Republic of the Philippines
AURORA STATE COLLEGE OF TECHNOLOGY
Zabali, Baler, Aurora 3200
A Narrative Report
Presented to the Faculty of the School of Industrial Technology,
A Work Immersion or Practicum under Dual School Training (DT) Program in
AURORA STATE COLLEGE OF TECHNOLOGY
Brgy. Zabali, Baler, Aurora
in Partial Fulfillment of the Requirements for the Degree of
Bachelor in Industrial Technology, Major in Civil Engineering Technology
ALEX C. EMPANIDO JR.
Xyrell Kaith S. Pis-ong
August 2024
Resume
i
Table of Contents
Title Page - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Resume - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Table of Contents - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - i
Acknowledgement - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ii
Endorsement Letter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - iii
Certificate of Completion - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - iv
Industry Immersion Form - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - v-xii
Introduction - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1
Orientation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2
Insight Gain - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3
Knowledge Skills - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4
Problem Encountered - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5
Solutions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6
Suggestion/ Recommendations - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7
Company Profile - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8
Daily Time Record - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9-10
Pictures - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10-19
Other Attachment - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20-23
iv
Acknowledgment
This narrative report would not have been possible without the unwavering
support and guidance of the individuals listed below. The intern expresses profound
gratitude for their invaluable contributions of knowledge, time, and effort.
To my parents for their unwavering love and support;
Our appreciation also goes out to my friends and fellow interns who have shared
this enriching journey with us;
Special thanks to our Immersion adviser, Sir Acer John V. Friginal, for his
invaluable guidance and supervision throughout the training period up to the
culmination of this narrative report;
We express our gratitude to the Dean of BIT, Prof. Annie R. Capin, for her
exceptional leadership within our college and for granting us the privilege to gain
practical experience in real-world settings;
Most of all, to God Almighty for every single blessing he has showered upon us.
I hope there will be more activities like this so that every student like me can have more
experience.
School of Industrial Technology
Endorsement Letter
iv
Certificate of Completion
School of Industrial Technology
INDUSTRY SUPERVISED TRAINING GUIDELINES
I. To qualify for the Industry Supervised Training Program, one must:
1. Have satisfactorily completed Practicum I, II, and III.
2. Have no academic deficiency aside from concurrent subjects enrolled.
3. Be clear of school accountabilities, financial and other.
4. Be physically fit by the accompanied Medical Certificate certified by a
government physician.
a. ECG
b. HEPA Test for Food Technology
c. Others
5. Accomplish the school waiver.
6. Accomplish the school clearance.
7. Have enrolled in the Practicum/OJT program.
II. To qualify for the Company Assignment, one must:
1. Qualify for Industry Training Programs and Policies.
2. Qualify to the company requirements.
3. Be officially Accepted and given job assignments.
III. To satisfactory Comply with the internship Program, one must:
1. Accomplish the 240 hours on or before ________________ cut-off time.
2. Submit a certificate of training on or before __________________ cut-off
time. (Failure to do so shall mean exclusion from the list of candidates for
graduation.)
3. Have a performance rating of at least 5.0 (Satisfactory).
4. Submit the training booklet as part of the academic requirement.
5. Obey the Company Policy, rules and regulations.
6. Uphold the image of the College and the internship Program.
7. Not abandon or change his/her official assignment unless given official
permission/sanction by proper authorities. Violation of the above-
mentioned compliance requirements may be grounds for unaccredited
Practicum/ OJT activity and disciplinary action.
iv
TRAINING AGREEMENT
This AGREEMENT entered this 24th day of JUNE between AURORA STATE
COLLEGE OF TECHNOLOGY with business address at BRGY. ZABALI, BALER,
AURORA represented by ACER JOHN V. FRIGINAL hereinafter referred to as the Host
Training Establishment
-and-
XYRELL KAITH S. PIS-ONG, of legal age and residing at BRGY. BAYANIHAN, MARIA
AURORA, AURORA hereinafter referred to as the student-Intern,
WITNESSETH:
THAT the primary objectives of this AGREEMENT are for the student-intern to
gain practical skills experience, knowledge, and insights into various aspects of Civil
Engineering Technology while actively working within the Host Training Establishment
and to apply theoretical knowledge acquired during their Bachelor in Industrial
Technology program. Specifically, students will be able to learn about real work, safety,
and innovation while being directly involved in the real world of work. This internship will
expose the student intern to problem-solving skills, and adaptability to real-time
challenges that will enhance quick thinking and application of their acquired knowledge.
