0% found this document useful (0 votes)
38 views1 page

Estimate Activity Duration

The document outlines the estimation of manpower and productivity rates for installing facade panels. It specifies that a total of 3000 panels are to be installed, with a capacity of 30 panels per day using a tower crane. The calculation for duration involves the number of crews multiplied by the crew rate.

Uploaded by

Walid Elsaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views1 page

Estimate Activity Duration

The document outlines the estimation of manpower and productivity rates for installing facade panels. It specifies that a total of 3000 panels are to be installed, with a capacity of 30 panels per day using a tower crane. The calculation for duration involves the number of crews multiplied by the crew rate.

Uploaded by

Walid Elsaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1

Estimate Manpower / Manpower


Estimate Manpower /
Manpower
Productivity Rates
Productivity Rates

Specify number of resource needed to


execute specific amount of work
- Total facade panels 3000 panel
- Total panels can be installed by tower
crane per Day 30

Quantity
Duration=
Planning Basic Course by Planningengineer.net No. of Crews X Crew Rate