0% found this document useful (0 votes)
244 views3 pages

Water Supply Layouts

The document outlines the water supply layout for a proposed two-storey villa, detailing the connections and specifications for hot and cold water supply systems. It includes information on manifold distribution boxes, pipe sizes, and installation notes to ensure proper functionality and waterproofing. The layout is designed to meet the needs of various rooms, including kitchens, bathrooms, and irrigation systems.

Uploaded by

Unnikrishnan V
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views3 pages

Water Supply Layouts

The document outlines the water supply layout for a proposed two-storey villa, detailing the connections and specifications for hot and cold water supply systems. It includes information on manifold distribution boxes, pipe sizes, and installation notes to ensure proper functionality and waterproofing. The layout is designed to meet the needs of various rooms, including kitchens, bathrooms, and irrigation systems.

Uploaded by

Unnikrishnan V
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

MANIFOLD PLUG MANIFOLD Ø25

SHUT-OFF VALVE WATER SUPPLY GENERAL NOTE

SUB MAIN LINE OR


HOT WATER SUPPLY
BRANCHES
GATE VALVE
WATER SUPPLY Ø15

MANIFOLD DISTRIBUTION BOX DETAIL(TYP.)


PRV
COLD WATER SUPPLY

SHUT OFF VALVE


HOT WATER SUPPLY

1. THE BOX BODY TO BE BUILT-IN THE WALL


2. COVER FINISH TO MATCH WITH WALL FINISH
3. COVER TO HAVE MAGNETIC DOOR CATCH
4. THE BOX TO BE PROPERLY WATER PROOFED
5. TO PROVIDE DRAIN OUTLET IN THE M.D.B
MANIFOLD CONNECTION DETAIL(TYP.)

PLAN SECTION E 26.5


m
RTY LIN
PROPE
GATE VALVE & HOSE BIB DETAIL 40∅ CWS T/A TO SUPPLY
ROOF TANK
ANK
ROOF T
PIPE T/A
U/G Ø40
HEAD
LPS @30M . 4 LAYER POLYETHYLENE
F TANK PUMP 1.0 ORIES
25∅ HWS PIPE F/A (GF -KITCHEN) ROO TRANSFER LATED ACCESS INSULATED HORIZONTAL
PIPE T/A L RE
U/G Ø40 WITH AL WATER TANK
32∅ CWS PIPE F/A (GF -KITCHEN) CAPACITY:2100 LITRES TO SUPPLY ROOF TANK
UPPER FLOOR PROJECTION

DN

M.D.B
CONNECTION
FROM AUTHORITY

WM
16∅ PEX (TYP)
PROPERTY LINE 20.0 m

MAIN WATER
SUPPLY
STORE-01
SWIMMING POOL DETAILS BY SPECIALIST
WATER METER
OPEN
KITCHEN

DN

32∅ CWS PIPE F/A TO EXT.


(GF EXT. KITCHEN) KITCHEN

25∅ HWS PIPE F/A TO


(GF EXT. KITCHEN)

UPPER FLOOR PROJECTION


DINING-01
M.D.B

DN

16∅ PEX (TYP)

DN

50∅ CWS F/A TO SUPPLY


16∅ PEX (TYP) LOBBY-01 SITE IRRIGATION
HB

BATHROOM-03
M.D.B

16∅ PEX (TYP)


UP 28
LIVING
25∅ HWS PIPE F/A

PROPE
1 27
HALL-01
(GF BATHROOM-03) 2 26
WASH-01 3 25
GUEST
32∅ CWS PIPE F/A ROOM-01 4 24
OPEN TO RTY LIN
(GF BATHROOM-03) 5 23
M.D.B