THAT the Student-intern agrees to apply himself/herself diligently and faithfully to
work in the department/unit during the period of the internship in conformity with the
standard approved for the aforementioned Host Training Establishment and makes parts
of this AGREEMENT, and under the following terms and conditions:
1. Period of Internship 6 weeks (or a total of 240 hours)
2. Date of Internship June 24 – August 2, 2024
3. Approximate date of Completion of August 2, 2024
Internship
4. To be assigned at Aurora State College of Technology
School of Industrial Technology
THAT the student-intern shall agree to exercise the following roles and responsibilities:
1. The student-intern shall comply with all the necessary requirements in
accordance with the Student Internship Program Plan prior to the
deployment of the latter in the Internship program.
2. The student-intern shall work the equivalent of eight (8) hours a day on
weekdays during his/her internship. Time spent on related theoretical
instruction shall be considered as hour training.
3. Actively participate in all aspects of the Internship program and complete
assigned tasks and projects.
4. Adhere to all company policies, procedures, and guidelines, including those
related to confidentiality, data security, and workplace conduct.
5. Seek guidance and feedback from supervisors and mentors to enhance
learning and performance.
6. Demonstrate professionalism in all interactions with colleagues, clients, and
other stakeholders.
7. Continuously update knowledge and skills related to Civil Engineering
Technology through self-study and participation in relevant training
sessions.
THAT the Host Training Establishment (HTE) shall agree to exercise the
following roles and responsibilities:
1. Provide comprehensive training and orientation to familiarize the student-
intern with the Host Training Establishment (HTE) policies, procedures, and
infrastructure.
2. Assign a dedicated supervisor or mentor with expertise in Civil Engineering
Technology to guide and support the student-intern throughout the
internship program.
3. Offer meaningful tasks and projects that align with the student-intern’s
learning objectives and provide opportunities for skill development.
4. Ensure access to necessary resources and tools for the student-intern to
carry out assigned tasks effectively.
5. Foster a collaborative and inclusive work environment where the student-
intern can contribute ideas and learn from experienced professionals.
6. Any Student-intern who fails to perform satisfactorily within any stages of
his internship may be given, at the discretion of the department/unit, a
period of one week within which to improve his/her performance. If within
this period, the student-intern concerned fails to show any improvement
he/she should be dropped from the internship.
7. The student-intern who can complete the required internship period shall be
issued a certificate of completion.
iv
8. The student shall be considered a Student-intern not an employee and shall
have access to technical information concerning their area of specialization
to the said department/unit.
THAT, a copy of this AGREEMENT shall be furnished without cost to the
student-intern and the Aurora State College of Technology, Baler, Aurora.
THAT, this AGREEMENT including the terms and conditions herein shall be held
strictly confidential and that no portion or part hereof may be reproduced or be revealed
to any personnel or entity other than that of the signatories herein or their authorized
representative.
THAT, this AGREEMENT shall take effect on the date of the start of the
internship by Student-intern.
In WITNESS WHEREOF, the parties have hereunto affixed their signature this
day of June at Baler, Aurora.
ACER JOHN V. FRIGINAL XYRELL KAITH S. PIS-ONG
Host Training Establishment Representative Student -Intern
NOEL G. PIS-ONG BEVERLY S. PIS-ONG
Name of Father/Guardian Name of Mother/Guardian
ANTONIO D. BOLIVAR III ANNIE R. CAPIN
Internship Coordinator Dean, School of Industrial Technology
School of Industrial Technology
ACKNOWLEDGEMENT
Republic of the Philippines } S.S.
