0% found this document useful (0 votes)
1K views13 pages

Exam 1

The document outlines various EHS (Environmental Health and Safety) standards and responsibilities for subcontractors in the Southern Africa Region. It includes questions regarding mandatory signs, vehicle inspection frequency, working at heights, excavation safety, and EHS management system implementation. Additionally, it addresses true/false statements related to EHS policies and practices, emphasizing the importance of safety measures and compliance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views13 pages

Exam 1

The document outlines various EHS (Environmental Health and Safety) standards and responsibilities for subcontractors in the Southern Africa Region. It includes questions regarding mandatory signs, vehicle inspection frequency, working at heights, excavation safety, and EHS management system implementation. Additionally, it addresses true/false statements related to EHS policies and practices, emphasizing the importance of safety measures and compliance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

3. Which colours clearly express the Mandatory signs?

A. Triangle: a black symbol on a yellow triangle with black enclosure

B. Circle: a blue disc with the symbol in white

C. Rectangle: a white symbol or text on a green background

D. Circle: a red annulus and slash symbol on a white background with the symbol in
black

4. According to Southern Africa Region EHS Standard: Which of the below


statements does not defines the subcontractors’ routinely EHS
responsibilities?

A. Provide and replace PPE and other protective equipment in a timely manner.

B. Test employees hearing impairment with audiometer on site

C. Develop management regulations and operation guides for high-risk operations.

D. Regular maintenance of vehicles

5. How often should an Engineer or Driver completes the vehicle inspection where the vehicle is
used frequently in the project?

A. Monthly

B. Daily basis

C. Weekly

D. On request

6. Which of the following statements is Correct about SAR EHS standards regarding working at
heights?

A. The tower worker must be equipped with complete PPE, including but not limited to
full-body safety ropes, no-cap brim (or small-size hat brim design), high-altitude safety
helmets, double-hook safety ropes, positioning safety ropes, anti-skid gloves, anti-skid
safety shoes, and other safety tools. Ensure that the tools are safe and available.
B. Do not stand or work in the dangerous area or under the tower.

C. The personnel working on the road must wear the PPE, including the reflective vest,
anti-skid shoes, and gloves.

7. Why is it mandatory to implement EHS management system and to enforce it across all projects?

A. Any protruding nails can harm workers or stumble

B. None of the above

C. Comfortable work

D. Meeting the requirements of EHS laws

8.
Please read carefully before agree to the following:
A. Agree

9. What is considered as the minimum height for working at heights team to start implementing Fall
protection Plan requirements?

A. 2.0m

B. 1.8m

C. 3.0m

D. 2.5m

10. Which of the following statements is Correct about Southern Africa Region EHS standards
regarding excavation?

A. The personnel working at heights and carrying a passpot must have valid third-party
qualification certification.

B. All workers must receive safety training related to excavation operations. Personnel
who operate special equipment on site must have the certificate for operating the
equipment.

C. Do not stand or work in the dangerous area or under the tower.


D. The construction site must be marked with safety signs and isolated with warning
tapes.

11. According to Southern Africa Region EHS Standard: For Major


subcontractor problems that may occur for the first time, which action must be
taken?

A. Suspend the team for one Month

B. Suspend the team for one week

C. Issue warning letter to the team

Multiple answer questions

12. To work safely on site, the project team needs to consider the Inclement/local
weather condition, such as:

A. Humidity

B. Wind speed

C. Temperature and temperature changes

D. Snow / hail / frequency of rainfall

13. For electrical safety, the following are the correct aspects to be considered.

A. Power cables with open wires is allowed to be put on the ground

B. Damaged component of power must be replaced in time

C. Not allow overload for power cable

14. According to Southern Africa Region EHS Standard: Which of the below statements defines the
subcontractors routinely EHS responsibilities

