0% found this document useful (0 votes)
128 views9 pages

Dabaspet 4th Phase

Uploaded by

Appasab Biradar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views9 pages

Dabaspet 4th Phase

Uploaded by

Appasab Biradar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

StatelevelEnuironment

lmpact
Assessment
Authority-Karnataka
(Constituted
by MoEF,Government
of India,undersection3(3)of E(P)Act, 19SO)

No. SEIAA 1 IND 2013 Date: 27-08-201,5

To,
The Developmental Officer -i,
KarnatakaIndustrial Area DeveiopmentBoard (KIADB)
#49,4'}.& 5ft Floors,
Khanija Bhavan,RaceCouise Road,
Bengaluru-560 001
Qir

Sub: Establishment of Dobaspet 4h PhaseIndustrial Area, in


the viilages of YedehalJi, Chandana Hosahalii,
Honnenahaili, Kengal Kemp'ohalli, Avverahalli, K G
Srinivasapura, Billanakote, I{elamangala Taluk,
Bengaiuru Rural District by Karnataka Industrial Area
Development Board (KIADB) - Issue of Environmental
Ciearance-reg.

This has reference to your applications No. KIADB/DO-


3&EE/651/201,2-13dated: 31't December 2012addressedto SEIAA, Kainataka
and subsequentletters addressed to SEIAA/SEAC, Karnataka seeking prior
environmental clearancefor the above project under the EiA Notification,2006.
The proposal has been appraised as per prescribedprocedurein the light of
provisions under the EIA Notification, 2006 on the basis of the mandatorl'
documents enciosed with the application viz., the Application in Form 1,
prefeasibilitv-renort
r----------.-.)
-_f.".. and the aclditionai
r Lclarifications
l4ratL4ltuiLJ lfurnished
qalLt,-ltgu fin
rt resnonse
IEJt,vrrJL io
(v

the observaticins of the State Expert Appraisal Conrmittee (SEAC), Karnataka.


SEAC has recommended for issue of Environmental Clearance in its meetinss
held on 5ft and 6ft lune 2015.

2. It is, inter-alia, noted that \{rs. K;


Board (KIADB), have proposeci for e
Industrial Area for estar:lishment of Crar
Total piot area of 891,.26Acres (360.68 I
Annerure-Il. Out of 897.26 Acres. 431.
24.93Acres area is for Comrnerc ial, 23.70
_8tgf..Acresarbais ioi{i;
area is for Utilih',43.24 Acres area is for Resicieniial. ..-:;.___
ffi----
?

R o o i . -ir' , , I c . 7 C 6 , 7 1Fnl c o r ' , ' i i hG a t e , i i 4 S E u i l i i i r r g S : i 3 = i o l e - 5 e 0 r 1 i ) ' 1Piicire ffiA-22-+3'24?7Vax


r ar ri i- , : . ' , , ' . , i - ri i:€ , i ' , i i i t. i , r e i i a i . . - ':rr;i t ; i ,
3 - r y i i r l : : n - ; r + . ; - i . 2 ; X 7 l ; 1 ' . . ; 1 1 ; 1 . ' : 1 - . 1t :; u
State Level Environment Impact Assessment Authority-Karnataka
(Consdruied by MoEF, Govemrnmt of Indja under section3(3)of Ep) Act, 1986)
SEIAA l hID 2013 Establishment of Dobaspet 4ft Phase Indust'ial Area
by Karnataka Indusbial Areas Development Board (iCADB)
Park, 87.70 Acres area is for Buffer (Green Belt), M.58 Acres area is for Truck
Parking, 113.57 Acre area is earmarked for Road and 1,6.46 Acres area
earmarked for BMRDA road as per CDP Nelamangala [The site plan is enclosed
as Annexure-Il]. Total rvater requirement for the industriai area is 8.08 MLD
(Domestic : 2.68 MLD + Indusfri aJ:5 .4 MLD) rvill be met from HemavatLr-iRiver.
Total waste water generated ts 4.8M MLD (Domestic effluent: 2.744 MLD +
Industrial effluent: 2I MLD). Domestic waste water will be treated in STP of 2.2
N4LD and industriai effluent will be treated in ETP oi 2.8 MLD capacity. Total
Power requirement is 63.3 MVA will be sourced from KPTCL/ BESCOM. The
project cost is Rs.677.33Crores.

