Water Supply Layouts
Water Supply Layouts
DN
M.D.B
CONNECTION
FROM AUTHORITY
WM
16∅ PEX (TYP)
PROPERTY LINE 20.0 m
MAIN WATER
SUPPLY
STORE-01
SWIMMING POOL DETAILS BY SPECIALIST
WATER METER
OPEN
KITCHEN
DN
DN
DN
BATHROOM-03
M.D.B
PROPE
1 27
HALL-01
(GF BATHROOM-03) 2 26
WASH-01 3 25
GUEST
32∅ CWS PIPE F/A ROOM-01 4 24
OPEN TO RTY LIN
(GF BATHROOM-03) 5 23
M.D.B
ABOVE
6 22
7 21
E 18.5
8 20
9 19
TOILET-01
10
11 12 13 14 15 16 17 18
m
UPPER FLOOR PROJECTION
GARAGE
UPPER FLOOR PROJECTION
m
HB
.6 m
PROPERTY LINE 15
CLIENT: PROJECT
MR. ALI ABDULAZIZ MOHAMED
ALDAILAMI
PROPOSED TWO STOREY
CONSULTANT :
VILLA AT MAQABA
TITLE
GROUND FLOOR WATER
SUPPLY LAYOUT
MAIN CONTRACTOR : DRAWN BY : SNL DATE : 05.02.2024
LIVING
HALL-02
BEDROOM-01
LOBBY-02
25∅ HWS PIPE - F/A
(FF BATHROOM-01) 50∅ CWS F/A TO SUPPLY
SITE IRRIGATION
M.D.B
MASTER
DRESS
BATHROOM-01 16∅ PEX (TYP) UP 16∅ PEX (TYP) DN
28
25∅ HWS PIPE F/A - T/B
PROPE
29 27
(GF BATHROOM-03) 30 26
M.D.B
RTY LIN
(GF BATHROOM-03) OPEN TO
33 23
ABOVE/BELOW 16∅ PEX (TYP)
34 22
STORE-02 OFFICE-01
BATHROOM-02 35 21
16∅ PEX (TYP) M.D.B
E 18.5
36 20
37 19
38
M.D.B
m
MASTER
BATHROOM
DRESS-02
BEDROOM-02
m
.6 m
PROPERTY LINE 15
CLIENT: PROJECT
MR. ALI ABDULAZIZ MOHAMED
ALDAILAMI
PROPOSED TWO STOREY
CONSULTANT :
VILLA AT MAQABA
TITLE
FIRST FLOOR WATER
SUPPLY LAYOUT
MAIN CONTRACTOR : DRAWN BY : SNL DATE : 05.02.2024
PLAN SECTION .5 m
RTY LINE 26
PROPE
GATE VALVE & HOSE BIB DETAIL
ROOF
PROPERTY LINE 20.0 m
DECK
EWH-05
EWH-03
EWH-04
EWH-06
EWH-02
LOBBY-03
25∅ HWS PIPE - T/B 56 DN
M.D.B
(GF BATHROOM-03) 55
PROPE
M.D.B
54
32∅ CWS PIPE - T/B 16∅ PEX (TYP) 53
(GF BATHROOM-03) 52
RTY LIN
36 48
37 47
38
39 40 41 42 43 44 45 46
m
(GF BATHROOM-01)
25∅ HWS PIPE - T/B
ROOF
DECK
(FF M .BATHROOM)
.6 m
PROPERTY LINE 15
CLIENT: PROJECT
MR. ALI ABDULAZIZ MOHAMED
ALDAILAMI
PROPOSED TWO STOREY
CONSULTANT :
VILLA AT MAQABA
TITLE
ROOF WATER SUPPLY
LAYOUT
MAIN CONTRACTOR : DRAWN BY : SNL DATE : 05.02.2024