The document outlines a work inspection request for the site preparation of a temporary access road, specifically focusing on the inspection of lean/blinding concrete for a box culvert. It includes signatures from the site engineer and QC engineer, confirming that the work is complete and compliant with specifications. Additionally, it references a test report for concrete slump and temperature, indicating the concrete's readiness for inspection.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
11 views4 pages
Scan 108
The document outlines a work inspection request for the site preparation of a temporary access road, specifically focusing on the inspection of lean/blinding concrete for a box culvert. It includes signatures from the site engineer and QC engineer, confirming that the work is complete and compliant with specifications. Additionally, it references a test report for concrete slump and temperature, indicating the concrete's readiness for inspection.