3. The project proposal has been considered bv SEAC on 15s & 16ihMarch
2013 and fons *"r" issued vide ]etter dated 66 April 201.3 for cond.ucting
Environment Impact Assessment Studv. The EiA has been conducted by M/s.
ABC Techno Labs India Prirzate Limited who is accredited from NABET vide
No. NABET /EIA/7316/RA001, Rev 09, August201l Valid up to 15ft November *s/
201'6.Pubiic consultation was held on 15ft July 2074 and Supplementary Public
hearing was held on 9e December 2014. The final combined EIA report has
been submitted on 12s March 2075.

4. Based on the inJormation submitted by you and presentation made by


Environmental consultant, M/s.ABC Techno Labs India Prjvate Limited No.2
2ndStreet, Thangam Colony, Anna Nagar West, Cherurai Tamil Nadu -60C040.
The State Level Expert Appraisa-l Cornmittee (SEAC) examined the proposal in
the rneeting held on 30ft & 31st March 2015 and sth & 6m ]une 2015 and has
recorrunended for issue of Environmental Clearance.

5. The State Environmental Impact Assessment Authoriw (SEIAA)


Karnataka has considered the project in its meeting held on 29e June 2015 and
after due consideration of the relevant documents submitted by the project I
proponent and additionai clarifications furnished in response to its v
observations and the appraisal and recommendation of the SEAC, have
accorded environmental clearance as per the prorrisions of Environmental
Impact Assessment Noti{icatton-2006 and its subsequent amendments, subjeci
to strict compliance of the following terms and conditions :-

