Types Network Topologies
• Ring Topology: In the upper left, PCs are connected in a ring, where each
PC is connected to exactly two other PCs, forming a circular pathway for
data.
• Bus Topology: In the upper right, PCs are connected to a single cable or
"bus" with terminators at each end.
• Hybrid Topology: A central "Hybrid" bus seems to act as a backbone,
connecting the other topologies.
• Star Topology: In the lower left, PCs are connected to a central hub.
• Mesh Topology: In the lower right, PCs are interconnected with multiple
redundant connections, providing high reliability.
Disaster Recovery Plan (Tabled and Bordered)
R.N Expected Types/Categor Recovery Plan/Action
. Disaster y of Disaster
1 Hardware Technical/Equi 1. Redundant Hardware: Utilize backup
failure Switch) pment Failure switches (diagram). Automated failover.
2. Spare Equipment: Keep spare
modems/switches on hand.
3. Monitoring Tools: Use network monitoring
software.
2 Cybersecurity Security 1. Antivirus: Endpoint protection.
Threat Breach 2. Regular Updates: Patch software.
(Malware, 3. Backup Data: Daily offsite backups.
Ransomware) 4. Incident Response: Documented plan.
3 Power Utility Failure 1. UPS: Install UPS for servers, switches, and
Outage/Electri routers.
cal Surge 2. Backup Generators: Deploy generator for
extended outages.
3. Surge Protectors: Use surge protectors.
4. Scheduled Maintenance: Inspect power
equipment.
Task 2: Project Phase and Activities
Phases Activities to be Performed Durati Responsible Body
on
Phase 1: - Assess network requirements. 1 IT Manager/Network
Planning - Identify hardware and software needs. Week Architect
- Design network topology.
Phase 2: - Purchase required hardware (switches, 2 Procurement Team
Procurement workstations, etc.). Weeks
- Procure software licenses.
Phase 3: - Install cabling and networking devices 1 IT Technicians
Installation ( switches). Weeks
- Set up DMZ and VLAN configurations.
Phase 4: - Configure switches. 1 Network Engineers
Configuration - Set up access points. Week
- Configure workstations.
Phase 5: - Test network connectivity and device 1 IT Support Team
Testing functionality. Week
- Test failover mechanisms (disaster
recovery).
Phase 6: - Train employees on using 1 IT Trainers
Training workstations, telephony systems, and Week
software tools.
Phase 7: - Document network configuration, 3 Days IT
Documentation disaster recovery procedures, and Manager/Document
maintenance schedules. ation Specialist
Task 1: Hardware Requirements
Task 1: Hardware Requirements
No Item Specification Qua Unit Total
ntity Price Price
(ETB) (ETB)
telephon Wire phone 2 1500 3000
e
wifi Tele wifi routers 2 3000 6000
1 Core Layer-3 Managed Switch 1 20,00 20,00
Switch,h (24-Port Gigabit) 0 0
ub
2 Workstati Desktop, PCs (Intel 15+1 25,00 400,0
ons i3/Ryzen 3, 8GB RAM, 0 00
SSD)
3 Network Cat6 Ethernet Cable ~200 50 ~10,0
Cables (per meter) mete 00
rs
4 Patch Patch Panel for 2 3,500 7,000
Panel organizing cables
5 RJ45 RJ45 Connectors for ~50 ~20 ~1,00
Keystone patch panel and cable 0
Jack ends
6 Rack Network Rack Cabinet 1 30,00 30,00
Cabinet for housing switches 0 0
and servers
7 UPS Uninterruptible
Power Supply (UPS) 2
15.00-20+*
Total 477;0
00
Share
Export
Rewrite
Task 4: Software Requirements
No Item Specification Qua Unit Total
ntity Price Price
(ETB) (ETB)
1 Operating Windows 10/11 Pro (Workstations) 15 10,000 90,000
Systems
2 Antivirus Endpoint Protection (e.g., 8+1 1,000 9,000
Software Bitdefender, Kaspersky)
3 Office Microsoft Office 365 Business 8 5,000 40,000
Productivity Standard OR LibreOffice (Free) (yearly) (yearly)
Suite
4
5
6 Network Open Source (e.g., Zabbix, Nagios) 1 Free/Vari Free/Vari
Monitoring OR Paid Solution able able
Tool
7 Backup Backup and Recovery Software 1 Variable Variable
Software (e.g., Veeam, Acronis) OR Cloud
Backup Service
9 POS (Point of Restaurant POS System (e.g., local 1 Variable Variable
Sale) Ethiopian POS)
Total Manpower Requirements
R.N. Manpower/Role Quanti Estimated Salary (ETB per Month)
ty
1 IT Manager 1 20,000 - 30,000
2 Network Engineer 1 15,000 - 25,000
3 IT Support Technician/Help Desk 1 8,000 - 15,000
Total (Monthly): 43,000 - 70,000 Birr
Name ID
Fikert yirga ---------------------400674-16
Astewaye mekedmu----------- 484544-16
Frehiwote esayas--------------- 714387-16