0% found this document useful (0 votes)
56 views3 pages

RHK0129 013927M

The document provides instructions for knitting a New Aran Sweater, designed by Julie Farmer, suitable for experienced knitters. It includes gauge information, special abbreviations, and detailed directions for constructing the sweater in various sizes, along with charts for cable patterns. The document also outlines the materials needed and finishing techniques for the sweater.

Uploaded by

babinopile
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views3 pages

RHK0129 013927M

The document provides instructions for knitting a New Aran Sweater, designed by Julie Farmer, suitable for experienced knitters. It includes gauge information, special abbreviations, and detailed directions for constructing the sweater in various sizes, along with charts for cable patterns. The document also outlines the materials needed and finishing techniques for the sweater.

Uploaded by

babinopile
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

KNIT I SKILL LEVEL : EXPERIENCED

NEW ARAN SWEATER | KNIT SHOP KIT

GAUGE: 24 sts = 4”; 28 rows = 4” with larger needle


over cable panel. CHECK YOUR GAUGE. Use any size
needles to obtain the gauge.

NOTES
Each Chart has a Wrong Side set up row at the start that will
only be used once. Repeat Chart rows from lines A to B.

When following a chart read odd numbered rows from right


to left for a Right Side row and even numbered rows from
left to right for a Wrong Side row. It is helpful to place stitch
markers between cable panels to let you know when one
chart ends and the next begins.

SPECIAL ABBREVIATIONS
RTPC (Right Purl Cable) = Slip next st onto cable needle
and hold to back, k2, purl 1 from cable needle.

LFPC (Left Purl Cable) = Slip next 2 sts onto cable


needle and hold to front, p1, k2 from cable needle.

4LFC (4 st Left Cable) = Slip next 2 sts onto cable needle


and hold to front, k2, k2 from cable needle.

4RTC (4 st Right Cable) = Slip next 2 sts onto cable


needle and hold to back, k2, k2 from cable needle.

4RTPC (4 st Right Purl Cable) = Slip next st onto cable


needle and hold to back, k3, p1 from cable needle.

New Aran Sweater 4LFPC (4 st Left Purl Cable) = Slip next 3 sts onto cable
needle and hold to front, p1, k3 from cable needle

Designed by Julie Farmer. 5RTPC (5 st Right Purl Cable) = Slip next 2 sts onto
cable needle and hold to back, k3, p2 from cable needle.
Directions are for size Small; changes for sizes
Medium, Large, 1X and 2X are in parentheses. 5LFPC (5 st Left Purl Cable) = Slip next 3 sts onto cable
needle and hold to front, p2, k3 from cable needle.
To Fit Bust: 32 (36, 40, 44, 48)”.
Finished Bust Measurement: 36 (40, 44, 47, 50)”. T5LFC (Twist 5 Left Cable) = Slip next 2 sts onto cable
needle and hold to front, k2, p1, then k2 from cable needle.
RED HEART® “Eco-Ways™”: 6 (7, 7, 8, 8) balls 3533
Misty Violet.
SWEATER
Circular Knitting Needles: 4.5mm [US 7] – 24” and Back
3.75mm [US 5] – 16”. With larger needle cast on 124 (134, 144, 154, 164) sts.
Yarn needle, stitch holders, stitch markers, cable needle. Do not join. Work 3 rows of k1, p1 ribbing.
Next Row (Wrong Side): P2, [k3, p2] 3 (4, 5, 6, 7) times,
work set up row (read from left to right) of Chart 1, Chart 2,
Chart 3, Chart 2, Chart 1, p2, [k3, p2] 3 (4, 5, 6, 7) times.

©2010 Coats & Clark For more ideas & inspiration —


P.O. Box 12229 www.redheart.com www.coatsandclark.com
RHK0129-013927M Greenville, SC 29612-0229
| LAST UPDATED: AUGUST 2019 www.crochettoday.com NEW ARAN SWEATER | KNIT 1 of 3
KNIT I SKILL LEVEL : INTERMEDIATE

NEW ARAN SWEATER | KNIT


WR2162 CABLE SWEATER
SCHEMATIC loosely. Sew remaining raglan and neckband seam.
Next Row (Right Side): K2, [p3, k2] 3 (4, 5, 6, 7) times,
FRONT
work Row 1 of Chart 1, Chart 2, Chart 3, Chart 2, Chart 1, AND BACK
k2, [p3, k2] 3 (4, 5, 6, 7) times. Sew sleeve seams, reversing seam for cuff turn-back. Sew
Continue in this manner, working correct row of patterns, side seams. Turn up cuffs and tack in place.
until 15 (15.5, 16, 16, 16.5)” from beginning AND AT THE
SAME TIME shape sides by dec 1 st each side every 10 RED HEART® “Eco-Ways®”
(10, 14, 14, 14)th row 8 (7, 6, 6, 6) times – 108 (120, 132, Art. E750 available in 4 oz (113 g),
142, 152) sts. Work even until 15 (15.5, 16, 16, 16.5)” from 186 yd (170 m) balls.
beginning, end Wrong Side row.
ABBREVIATIONS: dec = decrease; inc = increase;
Shape Raglans: Keeping continuity of patterns, bind off K = knit; mm = millimeters; P = Purl; st(s) = stitch(es);
12 sts at beginning of next 2 rows – 84 (96, 108, 118, 128) St st = Stockinette stitch; [ ] = work directions in brackets
sts. Dec 1 st each side as follows: the number of times specified; * or ** = repeat whatever
S (M, L): every Right Side row 10 (24, 35) times, then follows the * or ** as indicated.
every 3rd row 14 (6, 0) times.
(1X, 2X): every row (20, 26) times, then every 3rdWR2162
row (18, CABLE SWEATER 18 (20, 22, 23½, 25)”
17) times.
Bind off remaining 36 (36, 38, 42, 42) sts. SCHEMATIC SLEEVE 6 (6, 6½, 7, 7)”