A- SPECIFICCONDITIONS

I. ConstructionPhase:

7 . "Consent for Establishment" shali


Pollution Control Board under Air
submitted to the SEIAA, Karnataka
at the site.
-^lI
Set up an environment *rrr4.r
;*^-^-_^-r
[a5trr1rc.[ rL Lgll \ r i t h
shall be created as the project starts. It shall
paiameters and activities during conskuction
StateLevei Environment Impact AssessmentAuthority-Karnataka
(Corstituted by MoEF; Govemmmt of India r:nder section3(3)of fpl'act, fOeOl
SEI,AA1IND2013 Establisirmentof Dobaspet4ti'Phasekrdustrial Area
by Kamataka IndusfrialAreasDevelopment Board(KIADB)
from day one. The cell a-lsoensuresthat the ceil manages/ maintains all
the environmentaj aspects such as seurage treatment, solid waste
disposal,maintenanceof greenbelt areas,etc.
3. A11required sanitary and h;igienic measuresshould be in place before
starting construction activities and to be maintained throughout the
construction phase. Sufficient nurnber of toilets/batlrooms shall be
provided with required mobile toilets, mobile STP for conslruction work
force.
4. A First Aid Room should be provided in the Project both during
constructionand operation of the project.
5. Adequate drinking water and sanitary facilities should be provided for
consiruction workers at the site. The safe disposal of wastewater and
-solidwastesgeneratedduring the conslructionphaseshouid be ensured.
6. Pfovision shall be made for the housing of constructionlabourersr.t'ithin
the site with all necessaryinfraskuciures. The housing may be in the
form of temporary structuresto be removed aJterthe completion of the
project.The facilities shall include the crdche.
7. Provision should be made for the supply of fuei (keroseneor cooking
gas); utensils such as pressure cookers etc, to the labourers during
constructionphase.
8. AII the labourers to be engagedfor constructionshould be screenedfor
health and adequately treated before engaging them to i,r'ork at the site
and detailed report submitted to SEiAA. Safety standards as per
National Building Code (NBC) should be ensured.
9. For dis-infectionof wastewaterr,vhichis not meant for recycling for toilet
flushing, use ultra violet radiation and not chlorination. For treated
wastewater meant for reuse for toilet flushing, disinfect by using
chlorination.
10. AII the topsoil excavatedduring construction activities should be stored
for use in horticultare / landscapedevelopmentwithin the project site.
11. Disposalof muck, consfructiondebris during constructionphase should
not create any adverse effect on the neighbouring communities and be
disposedtaking the necessaryprecautionsfor general safety and health
aspectsof people, only in approved sitesr.t'iththe approval of competent
authority.
12.Soil and ground r.r.ater samplesshould be iesied at the projectsite during
the constructioirphaseto ascertainthat tirereis no threat to grouncJ.*'ater
quality by leaching of hear,y,- meta.
report submitted to Sfma. ,,./rt
13. Construction spoils, jnc1utling,'.l:iit
materials, must not be allo*td f
dumpsites for such materialimust
leachinto the ground rratei r ,, .,, , : ;'.,.1
14.The diesel generator-setstorbe used cluring co:rstructiolp.Jraseshoulclbe
of low sulphur djesei t1'peaiad-r,should confcrm to E (P,).:.niles prescribed
for air and noiseemissjonstandards !'!!;t:','-:' ../-::'.";'
state Level EnvironmentImpact AssessmentAuthority-Karnataka
(corstituted by MoEF, Gov*nment of krdia under section3(3) of E(p) Act, 19g6)
SEIAA l IND 2013 Establishment of Dobaspet 4n Phase lndustrial Area
by Karnataka LrdustuialAreas Development Board (KIADB)
15. The diesel requiredfor operating DG sets shall be stored in underground
tanks and if required, clearancefrom Chief Controller of Explosives shaii
be taken.
16. Vehicles hired for bringing construction material to the site shouid be in
good condition and should conJorm to the applicable air and noise
emission standards and should be operated only during non-peak hours.
17. Ambient noise levels should conjorm to the residential standards both
during dav and night. Incremental pollution ioad.s on the ambient air
and noise quality should be closely monitored during construction
phase. Adequate fiIeasures to reduce air and noise pollution during
consfruction keeping in mind CPCB norms on noise lirnits.
18. Fly ash should be used as building material in the construction as per the
provisiors of Fly Ash Notification of September L999 and amended as on
August 2003.
19. Readv mixeci concrete must be used in builciing consiruction.
20. Storm water control and its re-use as per CGWB and BIS standards for
various applications.
21.Water demand during corstruction should be reduced by use of pre-
mixed concrete, curing agents and other best practices and orLly tertiary
lreated water shall be used for conskuction as per G.o. No. FEE 188 ENV
2003 dated 1.4.08.2003.
22. No ground rarater is to be drawn without perrnjssion from the
Central/State Ground Water Authority.
23. Separation of grey and black u'ater should be done by the use of dual
plumbing line for separation of grey and biack rvater.
24.Treatment of 700% grey water by decentralized treatment shoulcl be
done.
25" The provision of Energy Conservation Building code, 2006 shatl be fulty
complied with.
26. Roof shouid meet prescriptive requirement as per Energy Conseryation
Building Code, 2007by using appropriate thermal insulation material.
27.opaque r,r'all should meet prescriptive requirement as per Energy
Consen'ation Building Code, 2007 whtch is proposed to be mandatory
for all air conditioned spaceswhile it is optional for non-air conditioned
sPaces by use of appropriate thermal insulation material to fulfil
requirement.
?8. The Proponent shall obtain the conslruction material such as stones and
jelly etc. orLly fiom the approved quariied and other construdtion
material shail also be procured from the authortzed agencies/traders.
?9.The Proponent shall o_:b--tefr^r,,SpB1o1'al
from the competentauthorities for
structural safety-,,g{;;;ti+e'.
safety .or:'-'ine-'o-giidiaEV"e
6gil4ing.:i:(ue to earthquake, adequac;.
adequacl, of
firefighting eq+4ididr'etc. as-piei:,&ke-Wational eulaing Code (NBC)

31. Safeiv standaids as Der rt-ationalBuilding-Code (NBC), 2005should be


I

,ari , :t , -^r'.'
State Level Environment Impact Ass essment Authorifv-Karnataka
(Consiifuied bv lvicEF,Gotemimt of Inciia r:nder section3(3) of E(P) Act, 1986)

