Production Plan Amelia R

The document outlines a detailed production plan for creating The Mira Dress over several weeks, specifying tasks, estimated times, and necessary modifications. It includes steps for cutting, sewing, and assembling various components of the dress, as well as resources required for each task. Adjustments to size and fit are emphasized throughout the process to ensure the final product meets design specifications.

Uploaded by

ami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views2 pages

Production Plan Amelia R

The document outlines a detailed production plan for creating The Mira Dress over several weeks, specifying tasks, estimated times, and necessary modifications. It includes steps for cutting, sewing, and assembling various components of the dress, as well as resources required for each task. Adjustments to size and fit are emphasized throughout the process to ensure the final product meets design specifications.

Uploaded by

ami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Task 2: Production Plan for The Mira Dress

Week Estimated Step in process Modifications Resources


Time
Week 8 40 minutes Cut out bust pieces (Corset front and Corset back) Mira Dress Pattern Sewing Instructions
on lining fabric + mirrored pattern fabric. Designed by ElisabethSimo
Monday 5 minutes
Iron fabric - Pattern fabric + lining fabric
Lay out fabric, right sides together, selvages Make sure bust pieces fit - Sewing machine (black thread)
Tuesday 35 minutes matching and align the centre. correctly (make bigger or smaller)

20 minutes Pinned along the centre edge, Sew along this


edge. Then hem the sides of the bust pieces.
45 minutes Cut out 4 strap pattern + pieces, right sides Make sure they fit (alter).
Wednesday together and sew along the edges.

55 minutes Turn inside out and sew a small hem on one Make sure there is enough room Loop turner
Thursday edge. The unhemmed edge of the strap and sew it for a tie up halter neck
onto bust piece

Friday 55 minutes Trace and cut remaining panels (add seam Adjust size of garment when
allowance). cutting to save fabric.
- Make sure to place the fabric folded on
the fold marker. (right sides together).

Monday 15 minutes Take the waistband and add a hem along one With a different fabric (solid
long edge. Mark the centre of the waist band with black)
a pin.
40 minutes
Pin the bust pieces to the waistband, ensuring that
they are centred and aligned. Sew the bust pieces
to the waistband.
Tuesday 55 minutes Finish from yesterday. Adjust size to fit.

Pin the side edges of the skirt panels together and


sew them. Make sure you sew on the inside of the
fabric.
Wednesday 45 minutes Pin the top of the skirt to the waistband and sew
them together.
Thursday 55 minutes Add a hem along one long edge of the ruffle Adjust how gathered the skirt will https://www.youtube.com/watch?v=tO3ghcocAOU
pieces. Follow the video tutorial on how to make be.
gathered ruffles.
- Adding a hem the skirt
- Sewing the ruffled end to the end of the
dress
Friday 50 minutes Finish sewing the ruffled end to the end of the
dress.

5 minutes Iron the connecting fabrics

Complete the back closure:


Monday 40 minutes Pin and sew the back of the skirt panels together,
leaving an opening at the top for the zipper.

15 minutes Insert and sew the zipper into the back opening to
complete the closure.

Tuesday 55 minutes Finish sewing the zipper into the back opening to
complete the closure.

Make any adjustments to the dress needed.