Baler, Aurora }
Before me, a notary public, for and in _______________________, this
________ day of _____________ of 20____ personality appeared
Name ID No. Date Issued Place Issued
XYRELL KAITH S. PIS-ONG 22-02-0054
Known to me to be the same persons who executed the following instrument and
acknowledged to me that the same is their free and voluntary act and deed.
WITNESS MY HAND AND SEAL, this ____ day of ______________ 2024, in
_______________________________, Philippines.
________________________________
Notary Public
Doc No ________________
Page No ________________
Book No ________________
Series of 20__ ________________
iv
INDUSTRY DUAL TRAINING SYSTEM REPORT GRADING SYSTEM
INDUSTRY TRAINING EQUIVALENT RATE/GRADE
NUMERICAL RATE
GRADE RANGE
9.34 – 10.00 1.0 Excellent
8.66 – 9.33 1.25 Excellent
8.01 – 8.65 1.50 Excellent
7.34 – 8.00 1.75 Very good
6.68 – 7.33 2.00 Very good
6.01 – 6.67 2.25 Good
5.34 – 6.00 2.50 Good
*4.67 – 5.33 2.75 Fair
4.00 – 4.66 3.00 Passed
BELOW 4.00 5.00 Failed
● Practicum/OJT must have a performance rating of at least 5.0 (Satisfactory)
under GUIDELINES FOR THE SUPERVISED INDUSTRY (PRACTICUM/ON-
THE-JOB) TRAINING Section III – 6.
● Lower than 5.0 GRADE means: re-enroll in the DTS program.
● Grades given by the industry during the internship will be recognized as the
Official Grade to reflect in the Grading Sheet as a show of faith with respect
to the integrity and independence of the company.
School of Industrial Technology
STUDENT DAILY ACTIVITY SHEET
STUDENT INTERN : XYRELL KAITH S. PIS-ONG
AREA OF SPECIALIZATION : CIVIL ENGINEERING TECHNOLOGY
SUPERVISOR : SIR ACER JOHN V. FRIGINAL
SCHOOL/SECTION : BIT-CET 1A
SUPERVISOR
DATE STUDENT ACTIVITIES
SIGNATURE
06-24-24 Arranging requirements
06-25-24 Cleaning up the CADD room
06-26-24 Picking up used woods
06-27-24 Assisting in the CADD room
06-28-24 Organizing narrative/research
07-01-24 Sweeping
07-02-24 Cleaning
07-03-24 Sweeping
07-04-24 Sweeping
07-05-24 Pulling up grass/pouring cement
07-08-24 Pulling up grasses
07-09-24 Pulling up grasses
07-10-24 Mopping the floor
iv
07-11-24 Wiping chairs
07-12-24 Making garlands
07-15-24 Making garlands
07-16-24 Bought Materials
07-17-24 Designing the stage
07-18-24 Recognition Day
07-19-24 Distributing programs and
diploma
07-22-24
Assisting incoming first-year
07-23-24
Assisting in the admission office
07-24-24
Evaluating requirements
07-25-24
All levels suspended
07-26-24
Continuation of enrollment
07-29-24
Helping in the admission office
07-30-24
Printing certificates
07-31-24
Distributing certificates and DTR
08-01-24
Making Narrative
08-02-24
Finalizing Narrative
REMARKS:
(For the effective and efficient quality of instruction and quality service delivery of
our students and institution, your feedback and suggestions are very valuable to
us and will be treated with confidentiality)
INTERNSHIP SUPERVISED DAILY PERFORMANCE RATING SHEET
School of Industrial Technology
DAILY ACTIVITIES INCLUSIVE RATING SUPERVISOR’S
DATES SIGNATURE
Arranging requirements 06-24-24
Cleaning up the CADD room 06-25-24
Picking up used woods 06-26-24
Assisting in the CADD room 06-27-24
Organizing narrative/research 06-28-24
Sweeping 07-01-24
Cleaning 07-02-24
Sweeping 07-03-24
Sweeping 07-04-24
Pulling up grass/pouring cement 07-05-24
Pulling up grass 07-08-24
Pulling up grass 07-09-24
Mopping the floor 07-10-24
Wiping chairs 07-11-24
Making garlands 07-12-24
Making garlands 07-15-24
Bought Materials 07-16-24
Designing the stage 07-17-24
Recognition Day 07-18-24
Distributing programs and 07-19-24
diploma
07-22-24
Assisting incoming first-year
07-23-24
Assisting in the admission office
07-24-24
Evaluating requirements
07-25-24
All levels suspended
iv
Continuation of enrollment 07-26-24
Helping in the admission office 07-29-24
Printing certificates 07-30-24
Distributing certificates and DTR 07-31-24
Making Narrative 08-01-24
Finalizing Narrative 08-02-24
RATING GUIDE:
(Please make your rate daily in accordance to the corresponding performance of
the trainee.)