SEIAA 1I\iD 2013 Establishmentof Dobaspet4u' Phasel:rdustrial Area


by KarnatakaIndust'iai AreasDevelopmentBoard(KIADB)
32. The project Authorities shall ensure that the illerinnel Rr'ilrlino Code,
2005 is complied with and adhered to.
33. The project authorities shali not use Kharab land if any, for any purpose
and keep available to the general public duly displa,ving a board as
public property. No structure of any kind be put up in the Kharab jand
and shall be afforested ar-rdmaintained as green belt oniy.
34. The authorities should include the condition while issuing plots to the
prospective indirzidual industrips fhaf therzchorrlci develop greenbelt of
at least 33 % of the plot area.
35. The industria-l units in the industrial area and the associated facilities
shail be strictly in accordance with the norms laid down by the
Karnataka State Govemment and KSPCB/CPCB.
36. Tire project authorities shail sfrictly acihere to the comn-Lifmenis rr,ade
r.rdth regard to establishment of STP/CETP, buff er zone, green be1t,
ccnCitions to be incorporated in the lease document v;hile ailotting plots
to indirriduai industries, environment sa-fety'aspects etc.
37. The project Authorities shall ensure the time specification prescribed by
the Honourable High Court of Karnataka in \41P.No. 1,958/2071,(LB -
RES - PIL) on 04.72.201.2for different actir,rities involved in construction
work.
38. The existing water body, canals and rajakaluve and other drainage and
water bound structures if any shali be retained unaltered with due buffer
zone of 15 meter alround maintained under free cover.
39. The project authorities shall leave 30 mfrs buffer from the boundary of
Iake and 15 meters on either side of the channel f nala and other r.vater
bodies if any and this shall be free from any permanent strucf.rres. The
bulfer so maintained shail be planted with indigenous tree species such
as Neem, Akash Mallige, Mahagoni, FIonge, Kadamba Ficus, etc. and
maintained as green belt.
40. The natural sioping pattern of the project site shall lemain unaltered and
Y the natural hydrology of the area be maintained as it is to ensure natural
flow of storn'r water.
41. Lakes and other vrraterbodies within andf or at the vicinity of the project
area shall be protected and conserved.
42. The project Authority will undertake all relevant measures, as indicated
during the Pubiic Hearing for impicline the Socio-econ-omrccondiiions
of the surrounding area.
4'3.The project Authority shali undertake deveiopment sirictiv in accorclance
with Notification No. FEE 215 ENV 2000 Dated 10.11.2003issued bv
State Levei Environment Impact Assessment Authority'-6-tlu,*u
(Corutituied by MoEF, Gover-nmentof Indja under section3(3) of E(P) Act 1986)

SEIAA 1IN-D 2013 Estabijshment of Dobaspet 4'i. Phase Industrial Area


b,v Karnataka Industrial Areas Development Board (KIADB)
2. The installation of the Sewage Trealment Plarrt (STP) / Effluent
Trealment Plant (ETP) sha-ll be got certi-fied by an independent expert
and a report in this regard should be submitted to the SEIAA before ihe
project is commissioned for operation. Treated effluent emanating from
STP shall be recycled/reused to the maximum extent possible. Treatment
of 700% $ey water by decentralized treatment should be done.
Discharge of treated sewage shali conJorm to the norms & standards of
the Karnataka State Pollution Control Board. Treated seu/ageshould be
used for flushing, gardening, etc. as proposed. Necessar-vmeasures
should be made to mitigate the odour problem from STP.
3. The solid waste generated should be properly collected and segregated.
Wet garbage should be composted and dty / inert solid waste should be
disposed off to the appror.ed sites for iand filling aJter recovering
recvciable material.
4. Diesel power generating sets proposed as souice of backup power for
elevators and common area illumination during cperaticn phase should
be of enclosed type and con-form to rules made under the Environment
(Protection) Act, L986. The height of stack of DG sets should be equal to
the height needed for the combined capacity of ail proposed DG sets.
Use low sulphur diesel. The location of the DG sets may be decided with
in consultation with Karnataka State Pollution Control Board.
5. Noise should be conlroiled to ensure that it does not exceed the
prescribed standards. During night time the noise levels measured at the
boundary of the building shail be resfricted to the permissible levels to
comply with the preva-lent regulations.
6. The project proponent shali ensure development of a minimum of 33% of
the pioject area which shali inciude the buffer zone anci green belt
developed by individuai industries. The project AuthoriW ma.v*
undertake compensatory green belt development through avenue
.:* +L^ ^:,,.:^ ^*^-;+-'
*l^*r^r-;^- :* rL^
,..,,
yrq.rrLaLr\-,rr ^J:^;*;--
the adjoining -^^A^
roads ^*J
and in the civic amenisr ^area
*^^
rt there rs
;{ +l

