0% found this document useful (0 votes)
48 views3 pages

Sales Contract

This sales contract, dated March 22, 2025, is between Hangzhou K&M Textile Co., Ltd and G8 Textile Co., Ltd for the sale of 2000 meters of 100% Tencel Fabric at a total price of 10,203.2 USD. The shipment will be from Shanghai to Haiphong, Vietnam, with specific payment and documentation requirements outlined. Disputes will be settled according to international laws and arbitration procedures, and the contract is effective until the specified date.

Uploaded by

Diễmm Mii
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views3 pages

Sales Contract

This sales contract, dated March 22, 2025, is between Hangzhou K&M Textile Co., Ltd and G8 Textile Co., Ltd for the sale of 2000 meters of 100% Tencel Fabric at a total price of 10,203.2 USD. The shipment will be from Shanghai to Haiphong, Vietnam, with specific payment and documentation requirements outlined. Disputes will be settled according to international laws and arbitration procedures, and the contract is effective until the specified date.

Uploaded by

Diễmm Mii
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

SALES CONTRACT

Contract No.: 2025/3/GN


Date 22 March 2025

Between

SELLER : Hangzhou K&M Textile Co., Ltd


▪ Add : 22# Building, K7 Original park, No.506 Xingguo Road, Yuhang
District, Hangzhou, China.
▪ Tel: +8618958527212
And

BUYER: G8 Textile Co., Ltd


▪ Add : 18# Building, No 342 Dien Bien Phu Road, 17 Ward, Binh Thanh
District, Ho Chi Minh, Vietnam.
▪ Tel : +84906782304

After discussion both parties have agreed to sign this contract on the following terms
and conditions:

Article 1. COMMODITY – QUANTITY – U/PRICE - AMOUNT

No. Description of goods Quantity Unit Unit Price Amount

1 100% Tencel Fabric (size 57”) 2000 meters 4.8 9600

TOTAL FOB SHANGHAI 2000 9600


FREIGHT 603.2
TOTAL PAYMENT 10203.2
Say word: Ten thousand and two hundred and three US dollars and 2 cents

1
Article 2. SPECIFICATION AND QUALITY
Quality: 100% brand-new

Article 3. PACKING AND MARKING


Packed in export standard
Marking: “ABC” CTN No: …

Article 4. ORIGIN
Zhejiang province, China

Article 5. SHIPMENT TERMS


- Term of Delivery: CFR Haiphong
- Time of shipment: not later than 30 March 2025
- Partial shipment: Not allowed
- Transshipment: Allowed
- Loading port: Shanghai, China
- Discharging port: Haiphong, Viet Nam

Article 6. PAYMENT
By T/T within 60 days after delivery date
a) Payer: G8 Textile Co., Ltd
Banker: VIETCOMBANK (VIETNAM)
A/c: 001-654565-101

b) Beneficiary: Hangzhou K&M Textile Co., Ltd


Banker: Industrial & Commercial Bank of China (ICBC) –No.55 FuXingMenNei
Street, Xicheng District, Beijing, China. Post Code:100140.
A/c: 106-304-117-9

Article 7. DOCUMENTS REQUIRED


After shipping on board within 03 days, the Seller must send the origin documents to
the Buyer via Express Courier, included:
1/ AWB marked “Freight Prepaid” : full set 3/3
2/ Signed commercial invoice : 03 originals
3/ Detailed packing list : 03 originals
4/ Certificate of origin : 01 original and 02 copies

Article 8. ARBITRATION
All disputes arising under this contract shall be settled amicably with the
international Laws of INTERNATIONAL CHAMBER OF COMMERCE. The
disputes would be settled amicably at first. If not, the dispute shall be settled by THE
VIETNAM INTERNATIONAL ARBITRATION CENTRE (at HO CHI MINH
2
CITY) attached to THE CHAMBER OF COMMERCE AND INUSTRY OF THE
SOCIALIST – REPUPLIC OF VIETNAM.
The award of this Committee should be final and is binding to both parties.
All expenses that occurred by settlement shall be borne by party who make
mistake(s)

Article 9. FORCE MAJEURE


Under avoidable circumstances preventing the buyer and/or the seller from fulfilling
their commitments to this contract, one party facing force majeure cases should
inform the other by fax or telex within ten days at the latest starting, from fax or telex
date, beyond this stipulated period, the force majeure cannot be considerable.

Article 10. OTHER TERMS


- Both parties undertake to carry out complete and strictly this contract, if there are
any difficulties, both parties will discuss to solve problems, and any change must
be confirmed by written form.
- This contract comes into effect from the signing date to March 22, 2025
- This contract is made into 02 copies in English, each side keep 01 copy, having
the same value.

ON BEHALF OF THE SELLER ON BEHALF OF THE BUYER

Hangzhou K&M Textile Co., Ltd G8 Textile Co., Ltd


Add : 22# Building, K7 Original park, Add : 18# Building, No 342 Dien Bien
No.506 Xingguo Road, Yuhang District, Phu Road, 17 Ward, Binh Thanh District,
Hangzhou, China. Ho Chi Minh, Vietnam.

You might also like