This document is a transmittal form from Krishna Buildestate Pvt. Ltd. to Angelica Developer Limited regarding the submission of a material quality report for civil and structure works. It includes details such as the contract number, submission date, and the status of the document. The form also emphasizes the contractor's responsibility for compliance with contract specifications regardless of approval status.

Uploaded by

Neeraj mehra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

DTF 264

This document is a transmittal form from Krishna Buildestate Pvt. Ltd. to Angelica Developer Limited regarding the submission of a material quality report for civil and structure works. It includes details such as the contract number, submission date, and the status of the document. The form also emphasizes the contractor's responsibility for compliance with contract specifications regardless of approval status.

Uploaded by

Neeraj mehra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

p

ANGELICA
DOCUMENT TRANSMITTAL FORM (DTF)-GC
DEVELOPER LIMITED

Rev.
DTF No.: ADL-KBE-DTF-264 0 Date: 3/4/25
No.
Angelica Developer Limited (LP-1B-
To: Angelica Developer Limited Project:
02)
From: Krishna Buildestate Pvt. Ltd. Contract No.: ADL/FEC/LOI-KBE/2324-002
Attention: Mr. Pramod Kumar Package: Civil & Structure Work

WE ARE SENDING: SUBMITTED FOR: SENT VIA:


 Commercial Documents  Commercial Documents Via Email

 Drawings/Sketch /Model  Information, Record & Use ✓ By Hand


 BOQ/Specification  Review & Acceptances COPY:
 Report  For Necessary Action ✓ Hard Copy

 Letter  Comments Soft Copy


Other (Specify) : Material Submittal
 Form
✓ Review/ Approval

Sr. No. Submittal or Document No. Rev. No. Date Description of Submittal or Document Title
KBE-ADL-FEC-QA/QC-MQR-
1 R-0 3/4/25 Submission of MQR-12 for Civil & Structure Works
12

Initiator Quality Manager Project Manager

Mr. Navin kumar Mr. Ravindra kumar


Mr. Navin kumar
Name, Signature & Date Name, Signature & Date
Name, Signature & Date
Received By: -

Name & Designation Date & Time Receiving Stamp & Signature
Internal Distribution Reviewer Comments (if any):-

STATUS
B -Approved with comments (Proceed incorporating given
 A -Approved  comments)
C- Not approved /Rejected, (Revise &
 Resubmit)
 N- Noted

Comments Sheet Attached?  Yes  No

Name: Date : Signature


Note: The Employer’s / Consultants’ approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor shall
be solely responsible for the compliance and the correctness of the submitted Documents as per the required Contract agreement & specifications.
Legends: A- Approved, B- Approved with comments (Proceed incorporating given comments), C- Not Approved/Rejected (Revise &
Resubmit), N- Noted

Form No.: ADL-DTF-264, Rev.00

Page 1 of 1

You might also like