ABOVE
6 22
7 21
E 18.5

8 20
9 19
TOILET-01
10
11 12 13 14 15 16 17 18
m
UPPER FLOOR PROJECTION

25∅ HWS PIPE F/A


32∅ CWS PIPE F/A
DN
PROPERTY LINE 5.5

GARAGE
UPPER FLOOR PROJECTION
m

HB

.6 m
PROPERTY LINE 15

PROPERTY LINE 14.1 m

GROUND FLOOR WATER SUPPLY LAYOUT


SCALE 1:100

CLIENT: PROJECT
MR. ALI ABDULAZIZ MOHAMED
ALDAILAMI
PROPOSED TWO STOREY
CONSULTANT :
VILLA AT MAQABA

TITLE
GROUND FLOOR WATER
SUPPLY LAYOUT
MAIN CONTRACTOR : DRAWN BY : SNL DATE : 05.02.2024

CHECKED BY : VR SCALE : 1:100


VERIFIED BY : REV : 00

JOB NO : DWG NO : TY/WS 01


REV DESCRIPTION DATE
MANIFOLD PLUG MANIFOLD Ø25
SHUT-OFF VALVE WATER SUPPLY GENERAL NOTE

SUB MAIN LINE OR


HOT WATER SUPPLY
BRANCHES
GATE VALVE
WATER SUPPLY Ø15

MANIFOLD DISTRIBUTION BOX DETAIL(TYP.)


PRV
COLD WATER SUPPLY

SHUT OFF VALVE


HOT WATER SUPPLY

1. THE BOX BODY TO BE BUILT-IN THE WALL


2. COVER FINISH TO MATCH WITH WALL FINISH
3. COVER TO HAVE MAGNETIC DOOR CATCH
4. THE BOX TO BE PROPERLY WATER PROOFED
5. TO PROVIDE DRAIN OUTLET IN THE M.D.B
MANIFOLD CONNECTION DETAIL(TYP.)

PLAN SECTION LINE 26


.5 m
RTY
PROPE
GATE VALVE & HOSE BIB DETAIL
Ø50mm F.B-T.A
TO SUPPLY ROOF TANK

25∅ HWS PIPE F/A - T/B (GF -KITCHEN)


32∅ CWS PIPE F/A - T/B (GF -KITCHEN)
PROPERTY LINE 20.0 m

LIVING
HALL-02

BEDROOM-01

25∅ HWS PIPE F/A -T/B


(GF EXT. KITCHEN)

32∅ CWS PIPE F/A - T/B


(GF EXT. KITCHEN)

32∅ CWS PIPE - F/A DRESS-01 50∅ CWS F/A TO SUPPLY


(FF BATHROOM-01) SITE IRRIGATION

LOBBY-02
25∅ HWS PIPE - F/A
(FF BATHROOM-01) 50∅ CWS F/A TO SUPPLY
SITE IRRIGATION
M.D.B
MASTER
DRESS
BATHROOM-01 16∅ PEX (TYP) UP 16∅ PEX (TYP) DN
28
25∅ HWS PIPE F/A - T/B

PROPE
29 27
(GF BATHROOM-03) 30 26
M.D.B

32∅ CWS PIPE F/A - T/B 31 25 MASTER


32 24 BEDROOM

RTY LIN
(GF BATHROOM-03) OPEN TO
33 23
ABOVE/BELOW 16∅ PEX (TYP)
34 22
STORE-02 OFFICE-01
BATHROOM-02 35 21
16∅ PEX (TYP) M.D.B
E 18.5
36 20
37 19
38
M.D.B
m

MASTER
BATHROOM
DRESS-02

25∅ HWS PIPE F/A - T/B


32∅ CWS PIPE - F/A (GF BATHROOM-01)
(FF BATHROOM-02)
32∅ CWS PIPE F/A - T/B
PROPERTY LINE 5.5

25∅ HWS PIPE - F/A


(FF BATHROOM-02) (GF BATHROOM-01)
25∅ HWS PIPE F/A
32∅ CWS PIPE F/A

BEDROOM-02
m

.6 m
PROPERTY LINE 15

PROPERTY LINE 14.1 m

FIRST FLOOR WATER SUPPLY LAYOUT


SCALE 1:100

CLIENT: PROJECT
MR. ALI ABDULAZIZ MOHAMED
ALDAILAMI
PROPOSED TWO STOREY
CONSULTANT :
VILLA AT MAQABA

TITLE
FIRST FLOOR WATER
SUPPLY LAYOUT
MAIN CONTRACTOR : DRAWN BY : SNL DATE : 05.02.2024

CHECKED BY : VR SCALE : 1:100


VERIFIED BY : REV : 00

JOB NO : DWG NO : TY/WS 02


REV DESCRIPTION DATE
MANIFOLD PLUG MANIFOLD Ø25
SHUT-OFF VALVE WATER SUPPLY GENERAL NOTE

SUB MAIN LINE OR


HOT WATER SUPPLY
BRANCHES
GATE VALVE
WATER SUPPLY Ø15

MANIFOLD DISTRIBUTION BOX DETAIL(TYP.)


