0% found this document useful (0 votes)
27 views3 pages

Concrete Casting Report

Uploaded by

Rodney Bitamor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views3 pages

Concrete Casting Report

Uploaded by

Rodney Bitamor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Concrete Casting Report PIC Manager

- Date : 3 May 2021


- Structure : Top Slab/Wa
- Description : Sta.4+700 to 4+73 - Concrete Type : Class A
- Concrete Volume according to GFC Drawing 96m3

Time Duration Quantity


No. Truck No. Remark
Arrival(A) Start(B) Finish(C) B-A C-B (m3)

1 MT 488 11:25 11:30 11:34 0:05 0:04 6 pump used: PC-067


2 MT 479 11:31 11:35 11:41 0:04 0:06 6
3 MT 498 11:36 11:42 11:49 0:06 0:07 6
4 MT 486 11:40 11:50 12:01 0:10 0:11 6
5 MT 480 11:44 12:02 12:29 0:18 0:27 6
6 MT 488 12:16 12:30 12:42 0:14 0:12 6
7 MT 496 12:27 12:43 12:52 0:16 0:09 6
8 MT 479 12:40 12:53 13:02 0:13 0:09 6
9 MT 498 12:49 13:03 13:14 0:14 0:11 6
10 MT 486 12:58 13:15 13:25 0:17 0:10 6
11 MT 480 1:11 1:26 1:38 0:15 0:12 6
12 MT 488 1:28 1:37 1:46 0:09 0:09 6
13 MT 496 1:37 1:47 1:55 0:10 0:08 6
14 MT 479 1:49 1:58 2:07 0:09 0:09 6
15 MT 498 2:00 2:08 2:22 0:08 0:14 6
16 MT 480 2:47 2:48 3:25 0:01 0:37 5

Total 2:49 3:15 95.00


※ Difference Quantity :
※ Difference Reason
Concrete Casting Report PIC Manager

- Date : 10 May 2021


- Structure : Bottom Slab
- Description : Sta. 4+760 to 4+7 - Concrete Type : Class A
- Concrete Volume according to GFC Drawing 66m3

Time Duration Quantity


No. Truck No. Remark
Arrival(A) Start(B) Finish(C) B-A C-B (m3)

1 MT 478 14:35 14:41 14:49 0:06 0:08 6 pump used: PC-083


2 MT 480 14:47 14:51 14:57 0:04 0:06 6
3 MT 487 14:48 15:00 15:07 0:12 0:07 6
4 MT 498 14:55 15:08 15:15 0:13 0:07 6
5 MT 488 15:01 15:17 15:24 0:16 0:07 6
6 MT 489 15:30 15:32 15:40 0:02 0:08 6
7 MT 478 15:40 15:43 15:51 0:03 0:08 6
8 MT 480 15:51 15:53 16:02 0:02 0:09 6
9 MT 487 16:02 16:04 16:10 0:02 0:06 6
10 MT 498 16:07 16:12 16:20 0:05 0:08 6
11 MT 488 16:16 16:22 16:27 0:06 0:05 6
12 MT 489 16:50 16:52 16:55 0:02 0:03 1.5

Total 1:13 1:22 67.5


※ Difference Quantity : - 1.5m3
※ Difference Reason was due to actual thickness and uneven lean concrete surface
Concrete Casting Report PIC Manager

- Date : 12 May 2021


- Structure : Lean Concrete
- Description : Sta. 4+640 to 4+6 - Concrete Type : Type C
- Concrete Volume according to GFC Drawing 19m3

Time Duration Quantity


No. Truck No. Remark
Arrival(A) Start(B) Finish(C) B-A C-B (m3)

1 MT 478 3:00 3:04 3:11 0:04 0:07 6 pump used: PC-083


2 MT 480 3:01 3:14 3:19 0:13 0:05 6
3 MT 487 3:04 3:22 3:31 0:18 0:09 6
4 MT 498 3:45 3:47 3:54 0:02 0:07 6
5 MT 488 4:14 4:15 4:57 0:01 0:42 2

Total 0:38 1:10 26.00

※ Difference Quantity :
※ Difference Reason