Sadaqat Limited
IE DEPARTMENT/PROJECT ENGINEERING
17-11-2020 Master Plan Layout Knitwear 2 nd floor Service Bay (Proposal 1)
Sampling + Machine Yard + Accessory Area
(466'X30')
rinking
Water
Area
Lift
10'-6"
10'-6"
Office
10'X10' (10'X8')
Emergency
Sewing accessory store Exit
20'X45' 15'-0"
Preventive RACKS 04
Racks 36 MACHINE YARD
RACKS 02
Maintenance Cutting
Area (19'X102') Table 24 Machine Q.C TABLE
G.G.T Office
6'-0"
Washing Area Office 12'X12'
Up
21'X19' Iron Press
12'X15'
21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0"
Assistant Electrical G.M.
MANAGER IE DGM-IE GM Knitwear Manager Utility Civil Engr. Chief Engr. Director/Operations Director/ CEO
Engr. IE Engr. Compliance & Sustainability