0% found this document useful (0 votes)
11 views4 pages

Scan 108

The document outlines a work inspection request for the site preparation of a temporary access road, specifically focusing on the inspection of lean/blinding concrete for a box culvert. It includes signatures from the site engineer and QC engineer, confirming that the work is complete and compliant with specifications. Additionally, it references a test report for concrete slump and temperature, indicating the concrete's readiness for inspection.

Uploaded by

ZAMA KOR KALAY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
11 views4 pages

Scan 108

The document outlines a work inspection request for the site preparation of a temporary access road, specifically focusing on the inspection of lean/blinding concrete for a box culvert. It includes signatures from the site engineer and QC engineer, confirming that the work is complete and compliant with specifications. Additionally, it references a test report for concrete slump and temperature, indicating the concrete's readiness for inspection.

Uploaded by

ZAMA KOR KALAY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
Won rpacionrauack ni ram Contractor i ‘Work inspection | 10-662151-110000334-AAC-CIV-WIR- oe | Rev, Request No, | 0000108 Bae 08-08-2021 = ‘me | Site Preparation Framework/Temporary | Contract fits ‘Access Road 15W (0 10 KM) Number __| 1100001334-Wo-005 Contractor AbAyuni Investment & Contracting | eae Company (AICC) Region Western Road -15 ee : Inspection Of Lean/Blinding Concrete For | Pate ©) 08.09.2021 ee Bed Of Box Culvert Along With Walls Eo op rrateating _[ COMPCNEINAl Respect ATSTA+787.19 | Figg | 11:04AM Location STA 14787.19 (avi [1 Architectural [] Mechanical [] Electrical Discipline Loother (specify) Dz] orawings Dz inspection Test Plan Bxlcheck ist [] Method Statement [] Calibration ‘Attachment(s) | [klsurvey Report [[] As-Built Drawings [_] Material Inspection Request [_] Material Submittal Clother (specify) Point of z inepection told a Olwitness Site Engineer (ready for GA/QC Engineer's inspection and/or |v. [ns testing) - ‘Adham Magdy Signature Date 07-09-2021 Time 09:30 QC Engineer f G h Comments It 7 Z QC Engineer (ready for inspection and/or testing) Dives Tino Irfan Ullah = Signature we Date 07-09-2021 Time 09:45 The contractor hag/verified that the work to be inspected is complete and in compliance with specifications, ‘Approved Drawings, Method Statement and Quality Control Plan, IT & Quality Checklist. an ‘anjac Manager's. | Muhammad Siddique Malik Date 07-09-2021 Name as = Signature UC Projet MIM bement donselar (PMc) /Enterprise Pr FIICIEDM Comnments roject Management Consytant (EFM) PMC/EPM's Decision | [_] Work is ready for inspection DWork is not ready for inspection PMC/EPM Representative Name Signature ETSD (Q&E) Received by QC inspector/Engineer Signature ‘Comments one be, Beer __ Gd eer 7 SEO [AA Work May Proceed (18 incorporate Comments [revise and Resubmit, do and Proceed not Proceed Engineer Name QC Inspector 6 atta _ [pate LeF Er21/ Signature QA/QC Specialist / Supervisor Canto?’ ‘Comments QA/QC Specialist 7 Supervisor Name Signature Received by Contractor (in case of hard copy) — Name Date Signature S57 | BMico APPVEEAL TUPAIL BUNVAN At $atamt Bunoine Marentats Lasoratony Si gad ali) Shi ull le th, Test Report For Slump ASTM C1 43,& Temperature ASTM C1064 Client Nam [At Ayu lvestnent and Contracting Company —[elent Contact Nov WA = | fev wetiy [eh —| [Client Bi N/A |Concrete Source: Abdulla Abdin Est Lab Ret. Nos [art-21-8000601 [stum Range 10825 RFI Number: wie-oo0o08| [Femerature Range (oC) 2 ee Design Strengths 15 Mpa Reportissue Date: fitsepar [Concrete Location: ine cae a [Fest Report Format Noz ‘Test Report Format Approval Date Customer Request No: ‘Aleeo- QUA 2 Sep, 062021 WA SeNo] Delivery No: | Transit Miter No: ere one Remarks 1 se = Fn 10 2 52500 306 100 oeeNothing Paleaaoe Fema: Concrete Tor bed of ox Culver Along wth walls comple at wapect at STA TATE or) wrmnesseoL) F c.R.2081226809 / ca ano dct s owned by Aaa Tata Banja A Solan Dang Sas inpror wren prov ofthe company The teats eset sbmited snp cok Aen ON "re 308 Be aban DT Ont NDE PO

You might also like