0% found this document useful (0 votes)
595 views6 pages

Shipping Schedule Africa

The document outlines the shipping schedules for various routes from Japan, Singapore, Korea, Thailand, UAE, and the UK to Africa, with details on vessel names, voyage numbers, and ports of departure and arrival. Key notes include that the cut-off date for payments is the payment due date, and all schedules are subject to change without notice. Special requests for later departures may not be accepted.

Uploaded by

morrismkoloma248
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
595 views6 pages

Shipping Schedule Africa

The document outlines the shipping schedules for various routes from Japan, Singapore, Korea, Thailand, UAE, and the UK to Africa, with details on vessel names, voyage numbers, and ports of departure and arrival. Key notes include that the cut-off date for payments is the payment due date, and all schedules are subject to change without notice. Special requests for later departures may not be accepted.

Uploaded by

morrismkoloma248
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

*Notes:

SHIPPING SCHEDULE Japan for Africa


] 1.The cut off date is the payment due date.(Payments need to be confirmed by BE FORWARD before processing the Shipping Schedule).
2.In case of "with Inspection", the cut off date is seven(7) business working days prior to sailing date.
3.All shipping schedules are subject to change without prior notice.
4.The Port of Departure is subject to change without prior notice.
5.Special requests such as keeping cars for later departure may not beaccepted.

■AFRICA Updated: 2025/3/28


Shipping ETD/CUT Port & Date of Departure Port & Date of Arrival
Vessel name Voyage No
Company OFF HITACHINAKA KAWASAKI KISARAZU YOKOHAMA NAGOYA KOBE OSAKA KANDA SHIMONOSEKI HAKATA NAKANOSEKI MOJI DURBAN MAPUTO DAR ES MOMBASA
ETD 26-Mar 27-Mar 29-Mar 29-Mar
JASA MURNI 69 K-LINE 26-Apr
Due Date 18-Mar 19-Mar 21-Mar 21-Mar

ETD 4-Apr 3-Apr 27-Mar 1-Apr 31-Mar


GENUINE ACE 0096A MOL 23-Apr 26-Apr 30-Apr 3-May
Due Date 27-Mar 26-Mar 19-Mar 24-Mar 21-Mar

ETD 1-Apr 2-Apr 3-Apr 5-Apr


MORNING CAROL 153 KEIHIN 29-Apr
Due Date 24-Mar 25-Mar 26-Mar 28-Mar

ETD 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr


VIKING PASSERO 049 NYK 30-Apr 7-May 9-May
Due Date 25-Mar 26-Mar 27-Mar 28-Mar 28-Mar

ETD 10-Apr 9-Apr 8-Apr 12-Apr 13-Apr


NEPTUNE ACE 0115A MOL 3-May 5-May 9-May 12-May
Due Date 2-Apr 1-Apr 31-Mar 4-Apr 4-Apr

ETD 12-Apr 13-Apr 14-Apr 16-Apr


VIKING PASSAMA 005 KEIHIN 9-May
Due Date 4-Apr 4-Apr 4-Apr 8-Apr

ETD 15-Apr 16-Apr 18-Apr 17-Apr


ORION LEADER 054 NYK 15-May 8-May 6-May
Due Date 7-Apr 8-Apr 10-Apr 9-Apr

ETD 21-Apr 20-Apr 18-Apr 17-Apr 15-Apr


LUNA SPIRIT 0170A MOL 8-May
Due Date 11-Apr 11-Apr 10-Apr 9-Apr 7-Apr

ETD 1-May 2-May 4-May 6-May


HOEGH JACKSONVILLE 67 HOEGH 9-Jun 7-Jun 2-Jun 1-Jun
Due Date 23-Apr 24-Apr 25-Apr 28-Apr