any shortfail within the project site in the unavoidable circumstances.


7. Weep hoies in the compound walls shall be provided to ensure natural
drainage of rain water in the catchment area during the.morsoon period.
8. Rain water hanresting for roof run- off and surface run- off, as plan
submitted should be implemented. Before recharging the surface run off,
n+n
yl
t + n r F m ^ - t lm
c-LIgaLlItgllL l l uu
) Ls t bL /eg Ldl o
u ln Li r
t Ee tLc r Ler rm
r uo
\ i ' es JsurJrys
Lanr eu Lnu d e . i m
l l r qaLfLfLe
ar/ . o
L , jr lr a r uc i q r e a c p
q rn
SrLqJL.

The boreu'eii for rainv,-ater recharging should be kept at least 5 mts.


-
dborre the highest-ground water table.
9. The ground r,r'aterlevel and its quality shoulci be monitore{-re-g*iat$.p1
consultation rvith Central Ground Water Authorit;' . .,t:,,!riiri;;.-::,1i.j::,
-.j-..,.r.'l:,.-
adjoinihj.i.i)i,,
10.Traffic congestionnear the entrl' and exit points fromitj!.g--r'odds
'1.,,;ri,
the proposed project site must be avoided. Parki.ag.'shoul4j,1b,,ql$ly
-#.lii;i
inteinalizedani no publicspaceshouldbe utiiized-j{1,7 :i:ii
11. A Report.on the energv
Report.on the energv consen'ation measures;gonJirming'r.to,-"_qtrgfgf'
consen'ationmeasuresieonJirmingil.tii,#1.1grg]' l::,:
:.,.:
conservationnorms ftnaJizeb1' Bureau of Energi,;{fficiencl' .shbulii b",#j ::
preparedincorporatingdetails about builciing matelia]s& techrrolo
W,R'4iL;),
Staie Level Environment Impact Assessment Authority_Karnataka
(Corstituted b.vMoEF,Govemment of inciia r:nder section3(3) of E1p)
Act, 19s6)
SEIAA 1 IND 2013 of Dobaspet4s phaseIndustrialArea.
Establishment
by KarnatakaIndustoialAreas DevelopmentBoard.
GAADB)
& U Factors etc and submit to the SEIAA, Karnataka in three months
time.
12. Energv conserv'ationmeasures like installation of CFLs/TFLs for
the
liehtine fJre
rf6frL!!5 rar. areas outslde fftg htilrt;na
outside the cL^,,1J be integral part
ouuurng snoulq of the
Projectdesign and should be in piacebefore project commissioning. Use
CFLs and rFLs should be properly collected and disposed offlsint for
recycling as per.the prevaiiing guidelinesT,rules tr *,. regulatory
authority to avoid mercury contamination. use of soiar panels"may
bL
done to the extent possible.
13' Adequate measuresshouid be taken to prevent odour problem
frcm
solid u'asteprocessingplant and STp/ETp.
14' The building shoujd have adequate distance between them to allow
movement of fresh air and passageof naturai light, air and veniilation.
15.The project authorities shail strictly .o-ply rvith the rules and
regulalions under lda^u-facture, storage and Import of Hazardous
ChemjcalsRules,1989as amended in october 1,994and
January2000.a1i
transportation of Hazardous Chemicals shall be as per the A4\iA, 79gg.
Authorization
from the KSPCBshali be obtained for coilection,keatment, storage,and
disposal of.hazardous rvastes.
16.The project authorities must strictly comply with the rules
and
regulations with regard to handling and dispoial of hazardouswastesin
accordancewith the Hazardous wastes (Management and Handiing)
Rules, 2003. Authorization from the KSpcB Lust be obtained for
collection/ treafment f storage/ disposal of hazardouswastes.
L7' Application of solar energy should be incorporated for ijlumination
of
comlno11areas/lighting for gardens and street lighting in addition to
provision for solar water heating. A hybrid system or fully solar system
for lighting and heating should be provided_ Details in this regard"
should be submitted to the SEIAA.
v 18.The individual industries shall take all necessaryclearancesincluding
Environment clearancein accordancewith the law. The projectAuthoriiy
shall incbrporate suchcondition in the leasef salecieed/Agreement.
19' The project authoritiesshall bifurcate the industrial piots ind residential
plots, rt *y with a thick and tatl vegetatirzebarrier greenbelt.
_
20. The project Authoritv shall incorp-oratea conditiJn in the prospectiye
iease/sale deed/Agreement with individuai indusiries thai ttrev also
shallabideby theconditiohs
of thisE'C'
B- GENERAL
CoNDITIoNS: .ta-;'-.-'.ftt,:.i*
-t-ri.,,i.i,
:"-
,.;,ii,i,i,
1- The project authorities shall strictly aclhereto the:itiulati-ons.-#a?lu t r- '., i,'\
^ '.:11,i
the KarnatakaStatepollution Control Board (KSpCBi ", "''' :, t,:.:
2' Nio further expansionor modifications of the;,ind'uskialarfea, shatj be \i,it,
carried out r,r'ithout prior appro'ai of the;:rsEIAA/Minis{, -*- of .1.,,'i
'
EnvironmentancrForestsas the casema1'be. #i,.- ,,'i'' ,
,,r,p,i,
,i.:.,f
The project proponent shall ulso .o*pl.,, *,itlr l;kltt-,u
i .:1. .

