The document outlines a detailed schedule of beams, including dimensions, bar specifications, and spacing for reinforcement. It specifies the use of lateral ties and various bar sizes for different sections of the beams. Additionally, it includes information on truss framing and material requirements for construction.

Uploaded by

Vin Jugo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

GFGSDF

The document outlines a detailed schedule of beams, including dimensions, bar specifications, and spacing for reinforcement. It specifies the use of lateral ties and various bar sizes for different sections of the beams. Additionally, it includes information on truss framing and material requirements for construction.

Uploaded by

Vin Jugo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE OF BEAMS

620 8422
600 600

WITH 10 MM LATERAL TIES


B7 - 250 X 450 MM 600 600

4 @ .05, 4 @ .10, 3 @ .15,


600 600 600

ON CENTER SPACING
600 600 600
1 2 3 3' 4 4' 5

THE REST @ .20 M


@ SUPPORT @ MIDSPAN 600 600 600
250 250

0.30

200
A A
4 - 20 mm Ø NOTE: 2 - 20 mm Ø A A

475
10000 A A
TOP BARS TOP BARS A A A

650
TO DOUBLE
B B A A
LAYER TOP B B

209
B

1550
2800 1900 3300 700 1300 B B B B B B B A A
B B

450

450
BAR 4-16mm Ø B B

105
B B B B B B
B A
A A A A A A A A A A A A

3 - 20 mm Ø 3 - 20 mm Ø

600

300
BOT BARS BOT BARS RB RB RB RB RB RB

3
2
1
▼PROPERTY LINE ▼PROPERTY LINE

WITH 10 MM LATERAL TIES


B8 - 250 X 450 MM

▲PROPERTY LINE
▼PROPERTY LINE
4 @ .05, 4 @ .10, 3 @ .15,

1300

1300
ON CENTER SPACING
THE REST @ .20 M
@ SUPPORT @ MIDSPAN 170 750 750 750 750 750 750 750 750 750 750 750
250 250
0.30

P A R A P E T W A L L 8419 200

700

700
5 - 20 mm Ø NOTE: 2 - 20 mm Ø TRUSS 02
TOP BARS TO DOUBLE TOP BARS A 200 8619 200

L
LAYER TOP
450

450

L
BAR 5-20mm Ø

TRUSS 01

A
B TRUSS 02

W
3 - 20 mm Ø 3 - 20 mm Ø

3320
BOT BARS BOT BARS

3320

T
E
WITH 10 MM LATERAL TIES
B9 - 250 X 450 MM

P
4 @ .05, 4 @ .10, 3 @ .15,

ON CENTER SPACING
TRUSS 02

A
8072

THE REST @ .20 M


@ SUPPORT @ MIDSPAN 620 600

R
600 600 600 600
250 250
C 600

A
0.30

600 600 600 600 600

800
P
600

L
6 - 20 mm Ø NOTE: 2 - 20 mm Ø 250

L
TOP BARS TOP BARS

200
TO DOUBLE
TRUSS 01

A
LAYER TOP
D

PARAPET WALL
A
450

450

BAR 6-20mm Ø A

W
A

475
A
0.30

3400
B A

650
B B B A A

2270
A B B B B B A

209
1550
B B B A
3 - 20 mm Ø 3 - 20 mm Ø

T
B B A

15000

15000
B B B

105
B B B B

E
BOT BARS BOT BARS A
D' A A A A A A A A A A A A

P
TRUSS 01

600

300
A
RB0 - 200 X 250 MM WITH 10 MM LATERAL TIES RB RB RB RB RB RB

340
4 @ .05, 4 @ .10, 3 @ .15,

R
ON CENTER SPACING
E

A
@ SUPPORT @ MIDSPAN THE REST @ .20 M

L
P

L
200 200

A
TRUSS 03 170 750 750 750 750 750 750 750 750 750 750 400

W
2 - 12 mm Ø 2 - 12 mm Ø

3280

3280
TOP BARS TOP BARS 8069 200

T
250

250

E
200 8269 200

P
TRUSS 03
2 - 12 mm Ø 2 - 12 mm Ø

A
BOT BARS BOT BARS
TRUSS 02

R
F

A
WITH 10 MM LATERAL TIES

P
RB1 - 200 X 300 MM

990
990
4 @ .05, 4 @ .10, 3 @ .15,

TRUSS 03
ON CENTER SPACING

▲PROPERTY LINE
▼PROPERTY LINE
THE REST @ .20 M

P A R A P E T W A L L
@ SUPPORT @ MIDSPAN
200 200
7102
2010

2010
2 - 16 mm Ø 2 - 16 mm Ø 620 600 600 600
TOP BARS TOP BARS 600 600 600 600 600 600 600 480
300

300

200
4
▲PROPERTY LINE
5

2 - 16 mm Ø 2 - 16 mm Ø A
A A

475
BOT BARS BOT BARS A
A A A

650
B A A
1350 950 B B B B A A

235
1550
B B B B B B B B

135
B B B B B B B B A
WITH 10 MM LATERAL TIES

RB2 - 250 X 300 MM 2800 1520 2480 900 2300


4 @ .05, 4 @ .10, 3 @ .15,

A A A A A A A A A A A
ON CENTER SPACING
THE REST @ .20 M

@ SUPPORT @ MIDSPAN 10000

600

300
250 250
RB RB RB RB RB
3 - 16 mm Ø 2 - 16 mm Ø
TOP BARS TOP BARS
1 ROOF TRUSS FRAMING PLAN 170 750 750 750 750 750 750 750 750 750 180 200
300

