 1.44 10558.71 15204.54
b) foundation columns m2 0.25 10953.98 2738.50
d) columns m2 3.33 11,365.08 37845.72
ditto but c-15 mass concrete 0.00
2.3 provide cut and fix in position sawn zigba formworks to 0.00
a) footing pads 845.06 4056.29
m2 4.8
b) foundation columns 845.06 3380.24
m2 4.00
d) columns 845.06 36337.58
m2 43.00
2.4 steel reinforcement according to drawing. Price includes cutting bending
0.00
placing in posion and tyres wires.
b) Dia 10mm Deformed kg 87.46 182.65 15974.57
Total carried Summary 117770.7556
4. BLOCK WORK
Supply and construct class-C 200X200X400mm HCB wall bedded in 167089.06
4.1 cementsand mortar mix ratio (1:3) both sides left for plastering. m2 145.9 1145.23
Total carried Summary 167089.057
supply and fix 1mm thick metal sheet two sides open door for main gate
assembeled to sizes and shapes of the door schedule according the
detailed drawing. Until price include RHS grill internal part of the door is
fix anchor bolts quality cylinderical lock. door stoppers and other
necessary accessories for completing the work. fence well all as shown
on the detail drawings applt two coats of antirust paint. price includes rhs
grill anchor bold and cleaning wire brushing and finally two coats of anti-
5.1 rust paint other necessary accesseries for completing the work.
supply and fix EGA 500,04 prepainted sheet roofing including washers and roof
ridge cover price shall include washers roofing nails and all the necessary works
and materials to fulfill the job roof measured in horizontal projection.
1.1 m2 4.65 2010.9 9350.685
supply and fix PVC ceiling fixed on 4*5 cm ceiling batten. Price shall include all
accessoried or equivalent material complete with all hanging and fixing
1.2 accessories. m2 3.02 1440.9 4351.518
1.3 G-28 roof ridge cover with devt length 33cm ml 6.2 787.4 4881.88
........... 18,584.08
2.metal work
supply and fix metal doors and windows (glazing measurd separately) made of
38mm thick LTZ steel profile frames and 0.8mm thick sheet metal as per the
drawing. Price include best quality type of sylenderical door lock and one coat
anti rust with two coatsof synthetic enamel paint.
windows
a) w1 size 71x110cm no 2 3717.66 7435.32
b) w2 size x 110cm no 1 2775.16 2775.16
Doors
a) D1 size 74x210cm no 1 9125.85 9125.85
supply and fix cated galvinized EGA 300*0.4mm thick prepainted wall cover
fixed to RHS posts. Price shall include one coat antirust with two coats of
synthetic enamel paint ,welding bolta with nuts and fishers as shown in the
2.2 drawing and all necessary materials and works to complete the job. m2 17.55 1797.24 31541.562
supply and fix 6mm thick metal sheet for the slab as per the drawingprice shall
2.3 include all the necessary works. m2 3.02 15069.53 45509.9806
supply and fix 3mm thicknon slippery metal sheet for stair thread. Price shall
2.4 include all the necessary work. m2 3.48 7534.76 26220.9648
Total Carried to summary 122,608.84
3.Glazing
supply and fix 4mm thick clear glass to doors with proper sticking putty and
3.1 screew placed in metal frames price shall include all necessary works m2 2.31 1797.6 4152.456
Total Carried to summary 4,152.46
4.steel Treucture
supply and fix steel structures as shown in the detail structural drawing price
shall include J-BOLT washer two coats of anti rust and all necessary works.
