The document is a report on the 3 layers of P.E. coating applied to pipes, detailing surface preparation, coating application, offline tests, and production metrics. It includes sections for inspection data, acceptance criteria for tests, and remarks on the process. The report aims to ensure quality control and adherence to specified standards during the coating process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views2 pages

PE Inspection Formate

The document is a report on the 3 layers of P.E. coating applied to pipes, detailing surface preparation, coating application, offline tests, and production metrics. It includes sections for inspection data, acceptance criteria for tests, and remarks on the process. The report aims to ensure quality control and adherence to specified standards during the coating process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

3 LAYERS P.E.

COATING REPORT

DATE: SHIFT: INSPECTOR:

PIPE DIAMETER WALL THICKNESS

1 SURFACE PREPARATION

BARE PIPE PRE SALT SURFACE DUST SURFACE SURFACE

CLEANING HEATING CONTAMINATION CLEANLINESS LEVEL ROUGHNESS DEFECT


WASHING
1- 1- 6- 1- 1- 1- 1-

2- 2- 7- 2- 2- 2- 2-

3- 3- 8- 3- 3- 3- 3-
DEGREASING
4- 4- 9- 4- 4- 4- 4-

5- 5- 10- 5- 5- 5- 5-

2 COATING APPLICATION

F.B.E THICKNESS : P.E. ADHESIVE THICKNESS :

EXTRACTION PARAMETER PE. TOTAL THICKNESS :


COATING THICKNESS CUT BACK HOLIDAY RESIDUAL PIPE
REMARKS
VISUAL CHECK CHECK CHECK TEST MAGNETIC MARKING

1- 1- 1- 1- 1- 1-

2- 2- 2- 2- 2- 2-

3- 3- 3- 3- 3- 3-

4- 4- 4- 4- 4- 4-

5- 5- 5- 5- 5- 5-

4 OFFLINE P.E. TESTS


TEST ACCEPTANCE CRITERIA SAMPLE NO. TEST RESULT REMARKS

IMPACT ( 1/SHIFT)

HARDNESS ( 1/SHIFT)

PEELING 23º c ( 1/SHIFT)


PEELING 75 º c ( 1/30 pipes)
FBE (1/50 PIPES )

4 PRODUCTION
PREVIOUS P TODAY P UPDATE P
TARGET PERCENTAGE
ACC REJ ACC REJ ACC REJ

REMARKS
_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

AREA OF CONCERN
_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________
SIG.

You might also like