Work-Details
Work-Details
, HISAR
S.No. Work Description Unit
Fabrication of Structural work with I-Beam,
1 MT
Channel & angle
Fabrication of Structural & equipment using
2 MT
plates
Fabrication of Furnace shell, (WBF, HCF, BAF,
3 PAF & Equipments) & Allied Equipments MT
Page 1 of 11
JSL LTD. , HISAR
S.No. Work Description Unit
Erection & alignment of Foundation
bolts,anchor bolts,insert plates,nosing
40 angles,pipe sleevs etc.at all hieghts and depth MT
Page 2 of 11
JSL LTD. , HISAR
S.No. Work Description Unit
Hydraulic pipe line formation, installation and
commissioning with ferrule fittings. Tools and
tackles in the scope of contractor. No separate
charges for pipe laying,Clamping,testing. Inch x Dia x
66 C Applicable for above and below ground. Rates
Meter
for size below 1 inch shall be same as rate for
1 " size.
Page 3 of 11
JSL LTD. , HISAR
Digging of earth pit preparation 4" x 40ft deep & fixing of earth
13 electrode covering of plate with later of salt & char coal, refilling the EA
soil.
Digging of earth pit preparation 6" x 40ft deep & fixing of earth
14 electrode covering of plate with later of salt & char coal, refilling the EA
soil.
1 Constructing one or more bricks thick walls using locally available 1st class bricks, in cement mortar
1:6 in foundations at all depths below plinth level as per drawings and specifications including M3
scaffolding & curing complete
2 Same as above, but in Super-Structure above plinth level upto 3M height M3
3 Same as above, but in Super-Structure above plinth level from 3M to 6M height M3
4 Same as above, but in Super-Structure above plinth level from 6M to 9M height M3
G PLASTER AND FINISHING ITEMS
Sr. Work Description ( Only Aggregate & Bricks will be in contractors scope) Unit
1 Providing and laying upto 12mm thick plaster in cement mortar 1:4 at all heights and depths to ceilings
M2
and concrete surfaces incl. Scaffolding and curing all complete.
2 Same as above, but 15mm thick on walls, columns etc. in one coat M2
H WATER PROOFING (INJECTION METHOD)
1 RAFT
… The sub base concrete (beam concrete) to be rendered smooth with 1:3 cement mortar while it is still
green. Applications of two coats of Acrylic Polymer Modified Comentitious coating over the properly
rendered surface. Providing placing & fixing nozzels of suitable dia, and length or as specified in
approximate grid pattern prior to and/or during concreting at regular intervals. Similar nozzels shall
M2
be post fixed at critical points, if so specified/required. Injecting cementitious grout with non-shrink
compound, water proofing compound in proportions as specified through nozzles under pressure by
pump, after the concrete. Sealing off the nozzles after the injection operations is over with specified
quick setting admixture admixed with cement.
2 RETAINING WALLS
…
Applications of two coats of Acrylic Polymer Modified Comentitious coating over the properly rendered
external surfaces of the retaining wall. Providing placing & fixing nozzels of suitable dia, and length or
as specified in approximate grid pattern prior to and/or during concreting at regular intervals.
Similar nozzels shall be post fixed at critical points, if so specified/required. Injecting cementitious grout M2
with non-shrink compound, water proofing compound in proportions as specified through nozzles under
pressure by pump, after the concrete. Sealing off the nozzles after the injection operations is over with
specified quick setting admixture admixed with cement.
I ROAD
1 Soling 300mm thick in two layers. M3
2 WBM 150mm thick in two layers. M3
J EARTH WORK
1 Excavation in all types of soil including all labour & equipment excavating. Lifting dressing of sides and
ramming of bottom with a lift upto 1.5m and lead upto 30m (working space and side slope shall be paid
extra and on actual).
a) Excavation through slag & earth mix or slag/atela. Cum
2 Dressing of earth including cutting & filling upto 15cm. Sqm
3 Surface dressing upto 100mm/ House Keeping. Sqm
K PLAIN CEMENT CONCRETE
1 Providing & Laying cement concrete 1:2:4 (1 Cement :
2 Stone Dust : 4 Aggregate of 20mm and down size) in coping including the cost
of centering and shuttering complete
a) 50mm thick. Sqm
2 Mixing of water proofing compound in concrete Kg
3 50mm thick Damp Proof Course with cement concrete 1:2:4 (1 Cement : 2 Stone Sqm
Dust : 4 Aggregate of 20mm and down size) Grade 80/100 with water proofing
compound over a cost of Bitumen @ 1.7 Kg/Sqm.
