0% found this document useful (0 votes)
17 views7 pages

FINAAAALLLLLLLL

The document contains architectural plans for a building, including ground and second floor layouts, roof framing details, and footing, column, and beam schedules. It specifies dimensions and materials for various structural elements such as windows, doors, and footings. Additionally, it includes legends for understanding the symbols used in the plans.

Uploaded by

vyvlvyv00
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views7 pages

FINAAAALLLLLLLL

The document contains architectural plans for a building, including ground and second floor layouts, roof framing details, and footing, column, and beam schedules. It specifies dimensions and materials for various structural elements such as windows, doors, and footings. Additionally, it includes legends for understanding the symbols used in the plans.

Uploaded by

vyvlvyv00
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

1975 3949 2476

SLIDING WINDOW
( 1m x 1.6m )
Computer Room
SLIDING WINDOW 5.22 sqm.
( 0.6m x 1.6m )
President's Office
5.89sqm.

DOOR
3672

( 0.9 m x 2.1 m )

DOOR
( .9 x 2.1 )
SLIDING WINDOW
( 0.6m x 1.6m )
SLIDING
WINDOW
SLIDING DOOR ( 1.22 m x 2.1 m ) (1.5m x 1.6m)

Meeting Area
2000 30.16 sqm.
1053

SLIDING WINDOW
( 1.5m x 1.6m )

6672

LEGENDS
GROUND FLOOR PLAN Cladding

Fire Exit

Column

Concrete Wall
9050

4024

1000

5050
Rooftop
46.41

LEGENDS
SECOND FLOOR PLAN
Fire Exit

Column

Railings
S1

S1

S3

LEGENDS
ELECTRICITY AND Light

Outlets

LIGHTING LAYOUT S Switch

Running Wire
11250

7000

LEGENDS
ROOF FRAMING PLAN
Batters

Main Frame

Sub Fascia
600

450 Gutter

6000
TIE BEAM

LEGENDS
ROOF FRAMING Batters

DETAILS Main Frame

Sub Fascia
PB/RB PB/RB PB/RB

PB/RB
PB/RB

PB/RB
PB/RB
PB/RB

PB/RB
RB
PB/RB
RB

PB/RB
RB
RB

RB
RB

RB PB/RB PB/RB

FOUNDATION PLAN
FOOTING SCHEDULE

DIMENSIONS reinforcement
FOOTING ID
THICKNESS WIDTH LENGTH VERTICAL HORIZONTAL

F1 0.6 m 1m 1m 8 - 12mm 8 - 12mm

F2 0.6 m 0.9 m 0.9 m 7- 12mm 7 -12mm

F3 0.6 m 0.8 m 0.8 m 6 - 12mm 6 - 12mm

F4 0.6 m 0.8 m 1.05 m 8 - 12mm 8 - 12 mm

FOOTING SCHEDULE

DIMENSIONS reinforcement
COLUMN ID
HEIGHT WIDTH LENGTH MAIN BARS LATERAL TIES

10MM - 4 @ 0.050 m, 6
C1 4.26 m 0.25 m 0.25 m 8 - 12MM @ 0.1 m, 6 @ .15m,
rest @ .175m
10MM - 4 @ 0.050 m, 6
C2 3.65 m 0.25 m 0.25 m 8- 12MMM @ 0.1 m, 6 @ .15m,
rest @ .175m

FOOTING SCHEDULE

reinforcement
BEAM ID
WIDTH DEPTH MAIN BARS STIRRUPS

10MM - 1 @ 0.05M, 3
PB 0.3 m 0.4 m 4 @ 16MM @ 0.75M, 4 @ .1 M,
REST @ 0.15M
10MM - 1 @ 0.05M, 3
RB 0.3 m 0.4m 4 @ 16MM @ 0.75M, 4 @ .1 M,
REST @ 0.15M

FOOTING, COLUMN
AND BEAM SCHEDULE

You might also like