al,l'.t5e nt v!t.'.:i:,1.;
"i
"ntiif6ffl
t o * t:J":i
ct.Assessment Authorirv-
^SEIAA1iND2013
Fr . _r -.tv'/ suvernnentoflndiaundersection3(3.1
"lill;:;gl":lmS Karnataka
of Ep) Acr, 1986)

4{\impre-jI11:",.,,#;d#ff$'1i;H:::t""*'""J
.#!1r:#'l'.T":**:t;*+;''"#"?""',
montlil.r' complianc"
l,::."i'ru;:#
-r^^q(sLrtut,s-l;#":;:;nl:r Ec:rog,v,Bangalore.
DLdLus report shall be submitted A six
agenciesl to"-orutori'rg
5' The project proponent
sha, inform the public
that the project has
tru"rance by
,rr. siiaA and copies been
-;;'"',il
.ittt""r:1l:,llt'o*u"t"i *'u of the
websire "Th'j,u,#tn xso.u1"a
,' -ufui,l'f-u,".,.,u,
d
iTf/{::1Tk"+
avs rrom rfl,,,n or
ffithat are wirierr, , ig Tfi:*m,."".:l
in
l[tJT:f
the vern ":1'.:H:$"
urareq
";iri"1"O in
rn the region of which
w,hichone shall
c]rc, L-
h1 be
sarne shari ]o11fltl' concernedancl a copy-
: MoEF Regionar of the
KspcB/ c- office
partment of Environment "ig*-,s"r ore /
Bangalore c e.otogy,
6' The project. authoritie,
,H in_form the MoEF
t xst'cn/"tot1 Regionai office at
ileparrment
;fittt:n" or Ecology
ffi
_tr;::'i'* ::::}""*xJff
Hl"".rui#
*Ti#
T,H
";-;h" and

7' The 'EIAA,


Kar'ataka *ur revokb . or suspend
the crearance, if
B.iil5]"ff ffi: "il*lr# "'ui oo.'u
"""a,i.*r, .,otsa
tisrac
tor1,.
condirions, the
if found-riJ"r"ir"^,u, right to rtip,rtutu"liaitior.,ut
will to*piy .
^9. impie-mentthese .o"ornJ;Jt't" in a n.i" u"""l*-u.*".
The above con