RCC
4 Providing and laying precast reinforced concrete 1:2:4(1 Cement : 2 Stone Dust : Cum
4 Aggregate of 20mm and down size) for trench cover with stone dust and graded
stone agg incl. Form work but excl cost of reinf Complete.
L BRICK WORK
1 Half Brick masonry in super structure in cement mortar 1:4(1 Cement : 1 Mixture of stone dust and fine
stand @ 1:3 proportion)
a) Upto Floor 2 level Sqm
2 Brick work in foundation and plinth in mud mortar Cum
M FLOORING
1 Brick on edge flooring grouted with cement mortar 1:6 (1 Cement : 6 Mixture of stone dust and fine
Sqm
sand @ 1:3 proportion)
2 Providing and laying IPS finish 150mm high skirting 20mm thick cement concrete Sqm
1:2:4 (1 Cement : 2 Stone Dust : 4 Aggregate 12.5mm and down size) finish
smooth including rounding of the junctions.
3 Providing and fixing Kota Stone slab laid over 20mm (average) thick base mortar Sqm
1:1 (1 Cement : 1 Stone Dust) laid over @ joined with gray cement slurry include.
rubbing and polishing complete.
4 Providing and fixing 20mm thick Kota Stone in skirting laid on 20mm thick base
mortar 1:3 (1 Cement : 3 Fine sand) and joined with gray cement slurry including
rubbing and polishing complete.
a) 100mm Height M
5 White Glazed Tile (size 200x100x6mm) to dado over 12mm thick bed cement Sqm
mortar 1:3 (1 Cement : 3 Fine sand) and joined with gray cement slurry # 3.3kg/
sqm including providing in white cement for jointing complete.
N DOORS & WINDOWS
Sr. Work Description ( Only Aggregate & Bricks will be in contractors scope) Unit
1 Fixing of Doors and Windows (Wood or Steel) in walls Sqm
2 Supply and placing anodized aluminum glazed doors with 5mm thick glass etc Sqm
fitted with aluminum integral glazing tubes,complete air seal,wool pile weathering
strips, handles, aluminum beveled glazing clips, stopper, tower bolts, stops
silencers etc including anchor and masonry works for their fixing with all labour,
materials, equipment scaffolding complete but excluding glazing as per drawing
specification and direction of engineer-in-charge.
3 Supply and placing anodized aluminum glazed windows with 4mm thick glass etc. fitted with
aluminum intergal glazing tubes, complete air seal, wool pipe weathering strips, handles, aluminum Sqm
beveled glazing clips, stopper, tower bolts, stops sile
4 Supply and placing anodized aluminum glazed ventilator with 4mm thick glass etc. fitted aluminum
intergal glazing tubes, complete air seal, wool pipe, weathering stips, handles, aluminum beveled Sqm
glazing clips, stopper, tower bolts, stops silencers etc. in
O FINISHING
1 Providing and applying cement plater, in all heights and level and below plinth to wall & concrete surface
including scaffolding chipping roughening of the concrete
a) 15mm thick plaster in all level in cement mortar 1:4 (1 Cement : 4 Stone Dust) Sqm
2 Extra for providing Neat Cement Punning over plaster surface Sqm
3 Rough Cast Plaster with mixture of sand & crushed stone from 2.36mm to 12.5mm nominal size dashed
over and including fresh plaster in 2 layer 12mm thick cement plaster 1:3 (1 Cement : 3 Fine Sand) Sqm
mixed with 10% finally graded hydrated lime by volume of c
4 Making Groove in Plaster RM
5 Pointing on bricks work with cement mortar 1:3 (1 Cement : 3 Fine Sand)
a) Flush Pointing Sqm
6 Distempering with Washable Acrylic Distemper (2 coat) over a coat of cement primer & preparation of
Sqm
surface by POP etc. complete.
7 Distempering with Washable Acrylic Distemper (2 coat) of White shade over a coat of cement primer &
Sqm
preparation of surface by POP etc. complete.