■WEST AFRICA ※WEST AFRICA : MOL TURN (1/3/4/6/7/9/10/12) / K-LINE TURN (2/5/8/11)
Shipping ETD/CUT Port & Date of Departure Port & Date of Arrival
Vessel name Voyage No
Company OFF HITACHINAKA KAWASAKI KISARAZU YOKOHAMA NAGOYA KOBE OSAKA NAKANOSEKI
SHIMONOSEKI HAKATA LUANDA LIBREVILLE LAGOS DOUALA COTONOU DAKAR TEMA ABIDJAN
ETD 4-Apr 3-Apr 27-Mar 1-Apr 31-Mar
GENUINE ACE 0096A MOL 2-May 5-May 8-May 15-May 10-May 12-May
Due Date 27-Mar 26-Mar 19-Mar 24-Mar 21-Mar

ETD 31-Mar 1-Apr 2-Apr 4-Apr


MORNING CAROL 153 KEIHIN 17-May
Due Date 21-Mar 24-Mar 25-Mar 27-Mar

ETD 25-Apr 26-Apr 27-Apr 29-Apr


TARIFA or sub KEIHIN 8-Jun
Due Date 17-Apr 18-Apr 18-Apr 21-Apr
65 SHIPPING SCHEDULE Singapore for Africa
*Notes:
1.The cut off date is the payment due date.(Payments need to be confirmed by BE FORWARD before processing the Shipping Schedule).
2.In case of "with Inspection", the cut off date is seven(7) business working days prior to sailing date.
3.All shipping schedules are subject to change without prior notice.
4.The Port of Departure is subject to change without prior notice.
5.Special requests such as keeping cars for later departure may not beaccepted.

■EAST AFRICA Updated: 2025/3/26

Shipping Port & Date of Departure Port & Date of Arrival


Vessel name Voyage No
Company SINGAPORE DURBAN MAPUTO DAR ES MOMBASA
GUARDIAN LEADER 121 NYK 1-Apr 21-Apr 15-Apr 13-Apr
HOEGH YOKOHAMA 134 HOEGH 04/02 04/22 04/20 04/15 04/14
GENUINE ACE MOL 04/12 04/23 04/26 04/30 05/03
V-0096A
VIKING PASSERO 49 NYK 04/13 04/30 05/07 05/09
NEPTUNE ACE V-0115A 04/19 05/03 05/05 05/09 05/12
ORION LEADER V-054 NYK 04/24 05/15 05/08 05/06

■WEST AFRICA Updated: 2025/3/26

Port & Date of Departure Port & Date of Arrival


Shipping
Vessel name Voyage No
Company
SINGAPORE LUANDA LIBREVILL LAGOS DOUALA COTONOU DAKAR TEMA ABIDJAN
x SHIPPING SCHEDULE Korea for Africa
*Notes:
1.The cut off date is the payment due date.(Payments need to be confirmed by BE FORWARD before processing the Shipping Schedule).
2.In case of "with Inspection", the cut off date is seven(7) business working days prior to sailing date.
3.All shipping schedules are subject to change without prior notice.
4.The Port of Departure is subject to change without prior notice.
5.Special requests such as keeping cars for later departure may not beaccepted.

■EAST AFRICA Updated: 2025-03-26

Shipping Port & Date of Departure Port & Date of Arrival


Vessel name Voyage No
Company BUSAN KWANGYANG PYEONGTAEK INCHEON MASAN DURBAN★ MAPUTO★ DAR ES★ MOMBASA★

TOREADOR V-TOD034 EUKOR 12/14

TARIFA V-146 EUKOR 1/2 02/04 01/30

TREASURE V-TRE062 EUKOR 02/13 03/13 03/05 03/07

GRAND PAVO V-GPV126 EUKOR 03/12 04/11 04/03 04/05


GUANGZHOU HIGHWAY V.184 K-LINE 2/16 04/02

MV LAKE ANNECY V.0009A MOL 02/25 04/11

GALVESTON HIGHWAY V.155 K-LINE 03/23 TBN TBN

SWALLOW ACE V.0147A MOL 03/18 05/09 05/12

MORNING CAROL V-MRC153 EUKOR 04/08 05/06 04/28 04/30

■WEST AFRICA Updated: 2025-03-26

Port & Date of Departure Port & Date of Arrival


Shipping
Vessel name Voyage No
Company
BUSAN KWANGYANG PYEONGTAEK INCHEON MASAN LUANDA LIBREVILL LAGOS DOUALA COTONOU DAKAR TEMA ABIDJAN