300

7099 200
2 - 16 mm Ø 2 - 16 mm Ø
BOT BARS BOT BARS 200 7299 200
WITH 10 MM LATERAL TIES

RB3 - 250 X 350 MM


TRUS S 03
4 @ .05, 4 @ .10, 3 @ .15,

D REFER TO SCHE.
ON CENTER SPACING
THE REST @ .20 M

@ SUPPORT @ MIDSPAN OF COLUMN


with 10mm Ø lateral ties
250 250
3@ 0.05, 4@ 0.10, 5@ 0.15, BEAM 12Ø TOP. BARS @
B
L

3 - 16 mm Ø 2 - 16 mm Ø REST @ 0.20 M ON 0.114 M. O.C.


CENTER SPACINGS 10Ø @ 0.20 M. O.C. 75 x 50 x 20 x 1.2t
TOP BARS TOP BARS
2ND FLR. LN. C-PURLINS 75 x 50 x 20 x 1.2t C-PURLINS
350

350

REFERS TO
STEEL ANGLE BAR
(SEE SCHEDULE STEEL ANGLE BAR
2 - 16 mm Ø 2 - 16 mm Ø OF FOOTINGS) 10Ø @ 0.20 M. O.C.
W 1L - 2"x 2"x14"
BOT BARS BOT BARS ANGLE BAR
TOP CORDS
PLAN
1 - 12mm.Ø NOSING BAR

1 12" THK WOOD PLANKS

LANDING 1L- 2"x 2"x41"


REFER TO SCHE. 12mmØ TOP BAR 1L - 2"X2"X14"
OF COLUMN KING POST ANGLE BAR
100mm 1L - 121"x121"x41"

VERT BARS 10 mmØ


w/ 10mm Ø lateral ties
3@ 0.05, 4@ 0.10, 5@ 0.15,
REST @ 0.20 M ON
CONCRETE SLAB
100MM GRAVEL FILL
5 TRUSS BLOW-UP DETAILS TOP CORDS
ANGLE BAR
VERT. & DIAGONAL
@ 0.60 M. O.C VERT BARS 10 mmØ
12Ø BOT. BARS @ 0.144 M. O.C. WEB MEMBERS
CENTER SPACINGS FFL
6" CHB @ 0.60 M. O.C
GRAVEL FILL HOR. BARS 4" CHB
10mmØ @ EVERY GRAVEL FILL HOR. BARS 10 mmØ @ ELEVATION 1L - 2"X2"X41"
FFL
3 LAYERS OF CHB
3 - 12 mm MAIN BARS
EVERY 3 LAYERS OF CHB NGL
SCHEDULE TRUSS DIAGRAM 1L - 121"x121"x41"
KING POST
@ 0.30 M. O.C. FFL 3 - 12 mm MAIN BARS
NGL ANGLE BAR
VERIFY

@ 0.30 M. O.C.
NGL DESCRIPTION DESIGNATION VERT. & DIAGONAL
WEB MEMBERS
FOR EXTERIOR WALL
REFER TO
(SEE SCHEDULE
TOP & BOTTOM CHORD 1L - 2" x2" x 41" ANGLE BAR 1L - 2"x2"x41"
10mm.Ø @ 0.20 M. O.C.
OF FOOTINGS) CHAIR BARS ANGLE BAR
1L - 1 21 " x 1 21 " x 41" ANGLE BAR
t

WEB MEMBER BOTTOM CORDS


SPOT DETAIL-3 VERT. RENF. 4-16mmØ
FOR INTERIOR WALL

WF-2 VERIFY 12mmØ BOTTOM BAR 0.50

0.20
WF-3
TYPICAL DETAIL OF
3 COLUMN-FOOTING

0.75

0.35
TYPICAL DETAIL OF 4 STAIR STRUCTURAL DETAIL 6 TRUSS DIAGRAM & DETAIL CONNECTION

0.20
2 WALL FOOTING NOTE:
0.50

LC - 75 x 50 x 20 x 1.2MM THK
PLEASE SEE THE SCHEDULE
PURLIN
OF COLUMN & FOOTING
CIVIL / STRUCTURAL ENGINEER ARCHITECT PROJECT OWNER : PROJECT TITLE & LOCATION : DESIGNED BY : DATE : REVISIONS: SHEET CONTENTS : SHEET

MARK: REVISION/ADDENDUM: DATE: DRAWN: APPROVED:

NOVILLOS DESIGN & BUILD A PROPOSED TWO-STOREY


DRAWN BY : DATE :
S-03
3rd Floor Jaro Building, Springville West, Molino III, Bacoor City, Cavite SPS. EUGI NIL A. SAPANGHILA RESIDENTIAL BUILDING
EMAIL: cavite@novconph.com
Tel. No.: (046) 573 6725
PRC NO.: DATE ISSUED : PRC NO. DATE ISSUED :
& SHANE Q. SAPANGHILA
AS SHOWN
08 12
Cp No.: 0977 099 0099 CHECKED BY : DATE :
PTR NO.: EXP DATE : PTR NO. EXP DATE :
BLK-13 LOT-13, PACIFIC PARKPLACE VILLAGE
ISSUED AT : TIN : ISSUED AT : TIN : BRGY. PALIPARAN 1 , CITY OF DASMARINAS, CAVITE DRAWING

You might also like