9-10 Outstanding
7-8 above Satisfactory
5-6 Satisfactory*
3-4 Need Improvement
1-2 Poor
*Passing Grade
i
Introduction
In the dynamic landscape of technology and infrastructure, the Bachelor of
Industrial Technology in Civil Engineering Technology (BIT CET) stands out as a beacon
of innovation and interdisciplinary excellence. This advanced program acts as a crucial
bridge connecting the digital sphere with the physical world, preparing aspiring
professionals to tackle the complex challenges prevalent in modern civil engineering
practices.
This program aims to equip students for their future careers by familiarizing them
with the industrial conditions relevant to their specialization. Through work immersion,
students gain practical experience in social interactions within a professional setting,
enhancing their readiness for post-graduation challenges. This program is instrumental
in facilitating the acquisition of course-relevant skills, enriching the students' educational
journey.
Practicum is a cooperative education that aims to achieve work experience. It is
one of how Department faculty members can observe and evaluate the skills of the
student. This is an opportunity to apply their knowledge and practice their skills in actual
settings. This practicum training program is done under the supervision of a faculty
member. The number of hours required for this practicum training is 240 hours.
The BIT-CET curriculum is meticulously designed to establish a robust
groundwork in IT and civil engineering principles. Within this collaborative environment,
individuals recognize that the essence of CET's strength lies not solely in technical
expertise but also in teamwork and the unified pursuit of a common goal.
iv
Orientation
This year, the Work Immersion/Practicum program was initiated by the
instructors of the Bachelor in Industrial Technology (BIT) department to familiarize us
with the work environment on June 21, 2024. During the orientation, they delineated the
practicum process, provided guidance on necessary preparations, and outlined the
prerequisites essential for the commencement of our immersion experience.
School of Industrial Technology
Insight
Practicum holds paramount significance for a Bachelor in Industrial Technology
(BIT) student as it represents a crucial step towards attaining broader knowledge and
honing individual skills. It becomes evident that fostering a harmonious team dynamic is
essential for achieving excellence in our tasks. The practicum ended up with a lot of
unforgettable and meaningful experiences that we can use in our future careers for
professional growth. It equips us with valuable insights on effective communication with
others, shaping our abilities for future career endeavors.
Work immersion serves as a pivotal learning opportunity where students actively
engage with authentic work settings, enabling them to garner firsthand knowledge and
skills relevant to their desired professions. This immersive experience affords students
the chance to participate in genuine work environments, contributing meaningfully while
honing their expertise. In this practicum, we delve into the importance of observation and
insight during work immersion.
Observation during work immersion also helps students develop a better
understanding of the expectations and requirements of their chosen career paths. This
exposure enables them to recognize the essential skills and competencies vital for
success in their respective fields.
iv
Knowledge Skills
The initial year of college holds significant transformative potential for students,
particularly those pursuing the Bachelor of Industrial Technology in Civil Engineering
Technology (BIT-CET) program. Through immersive work experiences, students have
the opportunity to bridge theoretical knowledge with practical applications, facilitating a
seamless transition from college to the professional sphere.