TOREADOR V-TOD034 EUKOR 12/14 02/02


TARIFA V-146 EUKOR 01/02 02/15 02/24 2/19 02/20
TREASURE V-TRE062 EUKOR 02/09 03/23 04/01 03/26 03/27
GRAND PAVO V-GPV126 EUKOR 03/12 04/19 04/28 04/23 04/24
GUANGZHOU HIGHWAY V.184 K-LINE 2/16 4/18 4/14
MORNING CAROL V-MRC153 EUKOR 04/08 05/14 05/23 05/18
65 SHIPPING SCHEDULE Thailand for Africa
*Notes:
1.The cut off date is the payment due date.(Payments need to be confirmed by BE FORWARD before processing the Shipping Schedule).
2.In case of "with Inspection", the cut off date is seven(7) business working days prior to sailing date.
3.All shipping schedules are subject to change without prior notice.
4.The Port of Departure is subject to change without prior notice.
5.Special requests such as keeping cars for later departure may not beaccepted.

■EAST AFRICA Updated: 2025/3/26

Shipping Port & Date of Departure Port & Date of Arrival


Vessel name Voyage No
Company LAEM CHABANG BANGKOK DURBAN MAPUTO DAR ES MOMBASA
WALRUS ACE V-TBA MOL 22-Dec 16-Jan 18-Jan 22-Jan 26-Jan

ORCA ACE V-0053A MOL 31-Dec 16-Jan 22-Jan 26-Jan

WORLD SPIRIT V-0301A MOL 10-Jan 10-Feb

TARIFA 104 EUKOR 15-Jan 1/30 - 1/25 1/27

DIVINE ACE V-0100A MOL 20-Jan 17-Feb 19-Feb 23-Feb 27-Feb

SUNRISE ACE V-130A MOL 27-Jan 17-Feb 19-Feb 23-Feb 27-Feb

IRIS ACE SUB 02/09 03/08 03/10 03/14 03/18

ASTRAL ACE V.397A 02/14 03/08 03/10 03/14 03/18

WORLD SPIRIT V.0304A 02/21 03/18 03/21 03/25 03/29

ASTRAL ACE V.0399A MOL 03/15 04/05 04/07 04/11 04/15

IRIS ACE V.0093A MOL 03/15 04/24 04/26 04/30 05/03

DIVINE ACE V.0101A MOL 03/20 04/24 04/26 04/30 05/03

GENUINE ACE SUB MOL 03/31 04/24 04/26 04/30 05/03

WORLD SPIRIT V.0307A MOL 04/04 05/03 05/04 05/08 05/11

WORLD SPIRIT V.0308A MOL 04/18 05/20 05/22 05/25 05/28

ASTRAL ACE V.0401A MOL 04/25 05/20 05/22 05/25 05/28

LAEM CHABANG BANGKOK LUANDA LIBREVILL LAGOS DOUALA COTONOU DAKAR TEMA ABIDJAN

VICTORY LEADER V 19 KLINE 29-Aug 11-Oct


650 SHIPPING SCHEDULE UAE for Africa
*Notes:
1.The cut off date is the payment due date.(Payments need to be confirmed by BE FORWARD before processing the Shipping Schedule).
2.In case of "with Inspection", the cut off date is seven(7) business working days prior to sailing date.
3.All shipping schedules are subject to change without prior notice.
4.The Port of Departure is subject to change without prior notice.
5.Special requests such as keeping cars for later departure may not beaccepted.
■EAST AFRICA Updated: 2025/3/26

Shipping Port & Date of Departure Port & Date of Arrival


Vessel name Voyage No
Company SHARJAH JEBEL ALI DURBAN MAPUTO DAR ES MOMBASA
CATTLEYA ACE V-0102A MOL 04/07 04/24 05/05 04/15 04/13

