0% found this document useful (0 votes)
770 views1 page

Indemnity Form

The indemnity form is a legal document where the developer agrees to indemnify the County Government of Nyeri from any claims related to the proposed building construction. It emphasizes the developer's responsibility for any design errors and the requirement to employ qualified professionals for the project. Any changes in engineering personnel must be communicated to the town engineer for approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
770 views1 page

Indemnity Form

The indemnity form is a legal document where the developer agrees to indemnify the County Government of Nyeri from any claims related to the proposed building construction. It emphasizes the developer's responsibility for any design errors and the requirement to employ qualified professionals for the project. Any changes in engineering personnel must be communicated to the town engineer for approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COUNTY GOVERNMENT OF KIAMBU.

DEVELOPMENT CONTROL.
INDEMNITY FORM.
We, I, Mrs, M/s ………………………………………………... ID No. …………………………………
Of P.O. Box ……………………... being the developer of a proposed building Plan Registration No.
……………… Plot No. …………………………………………………. do hereby indemnify the
County Government of Nyeri town engineering approving the plan from any claims that might arise as a
result of the above building construction during or after the construction including collapse or loss of life(s)
as a result.

The approval of the structural drawings shall NOT relieve me and my structural engineers of full
responsibility of errors or omissions in the design, which maybe subsequently be discovered. The County
Structural Engineer shall be absolved from any negligence claims whatsoever.

We/I shall maintain the service of a qualified and registered engineer,

Eng……………………………………. Registered Architect Mr. /Ms …………………………. and


experienced registered contractor Mr. /Ms. ……………………………. Tel No. ………….
………………..

We/ I will also employ the services of an experienced, qualified resident engineer or clerk works (minimum
qualifications: Diploma in building construction or equivalent) or general foreman, who is capable of
reading the particulars of working drawings showing the details of structural design and ensuring that the
work is carried out in accordance therewith and as stipulated in Clause 126 Building Code, the Local
Government (adoptive by-laws) (grade II) building order 1968.

Any changes in the engineering professionals involved of the said construction shall be forwarded to the
town engineer immediately for approval.

Developer: ……………………………………. Signed: …………………… Date: ………………………...

Architect: ……………………………………... Signed: ……………………. Date: ……………………….

Structural Engineer: ………………………………… Signed: ………………. Date: ……………………...


_____________________________________________________________________________

For Official Use only

Accepted ………………………………………………

Date ……………………………………………………...

You might also like