DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL-PKG6-
MSRA-CVL-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
DMT-80256-GSL- G6-
MSRA- L-0001-00
Approval of Method Prior to start the Engineer's/ Employer's/ Approved Method Documents
1.1 Approved Submittal with Code A or B H R R-A N/A
Statement activity Authority Approval Statement Verification
Prior to stan the Engineer's/ Employer's/ Approved Shop Drawing Document
1.2 Approval of Shop Drawing Approved Submittal with Code A or B H R R-A N/A
activity Authority Approval Form Verification
Prior to start the Engineer's/ Employer's/ Approved Material Document
1.3 Material Approval Approved Submittal with Code A or B H R R-A N/A
activity Authority Approval Submittal Form Verification
Construction of Pump Room
Prior to start the Co-ordinates mentioned
2.1 Setting out Shop drawings Surveying Report Survey E WIR S N/A
Work in the drawings
Document
Engineer's/ Employer's/
2.2 Material Inspection Request Each delivery As Per standard Specifications MIR Verification & Visual H R R-A N/A
Authority Approval
Inspection
As per approved shop
2.3 Excavation For All trench Works drawings/Method As Per standard Specifications Visual Visual inspection E W/R S N/A
Statement
Foundation preparation & Doc. Review/ Visual
2.4 For All trench Works >95%ofMDD As Per standard Specifications WTR/ lab test reports H H W-A P
compaction inspection
Doc. Review/ Visual
2.5 Placing of blinding Concrete For All trench Works approved shop drawing As Per standard Specifications WTR/ lab test reports H H W-A N/A
inspection
Slump/Temperature /
for every 50 Cum/ Approved Material
2.6 Compreesive strength As Per standard Specifications Visual/ Test Form Visual inspection H H W-A P
Specified by Engineer submital
sampling
Reinforcement and Doc. Review/ Visual
2.7 Prior to Concreting approved shop drawing As Per standard Specifications WIR/Visual/ Checklist H R W N/A
Shuttering inspection
Doc. Review/ Visual
2.8 Walls, Column Slabs Each Activity approved shop drawing As Per standard Specifications WIR/Visual/ Checklist H H W-A N/A
inspection
Concrete Surface Doc. Review/ Visual
2.9 Each Activity approved shop drawing As Per standard Specifications WIR/Visual/ Checklist H S W-A N/A
Preparation & repairs inspection
Doc. Review/ Visual
2.10 Water Proofing Membrane Each Activity approved shop drawing As Per standard Specifications WIR/Visual/ Checklist H S W-A N/A
inspection
Test/WIR/Visual/ Doc. Review/ Visual
2.11 Backfilling & Compaction For All trench Works approved shop drawing As Per standard Specifications H H W-A P
Checklist inspection
Construction of Pump Room
Prior to start the Approved Material Approved Material Document
MEP Material Approval Approved Submittal H R R-A N/A
activity submital Submittal Form Verification
Installation of MEP
3.2 After Installaion approved shop drawing Approved Shop Drawing /Specs. WIR/ Checklist Final Inspection W W W-A N/A
Equipment
3.3 Testing and Commissioning After Installaion approved shop drawing Approved Shop Drawing /Specs. WIR/ Checklist Final Inspection W W W-A N/A