4.1
RHS 30*30*3MM TRUSS kg 112.29 347.36 39005.0544
RHS 30*30*3MM STRUTS kg 6.87 347.36 2386.3632
RHS 20*20*2MM PURLIN kg 10.56 347.36 3668.1216
RHS POST 60*60*3.5MM kg 132.67 328.47 43578.1149
RHS POST 60*60*3MM kg 294.43 328.47 96711.4221
RHS POST 80*80*35MM kg 89.43 328.47 29375.0721
RHS POST 40*40*3MM kg 26.37 328.47 8661.7539
RHS 30*30*3MM kg 69.2 328.47 22730.124
RHS 100*100*3MM kg 267.01 328.47 87704.7747
Total Carried to summary 333820.8009
5.carpentery work
supply and fix 8mm thick chipwood to internal wall price shal include all
5.1 necessary eucalyptus 7*5 batten and nail placed in metal sheet wall m2 17.55 3272.7942 57437.53821
Total Carried to summary 57,437.54
1.electrical work
1.1 light points
light point fed through PVC insulated conductors 2*2.5sqmm inside pvc
conduilts of 16mm diameter including junction boxes with covers and insulating
a screew cap conectors NO 2 2810.36 5620.72
1.2 extra overlight points
a flush mounting single switch NO 1 519.73 519.73
1.3 lighting fittings and lamps
(specifies or equivalent approved
LED surface mounted 18W 2 1171.71 2343.42
SUM 8,483.87
Total Carried to summary 562,534.94
LESS WORK
1.07 cart away the excess excavated materials to a convenient place of a maximum distance 5km m3 9.55 190.91 1823.19
Total carried to summary 13022.5679
3- CONCRETE WORK
Reinforced concrete quality C-25 with minimum cement content of 360kg/m3 filled and
vibrated in to formwork and around reinforced bar. Formwork and rebar measured separately.
WINDOWS
W3=50*60cm pcs 1.00 3969.28 3969.28
DOORS
Total carried to summary 3969.28
6 WOODEN DOOR
6.1 All doors are manufactured from 40mm thick best quality plywood smooth finish flush
wooden door.. All works should be cut and assembled to sizes and shapes of the door
schedule up on the drawing . Unit price includes all specified type of anchor bolts,
cylindrical locks, door stoppers and all other necessary accessories specified or not on the
shop drawing for completing the work all according to window and door schedule
Apply approved Gypsum plaster with a minimum of 3mm over the two coats plastered
concreat surface.work &cost includes preparing the surface,preparing every working
8.3 materials etc.Application shall be done after well cured the plastered surface and as per
instruction of gypsum supplier &Arechitec/enginerr guidance. . Price shall include pre-
cleaning and preparation of the surface.
a) To internal wall surfaces and exposed beams & columns m2 445.00 137.76 61303.20
0.00
Total carried to summary 61303.2
9 PAINTING
Painting work shall include all preparation of surface to receive paints shall be washed and
dried prior to application of paint, and all areas affected by painting shall be washed and
cleaned using paint removers and cleaning at work completion. Apply three coats of durable
and washable quality not discoloration during cleaning and washing ,approved color plastic
emulsion paint.
9.2 Three coats of plastic paint to wall. Internal m2 445.00 129.00 57405.00
Total carried to summary 57405
415,120.28
FENCE
1- EXCAVATION & EARTH WORKS
1.1 Excavation of trench for a depth of 100cm m3 40.00 64.15 2566.00
1.2 excavation for main gate footing pads to a depth of not exceeding 100cm m3 5.76 230.22 1326.07
1.2 backfill around footing pads to depth of noot exceeding 100cm m3 11.08 1406.11 15579.70
1.3 remove surplus excavated material to a distance not exceeding 5km from site
6750.58
m3 35.36 190.91
Total carried Summary 26222.3436
2.0 concrete work
reinforced concrete in c-25 360kg cement/m3 filled in to formworks and
vibrated around rod reinforcement
steel abd formworks measured separately 0.00
ditto but c-15 mass concrete 0.00
2.3 provide cut and fix in position sawn zigba formworks to 0.00
c) gradebeams 845.06 10140.72
m2 12.00
2.4 steel reinforcement according to drawing. Price includes cutting bending
placing in posion and tyres wires.