;11TH::'(
and Handiing)
dti::.'#"i"Hff"ff,:'"#i:T
36 Hazardol;.w3st*
f*"""r"menr
Liabilitvt*,rru},.J'iir,
^ 31o"gwith tfelr amendmenrs
-10. ,nn
The issue a""rr.r=ril"",'L,*. :j::lic !,

lj?":,proponent
"f
to"o*","";":* ,:i!f1.iil{rl;,j:rT;
statutorycre11ce,s
11'Concealinsfactuar/ iff
ru.,.tioi^Jro-irrio.r
uit otn"r.o.,cerned
""i'rl]r"zfabricated
dara o, {orm Authorities.
failureto c"ompil'*'-rtn data and
ui.-lr t"heconditroo.
,rl.r-,rione,r
aboi,emay resuit
,^ "' "tt'u.tlctiJ',,.,.iu,
;11;:HXT#,",i,:HtT'"i"" thepro*iiions
or
72. Any. appeal against this
Nariona_lGreen Tribunaf enviroru:.r.
ri"o*rurrc
prescribedunder Section
73.O{ficials from the iO oitf.," ,,*u
Depar*";; o, ,.,r.
Regional Office ,ir^""'-;:"'
r*ii"-.,,;r*,;i HT:;ffosao,"
"r

;::1"":l*",-il.u,n"sando,.",ill,,Jtr:-#,$_:r,#:11,^,
*nr.:^:':lir:.1;'";ll,iT"?':{,i?,:,,r#;:i"^:::i::lrototents.r
Staie Levei Environment Impact Assessment Authori$,-Karnataka
/cnnciirr+arl t-'"
u," rvlocr/
MoEF, bolernmeri
Golernmeai oi ]:rdja rrndar strhon
of Ino_ i/?\ nf Ffp\ Act, 19E6)
,
SEIAA 1 iND 2013 Establishment of Dobaspet 4tn Phase hdustial Area
by KarnatakalndustoialAreasDevelopment Board(KIADB)
MoEF, Bangalore/ Department of Ecologv arLdEnvirorunent, Bangalore/
Regional Officer, KSPCB Bangalore.
14. in the case of any change(s) in the scope of the project, the project ivould
require a fresh appraisal bl'this Authorlty.
15. The Authoritv reserves the right to add aclditional safeguard measures
subsequently, rf.found necessary, and to take action inciuding revokinq
of the environment cieara.,." ,rr,d", the provisions of the E#iro;;;:
(Protection) Act, 1986, to ensure effective impiementation of the
suggested safeguard measures in a time bound and satisfactory rnanner.
16. A11 other statutory clearances such as the approvals for storage of diesel
from Chief Conlroller of Explosjves, Fire Deparlment, Civil Aviation
Department, Forest Consen'ation Ac! 1980 and Wildlife (Protection) Act,
1972 eic. shali be obtained, as applicabie bv project proponents from the
competent authorities.
i7. These stipuiations would be enJorced among others uncier the provisions
of water (Preventioir and Control of pollution) Act, 1,974, the Air
llution) act 1,981,,the Environment

i _..1, i
.,,' .i]

'".-_:r. Yours faithfully,


\.i\.,,,'
: 1,f
')'
/;
#.----1'r.,'irr41_rsr.i-/--- r
(RAMACHANDRA) --?-t
MemberSecretary,
SEIAA, Karnataka.

Copy to:
1,- The Secretary,Ministry of Environment, Forestsand Climate Change,
Indira Paryavuan BhavaryJor BaghRoad,Aiiganj,New Delhi - 110003.
2. The Comrnissioner,Bruhat Bengaluru Mahanagarapalike (BBi\{p), N.R:
Square,Bengaluru- 560002.
3. The Membo' c,.rvprqr' k'arnataka State poliution Confoj Board,
Bengaluru.
4' The APCCF, Regional Ofiice, X,{inistry of Environment & Forests (SZ),'
Kendriya sadary IV Fioor, E & F lr'ings, 12ft Main Road, Koramanqala
II Block,Bengaluru- 560034.
5. Guard File.