Developing Essential Skill
The first year at BIT CET is meticulously planned to provide students with a
comprehensive skill set necessary for their future professional endeavors. This
immersive experience provides a practical platform for developing these skills:
Practical Skills:
Students in work immersion programs have various responsibilities to fulfill. Of
course, each job role is different, and you will encounter different software systems and
tools depending on your chosen profession, basic IT skills are expected of all new hires.
Analytical Skills:
Immersion training presents students with the challenge of engaging in critical
and creative thinking to tackle intricate industrial issues. Proficiency in analytical skills is
paramount as it empowers individuals to navigate diverse challenges, formulate decisive
solutions, and implement actionable plans to address them.
School of Industrial Technology
Problem Encountered
I am grateful to have this kind of curriculum because already experienced how to
be a good employee in a short time in real work and then the attribute of this for my skill.
In my first year of immersion, problems could not be avoided in terms of any work-
related training.
Some of the difficulties I have encountered are the lack of materials and tools to
be used while doing our task. It may be our choice to have an immersion in ASCOT but
most of the tasks we did were not related to our major. The plan after the visitation of
NEUST faculties was to learn basics in sketch-up but due to some circumstances such
as the CADD room being under renovation. In such a short time we can learn some
skills that we can apply to our course, but some sort of problem cannot be solved
immediately.
iv
Solutions
As a student trainee, I need to do my best being the practitioner like you need to
accept the experience of all in your place and understand the situation of your
workplace. I need to be more initiative in doing tasks, and also to engage in some work
such as helping or observing in doing the BIT logo. If I want to experience tasks that are
related to my major, I should be working off-campus to gain skills. I should be willing or
volunteer on some tasks even if I’m not the one in charge.
School of Industrial Technology
Suggestion/ Recommendations
As an intern and student of Aurora State Colleges of Technology and am taking
of Bachelor of Industrial Technology Major in Civil Engineering Technology, I suggest
that before mid-year for immersion, they have prepared designated tasks for the
students that are related to their course.
Tools and other needs should also be upgraded and provided so the students
can use them. If also possible, the department will have a partnership with TESDA for us
to enroll in related to our major such as Carpentry, Plumbing, and EIM.
iv
Company Profile
Vision
ASCOT 2030: ASCOT is a globally recognized comprehensive inclusive higher
education institution anchoring on the local culture of Aurora in particular and the
Philippines in general.
Mission
ASCOT shall capacitate the human resources of Aurora and beyond to be globally–
empowered and future-proofed; generate, disseminate, and apply knowledge and
technologies for sustainable development.
School of Industrial Technology
Daily Time Record
iv
Pictures
Orientation
Day 1 (Arranging requirements) Day 2 (Cleaning the CADD
room)
School of Industrial Technology
Day 3 (Picking up used wood) Day 4 (Helping in the CADD
room)
iv
Day 5 (Organizing Narrative/research) Day 6 (Sweeping)
School of Industrial Technology
Day 7 (Cleaning) Day 8 (Sweeping)
iv
Day 9 (Sweeping) Day 10 (Pouring gavel and sand)
Day 11 (Pulling out grasses) Day 12 (Pulling out grasses)
School of Industrial Technology
Day 13 (Mopping) Day 14 (wiping the chairs)
Day 15 (Making garlands) Day 16 (Making garlands)
iv
Day 17 (Bought materials)
School of Industrial Technology
Day 18 (Decorating the stage)
Day 19 (Recognition and Oath-taking)
iv
Day 20 (Graduation Day- Distributing Diploma and program)
School of Industrial Technology
Day 21 (Assisting incoming first year) Day 22 (Helping in the admission office)
iv
Day 23 (Evaluating requirements)
Day 24 (Classes and works all levels are suspended)
Day 25 (Continuation of enrollment)
School of Industrial Technology
Day 26 (Admission)
Day 27 (Printing Certificates)
iv
Day 28 (Distributing certificates) Day 29 ( Making Narrative)
Day 30 (Finalizing narrative)
School of Industrial Technology
Other Attachments
iv
School of Industrial Technology
iv