Report

The document is a purchase requisition from CPHL Ship Operation for various parts needed for ship operation, with a high priority status. It includes details such as the required items, quantities, and the cost head for the purchase. The requisition is initiated by Mohammad Ashikur and approved by several department heads, with a total estimated cost of 0.00.

Uploaded by

Ashik Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Report

The document is a purchase requisition from CPHL Ship Operation for various parts needed for ship operation, with a high priority status. It includes details such as the required items, quantities, and the cost head for the purchase. The requisition is initiated by Mohammad Ashikur and approved by several department heads, with a total estimated cost of 0.00.

Uploaded by

Ashik Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CPHL Ship Operation

Head Office : Awal Center (17th Floor), 34, Kemal Ataturk Avenue, Banani C/A, Dhaka-1213, Bangladesh
Plant Address : Chittagong, Bangladesh
PURCHASE REQUISITION

Purchase Requisition (Site Purchase)

SPR NO : CSO/2025/PR04018

Date : 01-03-2025 10:24 PM

Priority : High
To, Purchase Department
Type Of Purchase : Site Purchase

Please purchase the following items: Estimated Time Required - 01-03-2025 Approved Date : 02-03-2025 12:29 PM

Amd Approve Date :

Last Purchase
SL Part Required Approved Unit Total Stock In
Product Description Unit Unit Total Remarks/Purpose
No No. Qty Qty Price Price MRR No Date Quantity Hand
Price Price
1 Turbo Charger (ME-8170ZC720-2) - Set 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.0
2 Fuel Injector Pump - Set 2.00 2.00 0.00 0.00 CSO/2024/WCC/00208 10-11- 2.00 15,888.74 31,777.48 0.0
2024
3 Fuel AC pump (M.E. 8170ZC720-2) - Pcs 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.0
4 Air Starting System (Engine Model: - Pcs 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.0
8170ZC720-2)
5 Sea water cooling Pump - Units 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.0
6 Hand Oil Pump Servicing (170Z.11.00) - Set 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.0
Grand Total: 0.00

Requirement For : Operation


Cost Head : CPHL:BUDGET - CAPEX/DEVELOPMENT BUDGET - Yearly Docking of 5 ship
Remarks : OT. GCSA BU-2

Initiator S-HOD HOD PM PM-OPS SCM COO


Mohammad Ashikur Mohammad Ashikur Mohammad Ashikur Capt. Reaz Hasan (Retd)
Assistant Engineer Assistant Engineer Assistant Engineer Project Manager
(shipbuilding) (shipbuilding) (shipbuilding) (shipbuilding)

Print Date: 09-03-2025 09:45 AM Page 1 of 1