15 (15½, 16, 16, 16½)” 9 (9½, 10, 10½, 11)”


Front
Work same as for back including all shaping AND AT THE
SAME TIME when piece measures 19 (19.5, 20.5, 21.5,
22)” end Wrong Side row to begin neck shaping. 24 (25, 26,26½, 27½)”

Divide for Neck: Work to center 12 (12, 14, 16, 16) sts,
attach new ball of yarn, bind off those center sts, complete
FRONT
row. Working both sides at the same time and continuing AND
raglan shaping, bind off 2 sts at each neck edge twice, BACK
then dec 1 st at each neck edge every other row 5 (5, 5, 6,
6) times. Continue shaping as for back until 3 sts remain.
Bind off.

Sleeves
With larger needle cast on 80 (80, 80, 102, 102) sts. Work
3 rows in k1, p1 ribbing inc 1 (1, 1, 0, 0) st on last row – 20½ (22, 24, 25½, 27)”
81 (81, 81, 102, 102) sts. Follow Chart 4, noting that all
15 (15, 16, 16½, 17)” 9 (9½, 10, 10½, 11)”

WRONG SIDE rows begin at C and all RIGHT SIDE rows


end at C, until 15 (15, 16, 16.5, 17)” from beginning, end
WS row.
Shape Raglans: Keeping continuity of Chart, bind off 9 (9,
9, 12, 12) sts at beginning of next 2 rows – 63 (63, 63, 78,
78) sts. Dec 1 st each side every 3rd row 16 (18, 23, 14,
21) times, then every RIGHT SIDE row 7 (5, 0, 15, 6) times
– 17 (17, 17, 20, 24) sts. Bind off.
SLEEVE
FINISHING
Neckband
Sew raglans leaving left back raglan open. With right side
facing and smaller needle, starting at back neck pick up
and k100 (100, 108, 120, 138) sts evenly around neck. Do
not join. Knit every row until neckband measures 1”. Bind
13½ (13½, 13½, 17, 17)”

©2010 Coats & Clark For more ideas & inspiration —


P.O. Box 12229
RHK0129-013927M | LAST UPDATED: AUGUST 2019 www.redheart.com www.coatsandclark.com
NEW ARAN SWEATER | KNIT 2 of 3
Greenville, SC 29612-0229
www.crochettoday.com
KNIT I SKILL LEVEL : EXPERIENCED

NEW ARAN SWEATER | KNIT

B
32
31
30
29
28
27
26
25
24
B 23
12 22
11 21
10 20
9 19
8 18
7 17
6 16
5 15
4 14
3 13
2 12
1 11
A
10
CHART 1 9
8
7
6
5
4
3
2
1
A
CHART 3

B B
12
11 12 11
10
9 10 9
8
7 8 7
6
5 6 5
4
3 4 3
2
1 2 1
A A
CHART 2 CHART 4
C

CHART KEY
= K on RS, P on WS
= P on RS, K on WS
= R T P C (R ight P url C able)= S lip next st onto cable needle and hold to back, k2, purl 1 from cable needle.
= L F P C (L eft P url C able)= S lip next 2 sts onto cable needle and hold to front, p1, k2 from cable needle.
= 4R T C (4 s t R ight C able)= S lip next 2 sts onto cable needle and hold to back, k2, k2 from cable needle.
= 4L F C (4 s t L eft C able)= S lip next 2 s ts onto cable needle and hold to front, k2, k2 from cable needle.
= 4R T P C (4 s t R ight P url C able)= S lip next s t onto cable needle and hold to back, k3, p1 from cable needle.
= 4L F P C (4 s t L eft P url C able)= S lip next 3 s ts onto cable needle and hold to front, p1, k3 from cable needle.
= 5R T P C (5 s t R ight P url C able)= S lip next 2 s ts onto cable needle and hold to back, k3, p2 from cable needle.
= 5L F P C (5 s t L eft P url C able)= S lip next 3 s ts onto cable needle and hold to front, p2, k3 from cable needle.
= T 5L F C (T wis t 5 L eft C able)= S lip next 2 s ts onto cable needle and hold to front, k2, p1, then k2 from cable needle.

RHK0129-013927M | LAST
©2010 UPDATED:
Coats AUGUST 2019
& Clark For more ideas & inspiration —ARAN SWEATER | KNIT
NEW 3 of 3
P.O. Box 12229 www.redheart.com www.coatsandclark.com

You might also like