A. Management personnel qualification


B. Develop management regulations and operation guides for high-risk operations.

C. Regular maintenance of vehicles

D. Provide and replace PPE and other protective equipment in a timely manner.

15. On-site EHS Risk Assessment process will include?

A. EHS risk monitoring

B. EHS Risk evaluation

C. EHS Risk control/Prevention

D. EHS Risk identification

16. From the options below, select what can be incorrect safe practices seen in the
picture.

A. No barricading nets/cones on site

B. Teams working without PPE

C. Loose metal bars all over the place

D. Lack of professionalism on site due to unsafe practices


17. Indicate what hazards can the below Forklift Operator be
exposed to

A. No safety harness

B. The top cover of the forklift not covered fully

C. Operator not wearing PPE

D. The risk of falling objects

18. Delivery EHS Absolute Rules include the following:

A. Never undertake any trenching or excavation activities unless competent and/or


experienced to do so.

B. Never continue working on site after clocking out or without clocking from Huawei
clocking system (ISDP)

C. Never exceeding speed limit, use a handheld cellphone whilst driving, drive without
seat belt, travel as a passenger at the back of the bakkie/LDV , Or while fatigued.
D. Never work outdoor during dark hours that you can’t see from far, especially at night.

E. Always wear a helmet when travelling on, or operating a motorbike and have license.

F. Never carry out electrical work on electrical equipment, circuits and gear if you are
not qualified.

G. Never climb without safety harness, on inclement weather or unfinished structure


(Not RFI)

19. Indicate what hazards can the below working at heights


technician be exposed to

A. Working without fastening work position belt

B. No trauma step fitted on safety harness


C. Climbing with worn out safety harness

D. Climbing without hooking double lanyard hooks

E. High risk of falling

20. The Health and safety risks associated with RF (Radio-Frequency) exposure on telecom
equipment are:

A. Interaction with medical equipment(Implants)

B. RF interaction with the human body

C. Interference with safety-related electronics

D. Fuel and flammable atmospheres

21. According to Southern Africa Region EHS Standard: Which of the following statements form
part of Southern Africa Region EHS subcontractor suspension rules?

A. The first critical SCAR is suspended for one week, the second one for two weeks, the
third one for one month, and the fourth one in the blacklist.

B. Two minor SCARs are upgraded to one major SCAR, and two major SCARs are
upgraded to one critical SCAR.

C. PMs of the same subcontractor shall be blacklisted if his team receive more than two
critical SCARs.

D. For subcontractors with incomplete EHS management system, the rep office can
take management measures such as SCAR, share adjustment, and cooperation
termination based on the evaluation.

E. For subcontractors with EHS accidents, the rep office can extend the suspend period
based on the accident level.

F. The accumulative SCAR quantity of subcontractors and PMs is refreshed every year.

G. After the suspension period, based on the subcontractor's improvement measures,


and EHS re-certification is passed. The rep office can decide whether to resume their
work.
H. For teams to have their suspension lifted, they must be related to the customer.

True or false questions


22. The EHS responsibility rest upon on-site Worker, Subcontractor, Huawei and Customer.

True

False

23. EHS Policy is not important for Huawei Technologies, only car insurance
is very important.

True

False

24. There is Huawei EHS ISDP Smart-QC and it is only for ISDP purpose but it should never be
implemented on site

True

False

25. Before start of work in any project, all Team members need to pass an EHS exam and sign the
commitment letter. Only then, they can be allowed to work.

True

False

26. The maximum speed limit on a freeways/highways in a vehicle that is


OBD installed is 120km/hr, according to Huawei rules.

True

False
27. When a Team Leader is found using a fake certificate, he will get a warning letter
True
False

28. The purpose of implementing EHS Management is to ensure that work is performed safely,
successful delivery of project and improve customer satisfaction.

True

False

29. The vehicle Driver must take 20 minutes break of resting for fatigue management according to
Huawei rules.

True

False

30. It is only the Driver who must put on the seat belt but not all vehicle passengers

True

False

31. The Project team can request to be exempted from complying with EHS absolute rules when
local resource is limited. Meaning to work without adhering to Delivery Absolute rules.

True

False

You might also like