Updated: 2025/3/26

■WEST AFRICA Voyage No


Shipping Port & Date of Departure Port & Date of Arrival
Vessel name Company SHARJAH JEBEL ALI LUANDA LIBREVILL LAGOS DOUALA COTONOU DAKAR TEMA ABIDJAN
*Notes:
SHIPPING SCHEDULE UK for Africa 1.The cut off date is the payment due date.(Payments need to be confirmed by BE FORWARD before processing the Shipping Schedule).
2.In case of "with Inspection", the cut off date is seven(7) business working days prior to sailing date.
3.All shipping schedules are subject to change without prior notice.
4.The Port of Departure is subject to change without prior notice.
5.Special requests such as keeping cars for later departure may not beaccepted.
■EAST AFRICA Updated: 2025/3/26
Shipping
Voyage No Port & Date of Departure Port & Date of Arrival
Company

Shipping
Vessel name Voyage No SHEERNESS SOUTHAMPTON TILBURY DURBAN MAPUTO DAR ES MOMBASA
Company

02/19 03/15 03/17


Anji Prestige 25AP01 Sallaum Lines
02/19 03/24
Piranha 25PA02 Sallaum Lines
01/29 02/18
Nabucco EE501-NUC Wallenius
02/06 03/01
Tiranna EE502-TIR Wallenius
02/16 03/10
Torino EE503-TNO Wallenius
02/26 03/20
Toreador EE504-TOD Wallenius
03/02 03/24
TOREADOR EE504-TOD Wallenius

RCC America RCA046 NMT


03/02 04/07

03/10 03/31
Tarifa EE505-TFA Wallenius
04/07
TARIFA EE505-TFA Wallenius 03/16
04/10
HÖEGH SUNLIGHT 2 HOEGH 03/16
Anji splendor 25NN01 Sallaum Lines 03/20
04/17 04/19

Silver sun 25SU03 Sallaum Lines 03/22 04/24


Lavender Ace LVA113A NMT 03/24
04/14 04/16

GRAND DAHLIA 5 HOEGH 03/29 04/21


04/02 04/24
Thermopylae EE506-THY Wallenius
HÖEGH AUSTRALIS 2 HOEGH 04/03 04/28

HÖEGH TRIDENT 216 HOEGH 04/25 05/16

HÖEGH SHANGHAI 117 HOEGH 04/25 05/18

Anji Sincerity 25AC01 Sallaum Lines 04/03 04/28 05/01

TBN-GLOVIS TBN AF NMT 04/23 05/24

Piranha 25PA04 Sallaum Lines 04/15 05/18

Silver Ray 25SR04 Sallaum Lines 05/02 06/02

HÖEGH TRACER 54 HOEGH 05/03 05/26

Glovis Silver GSL033 NMT 05/05 06/10

HOEGH TRAPPER 50 HOEGH 05/12 06/04

Updated: 2025/3/26

Shipping
■WEST AFRICA Voyage No
Company
Port & Date of Departure Port & Date of Arrival

Shipping
Vessel name Voyage No SHEERNESS SOUTHAMPTON TILBURY LUANDA LIBREVILL LAGOS DOUALA COTONOU DAKAR TEMA ABIDJAN
Company
RCC America RCA046 NMT 03/02 3/19 03/26/2025
GRT TEMA GTT0225 Grimaldi 03/22 04/25 04/07 04/07 04/11 04/13
GRT Casablanca GCB0325 Grimaldi 03/29 05/05 04/15 04/20 04/20 04/23
GRT Antwerp GTA0325 Grimaldi 04/07 05/16 04/22 05/01 04/27 04/29
TBN-GLOVIS TBN AF NMT 04/23 05/05 05/13
GR COTONOU GCT0225 Grimaldi 4/13 05/12 05/20 04/29 05/18 04/28 05/01 05/03 05/05
Piranha 25PA04 Sallaum Lines 04/15 05/02 4/26
Silver Ray 25SR04 Sallaum Lines 05/02
Glovis Silver GSL033 NMT 05/05 05/22 05/29

You might also like