PRV
COLD WATER SUPPLY

SHUT OFF VALVE


HOT WATER SUPPLY

1. THE BOX BODY TO BE BUILT-IN THE WALL


2. COVER FINISH TO MATCH WITH WALL FINISH
3. COVER TO HAVE MAGNETIC DOOR CATCH
4. THE BOX TO BE PROPERLY WATER PROOFED
5. TO PROVIDE DRAIN OUTLET IN THE M.D.B
MANIFOLD CONNECTION DETAIL(TYP.)

PLAN SECTION .5 m
RTY LINE 26
PROPE
GATE VALVE & HOSE BIB DETAIL

40∅ CWS F/B TO SUPPLY ROOF TANK


32∅ CWS PIPE - T/B (GF -KITCHEN)

25∅ HWS PIPE - T/B (GF -KITCHEN)

ROOF
PROPERTY LINE 20.0 m

DECK

• EWH-01: TO SYPPLY ROOF BATHROOM-04, LAUNDRY


• EWH-02: TO SUPPLY GF BATHROOM-03
• EWH-03: TO SUPPLY GF KITCHENS, TOILET-01
• EWH-04: TO SUPPLY FF BATHROOM-02
• EWH-05: TO SUPPLY FF BATHROOM-01
• EWH-06: TO SUPPLY FF M.BATHROOM

25∅ HWS PIPE T/B


(GF EXT. KITCHEN) ROOF
DECK COVERED HORIZONTAL TWO ROOF WATER TANKS
TOTAL CAPACITY 4200 LITERS
32∅ CWS PIPE T/B
EWH-01

EWH-05
EWH-03

EWH-04

EWH-06
EWH-02

(GF EXT. KITCHEN)

BOOSTER PUMP 1.0 LPS @30M HEAD


WITH ALL RELATED ACCESSORIES.

32∅ CWS PIPE - T/B


(FF BATHROOM-01)
40∅ CWS T/B TO SUPPLY
25∅ HWS PIPE - T/B
WATER SITE IRRIGATION
(FF BATHROOM-01)
TANK
BATHROOM-04 ROOM

LOBBY-03
25∅ HWS PIPE - T/B 56 DN
M.D.B
(GF BATHROOM-03) 55
PROPE
M.D.B
54
32∅ CWS PIPE - T/B 16∅ PEX (TYP) 53
(GF BATHROOM-03) 52
RTY LIN

MAID'S OPEN TO 51 ROOF


BELOW
16∅ PEX (TYP) ROOM STORE-02 / 50 DECK
LAUNDRY 49
E 18.5

36 48
37 47
38
39 40 41 42 43 44 45 46
m

25∅ HWS PIPE - T/B


(FF BATHROOM-02) 25∅ HWS PIPE - T/B
(GF BATHROOM-01)
32∅ CWS PIPE - T/B
(FF BATHROOM-02) 32∅ CWS PIPE - T/B
PROPERTY LINE 5.5

(GF BATHROOM-01)
25∅ HWS PIPE - T/B
ROOF
DECK
(FF M .BATHROOM)

32∅ CWS PIPE - T/B


(FF M .BATHROOM)
m

.6 m
PROPERTY LINE 15

PROPERTY LINE 14.1 m

ROOF WATER SUPPLY LAYOUT


SCALE 1:100

CLIENT: PROJECT
MR. ALI ABDULAZIZ MOHAMED
ALDAILAMI
PROPOSED TWO STOREY
CONSULTANT :
VILLA AT MAQABA

TITLE
ROOF WATER SUPPLY
LAYOUT
MAIN CONTRACTOR : DRAWN BY : SNL DATE : 05.02.2024

CHECKED BY : VR SCALE : 1:100


VERIFIED BY : REV : 00

JOB NO : DWG NO : TY/WS 03


REV DESCRIPTION DATE

You might also like