8 White Wash with lime to give as even shade (providing & applying)
Sqm
a) New work (three coats)
9
Finishing wall with water proofing cement paint of approved make and req shade to give an even shade
a) New work (three coat) Sqm
10 Providing and applying acrylic emulsion paint of required shade & approved make on new work
Sqm
including preparation of surface & applying a coat primer
11 Providing and applying prime coat with red oxide primer on steel surface
including primer
a) New work (one coat) Kg
12 Providing and applying wood primer on wood surface.
a) New work (one coat) Sqm
13 Providing and applying synthetic Enamel Paint on wood surface.
a) New work (two coat) Sqm
P PROOFING
1 Painting top of roof with bitumen (Grade 80/100) @ 17kg/10sqm Sqm
2 10mm thick (one) phuska of damped earth on roof laid to slope consolidated & plastered with 20mm Sqm
thick mud mortar mixed with busha @ 35kg/cum of earth & gobri looping with 1:1 (1 Clay : 1 Cow dung)
& leveled with flat type of brick grouted with cement mor
3 Providing Gola 75x75mm in cement concrete 1:2:4 (1 Cement : 2 Stone Dust : 4 Agg. 10mm & down
RM
size) including finishing with cement mortar 1:3 (1 Cement : 3 Finde Sand) complete.
4 Providing and applying Screeding upto 50mm over roof
a) Cement mortar 1:2 (1 Cement : 2 Stone Dust) Sqm
Q MISCELLANEOUS WORKS
1 Providing and applying 2 coats of 20/30 bitumen @ 1.5 kg/sqm over PCC Sqm
2 Providing and laying 100 microns polythene sheet over PCC (0.15 kg/sqm) Sqm
3 Providing and laying PVC Water Stop 230mm wide & 6mm thick RM
4 Applying Grouting to pockets and under base plate with ready mix grout shrink comp '20' including
CUM
shuttering & scaffolding complete.
5 Providing and applying upto 50mm thick cement mortar grout 1:2 ( 1 Cement : 2 Stone Dust) with non-
Sqm
shrink grout under base plate including scaffolding & shuttering complete.
6 Making Pocket of size 300x300x300 mm in brick/stone wall and making good the same. Nos
7 Making Pocket of size 300x300x300 mm in Cement concrete work and making good the same. Nos
8 Dismantling the Brick Work.Tools will be in contractor scope Cum
9
Cum
Dismantling the Cement Concrete Work.(Tools will be in contractor scope,Air to be supplied by JSL)
10 Dismantling Bituminous Surface including picking up dismantled materials & stacking of the same with in
Sqm
a lead of 100m
11 Providing & Fixing GI barbed wire 12G in single line between the posts (125gms/mtr.) RM
12 Shifting of reinforcement steel/scrap including loading & unloading within the factory premises. MT
Sr. Work Description ( Only Aggregate & Bricks will be in contractors scope) Unit
13 Making exhaust opening (circular). Each
14 Cleaning of Pockets. No.
15 Making water connection with existing pipe line Each
16 Shifting of debries and Malba including Loading & Unloading within the factory premises. Cum
17 Supply of Labour on demand.
Each/per day of 8hrs.
18 Supply of JCB on Hire Basis. Hour
19 Supply of Tractor & Trolly on Hire Basis. Trip
20 Supply of Dumper. Trip
21 Loading or Unloading of Cement Bags. Bags
22 Removal of Angle from Boundary Nos
23 Laying non-pressure NP3 class RCC pipes with collars jointed with stiff mixture of cement mortar in the
proportion of 1:2 (1 Cement : 2 Fine Sand) including testing of joints etc. complete.
a) 300mm dia RCC Pipe RM
b) 600mm dia RCC Pipe RM
24 Extra for False Staging over 3.0 to 6.0 mtr Shuttering. Sqm
Extra for False Staging over 6.0 to 9.0 mtr Shuttering. Sqm
Extra for False Staging over 9.0 to 12.0 mtr Shuttering. Sqm
25 Extra for Vacuum Dewatering System Flooring excluding cost of joint Filer Compund. Sqm
26 P/L Shalitex Board 20mm thick. Sqm
27 P/L Grit Wash Sqm
28 P/F PVC Rain Water Pipe 100mm dia. RM
29 P/F C.I. Rain Wate Pipe 150mm dia. RM
30 grove cutting in rcc floor and filling same (excluding cost of joint filler compound ) RM
31 P/F C.I. Rain Wate Pipe 100mm dia. RM
32 P/F PVC Rain Water Pipe 150mm dia.
R PILING
1 Piling work in ordinary soil by DMC method for 450mm dia of length 12 Mtr. below cut of level. Empty
no.
boring of Apprx. 2-6 Mtr. Upto 1 Mtr. Of boring at hard strata
2 Cost deduction for reduce depth than 12 Mtrs. Of length Mtr
3 Extra cost for the additional depth more than 12 Mtrs. Of length Mtr
4 Reinforcement MT
Please provide basic rate of following items considered for arriving above rates
Basic Rates of materials
Stone Dust CFT
Bajri CFT
Jamuna Sand CFT
Atela Stone CFT
Bricks Per 1000
JSL LTD. , HISAR