a) Dia 8mm deformed kg 91.99 180.91 16641.91
c) Dia 12mm Deformed kg 109.9 177 19452.30
Total carried Summary 46234.9309
6. Finishing
45185.50
6.1 supplyand apply thrde coats of plastering wall column and exposed beam m2 81.8 552.39
Total carried Summary 45185.502
7. Painting
apply quartz painting to external wall surface. Price shall include a prime coat 42063.74
of paint and manufactiring instruction m2 81.8 514.2267
Total carried Summary 42063.74406
Total carried Summary 159,706.52
EXCEEDING WORK
Item Description Unit Amount
A. Sub Structure
1 Excavation Earth Work Birr 2,851.88
Sum A 2,851.88
B. Super structure
1 Concrete work Birr 21,166.29
2 Elevation wall Work Birr 14,559.78
3 Steel Structure Work Birr 140,467.22
7 Flooring Work Birr 29,061.68
8 Finishing Work Birr 124,724.14
9 Painting Work Birr 117,812.71
Sum B 447,791.81
Total Sum A+B 450,643.69
Item
Description UNIT Cont. Qty RATE Amount
No
A - SUB STRUCTURE
1.EXCAVATION & EARTH WORK
1.02 Bulk excavation over the site to reduce level up to a depth not exceeding 50cm m3 14.01 203.56 2851.88
Total carried to summary 2851.8756
B - SUPER STRUCTURE
1.CONCRETE WORK
1.09 dia. 14mm deformed bar Kg 84.38 175.71 14826.41
1.10 dia. 16mm deformed bar Kg 35.38 179.20 6339.88
Total carried to summary 21166.29076
2. Elevation wall
2.2 Ditto as item 2.1 above but 150mm thick m2 14.83 982.11 14559.78
Total carried to summary 14559.78075
4.STEEL
supply andSTRUCTURAL WORKSas shown in the detail structural drawing price shall
fix steel roof structures
4.1 include J BOLT, WASHER two coats of anti rust and all necessary works
upper and lower vertical and diagonal rhs truss
a.RHS 70X50X3mm purlin kg 31.0816 347.36 10796.50
f. RHS 60x60x3mm rafter and horizontal member kg 28.42 347.36 9871.97
g.RHS 40*40*3mm vertical and diagonal rhs kg 318.56 347.36 110656.39
h. Angel iron 50*50*5mm for ditch ml 6.64 1376.86 9142.35
Total carried to summary 140467.217216
7 FLOORING
7.1 5cm thick Cement sand screed smoothly finished flooring in mortar mix (1:3). m2 40.75 713.24 29061.68
Total carried to summary 29061.67704
8 FINISHING
8.2 Apply three coats of plastering in cement mortar (1:3). Price shall include edge work to
windows & doors, pre-cleaning and preparation of the surface.
a) To external wall surfaces m2 225.79 552.39 124724.14
Total carried to summary 124724.1381
9 PAINTING
Painting work shall include all preparation of surface to receive paints shall be washed and
dried prior to application of paint, and all areas affected by painting shall be washed and
cleaned using paint removers and cleaning at work completion. Apply three coats of durable
and washable quality not discoloration during cleaning and washing ,approved color plastic
emulsion paint.
9.1 Quartz paint to external wall. m2 225.79 521.78 117812.71
Total carried to summary 117812.7062
Take off sheet
Project:- wereda 09 site
Typology:-G+0 garbage storage
Take off sheet No.: shutter door
TIM DIMN TOTAL Description TIM
1.STEEL STRUCTURAL WORKS
ELEVATION WALL
2.2 Supply and construct 15cm thick H.C.B wall
1 5
3.00 15.00 office
2 2.85
3.00 17.10 changing rooms
1 0.4
2.75 1.10 around door
1 0.30
2.75 0.83 around door
1 1.65
1.20 1.98 around toilet corridor
1 2.05
1.20 2.46 around toilet corridor
4 0.40
2.10 3.36 around toilet door
4 0.40
2.10 3.36 around toilet door
Axis A&C/1-2 -2
2 4.02 L=4.02
2 4.70 L=4.7
H=3.7
3.70 34.78
Axis A&C/3-4
2 3.50 L=3.5
H=3.7
3.70 25.90
Axis 1/A-B
1 5.20 L=5.2
1 5.20 L=5.2 0
3.70 19.24 H=3.7
level +4.00to +8.00
Axis A&C/1-2 1
2 4.02 L=4.02
2 4.70
3.60 33.84 H=3.6 1
Axis A&C/3-4
2 3.50 L=3.5 1
3.60 25.20 H=3.6
Axis 1/A-B
1 5.20 L=5.2
TOILET 1
1 3.00 left side
3.20 9.60 2
1 5.00
3.00 15.00 right side
1 13.00 2
3.80 49.40 rear side
1 5.00 2
3.40 17.00 front office
1 8.60
0.40 3.44 front above the beam 2
0 2.20
4.2 0.00 m2 total for 200mm block work 2
2 1
3 6.00
4 0.5
5.50
1.50 16.5 above top tie beam warehouse
Axis A&C/1-2 -2
2 4.02 L=4.02
2 4.70 L=4.7
H=3.7
3.70 34.78
Axis A&C/3-4
2 3.50 L=3.5
H=3.7
3.70 25.90
Axis 1/A-B
1 5.20 L=5.2
1 5.20 L=5.2 0
3.70 19.24 H=3.7
level +4.00to +8.00
Axis A&C/1-2 1
2 4.02 L=4.02
2 4.70
3.60 33.84 H=3.6 1
Axis A&C/3-4
2 3.50 L=3.5 1
3.60 25.20 H=3.6
Axis 1/A-B
1 5.20 L=5.2
TOILET 1
1 3.00 left side
3.20 9.60 2
1 5.00
3.00 15.00 right side
1 13.00 2
3.80 49.40 rear side
1 5.00 2
3.40 17.00 front office
1 8.60
0.40 3.44 front above the beam 2
0 2.20
4.2 0.00 m2 total for 200mm block work 2
2 1
3 6.00
4 0.5
5.50
1.50 16.5 above top tie beam warehouse
axis A and C
13.42
0.30 8.052
13.42
0.1 0
axis 1
11.3
0.3 3.39
11.3
0.10 1.13
axis B
13.42
0.30 4.03
13.42
0.20 2.68
19.28 total external intermediate
top external
axis A and C
14.62
0.30 8.772
14.62
0.1 2.924
axis 1
11.3
0.3 3.39
11.3
0.10 2.26
axis B
14.62
0.30 8.77
14.42 bottom and upper beam
0.20 5.77
axis 4'
11.30
0.3 6.78
11.30
0.2 4.52
43.19 total external for top tie beam
62.47 total for internal beam
439.98 m2 total
214.19 m2 on agreement
225.79 m2 total exceeding
ddt
2
1.80 -3.60 office window
1.20
0.60 -1.44 changing room window
0.5
0.60 -1.20 toilet and shower top window
-6.24 total deduction
m2 total for 200mm block work
-6.24
-6.24 m2 total for external plastering
377.51
axis A and C
13.42
0.30 8.052
13.42
0.1 0
axis 1
11.3
0.3 3.39
11.3
0.10 1.13
axis B
13.42
0.30 4.03
13.42
0.20 2.68
19.28 total external intermediate
top external
axis A and C
14.62
0.30 8.772
14.62
0.1 2.924
axis 1
11.3
0.3 3.39
11.3
0.10 2.26
axis B
14.62
0.30 8.77
14.42 bottom and upper beam
0.20 5.77
axis 4'
11.30
0.3 6.78
11.30
0.2 4.52
43.19 total external for top tie beam
62.47 total for internal beam
439.98 m2 total
214.19 m2 on agreement
225.79 m2 total exceeding
TOTAL
CONVERSION AMOUNT(
B. SUPER-STRUCTURE SHAPE THICKNESS UNIT LENGTH NO OF NO contract amountexceeding
FACTOR KG)
RHS
TRUSS
Struts
40X40 RHS 3 mm 3.49 20.56 1 4 287.0176
Purlin
70X50 RHS 3 mm 5.37 14.62 1 14 1099.1316 1068.05 31.0816
Total Kg carried to takeoff
service quarter
truss
Horizontal Member RHS
60X60 3 mm 5.37 5.6 1 4 120.288
Rafter RHS 0
60X60 3 mm 5.37 5.9 1 4 126.732
Struts RHS 247.02 218.6 28.42
40X40 3 mm 3.49 6.84 1 4 95.4864
Purlin RHS 0
40X40 3 mm 3.49 13 1 5 226.85
C2 14 9 10 5.40
8 9 28 1.10 277.20
C2 14 9 10 4.70
8 9 28 1.10 277.20
____________
__________
129.60
486.00
112.80
423.00
96.00
1130.33 347.29
84.38 35.38
------ R. ENGINEER :- ----------------------------