Draft Estimate 2026
Draft Estimate 2026
CONTENTS
Development Programme for 2025-2026
PRIORITY
LISTING OF PSIP for
PROJECTS....................................................................................................................................................................................... 7
APPENDIX XXI...............................................................................................................................................................................9
PROJECT NAME:
VOLTAGE
The Office of the Prime Minister
REGULATOR.................................................................................................................................................................................. 9
Central Administrative Services Tobago
PROJECT NAME:
AUTOMATIC
WEATHER
STATIONS..................................................................................................................................................................................... 17
PROJECT NAME:
UPGRADE OF TTMS
MOBILE
APPLICATION – AWS
DATA.............................................................................................................................................................................................. 25
PROJECT NAME:
SATELLITE PHONE
.......................................................................................................................................................................................................... 36
PROJECT NAME:
UNMANNED AERIAL
VEHICLE....................................................................................................................................................................................... 42
PROJECT NAME: ACCESS CONTROL INFRASTRUCTURE FACILITY......................................................................52
PROJECT NAME: CONTENT FILTER DEVICE..................................................................................................................62
PROJECT NAME: NETWORK CABLING INFRASTRUCTURE UPGRADE..................................................................72
PROJECT NAME: TECHNICAL CYBER SECURITY TRAINING AND CERTIFICATION.........................................81
PROJECT NAME: FAIL-OVER INTERNET SOLUTION....................................................................................................89
PROJECT NAME: INTRANET AND INVENTORY MANAGEMENT SYSTEM.............................................................99
PROJECT NAME: WIFI INFRASTRUCTURE UPGRADE (METEOROLOGICAL DIVISION).................................107
PROJECT NAME: REHABILITATION OF METEOROLOGICAL SERVICES DIVISION, TOBAGO......................117
PROJECT NAME: REFURBISHMENT AND OUTFITTING OF THE DAY-CARE AND GYM..................................132
PROJECT NAME: UPGRADE OF SECURITY INFRASTRUCTURE AT OPM-CAST..................................................142
PRIORITY LISTING OF PSIP PROJECTS
The Central Administrative Services Tobago is a Department under the Office of the Prime
Minister Trinidad and Tobago. The Office of the Prime Minister – Central Administrative
Services Tobago (OPM-CAST) is responsible for the provision of government services in
Tobago, in accordance with the Sixth Schedule of the Tobago House of Assembly (THA) Act.
The Honourable Ayanna Webster-Roy, Minister in the Office of the Prime Minister and Member
of Parliament for Tobago East has been assigned responsibility for the Central Administrative
Services Tobago.
The Department has a clear service-oriented philosophy, as it seeks to contribute to the
development of Tobago by effectively facilitating and providing central government services.
The strategic focus of OPM-CAST is therefore aligned with the second strategic theme of the
Vision 2030 National Development Strategy of Trinidad and Tobago 2016-2030 - Delivering
Good Governance and Service Excellence.
The Department seeks to be an innovative, technologically driven, service organization,
propelled by a highly skilled workforce, facilitating the sustainable development of Tobago.
OPM-CAST aims to deliver administrative, legal and meteorological services in a timely,
professional and efficient manner to the people of Tobago and are guided by the following
values:
Transparency: we function without hidden agendas and conditions, and in our interactions we
make available all information required for collaboration, cooperation, and collective decision
making.
Accountability: we accept and observe the obligation to account for our activities, to accept
responsibility for them, and to disclose the results in a transparent manner. This includes the
responsibility for money and other entrusted property.
Integrity: we are honest in all our dealings, and we can be depended on to demonstrate complete
harmony in what we say and do.
Professionalism: we perform our duties with competence, good judgment, and politeness.
Confidentiality: we can be trusted not to disclose private and secret information.
Service Oriented: we are helpful, thoughtful, considerate, and cooperative in our relationships
with internal and external clients.
APPENDIX XXI
APPENDICES
equipment and devices that are used on a daily basis to
monitor and record changes within our climate and
environment. Every piece of electrical equipment will
operate within a specified voltage range, however, not
necessarily with optimal performance.
When the Voltage level falls outside of its operational
range, some devices and/or equipment are unable to start /
operate, malfunction or become damaged. A suitable
voltage regulator will provide the required voltage stability
to protect the equipment and devices at MET.
The MET staff, Civil Aviation staff and the general public of
Trinidad and Tobago. Installing a Voltage Regulator will
provide the equipment and devices with the required protection
to operate efficiently and produce and / or disseminate
meteorological data accordingly.
Social Impact:
With the capability to better protect the meteorological devices
and equipment from voltage fluctuations and imminent damage,
the lives and livelihoods of the people of Trinidad and Tobago
can be better preserved as the MET Services Division would be
allowed to provide climatological information as required.
Environmental Impact:
Properly functioning meteorological equipment can contribute to
climatological readings that can provide the experts and the
general public with the changes in the weather patterns.
Employment Generation:
Employment of consultant to assist with drafting of tender and
contractors to install and maintain the voltage regulator and
contractors for the voltage regulator room.
Operational Analysis:
The installation of a voltage regulator at the MET Services
Division will allow for the optimal operations of the various
meteorological equipment. This will in turn increase the output
of reliable and accurate weather related information that is
disseminated to the public
Financial Analysis:
Funding will be provided by the GoTT. The price is reasonable
for the products and services. While exact returns on
investments cannot be determined at this time, due to the voltage
regulator protecting various meteorological equipment and
devices, millions of dollars can be saved as the likelihood of
replacement and repairs would be diminished.
Economic Analysis:
The benefits of the project regarding preservation of equipment
that are key in protecting lives and livelihoods national and
regionally outweigh any cost associated with the attainment of
the product.
2. PROJECT OVERVIEW
● Outputs/Targets Different end users and stakeholders can benefit greatly from the
voltage regulator, which includes:
● Monitoring and This is done by the technical staff of MET Services Division and
Evaluation consultation from Contractors
● Budget for Voltage Regulator will be covered in a timely manner by the Ministry of Finance,
i.e. Cost, Shipping and delivery, preparatory works for the equipment and the clearance costs
by broker.
● That the project will begin immediately after down payment is made.
● Forex will become available if needed
4. PROJECT CONSTRAINTS
5. PROJECT SCOPE
6. RESOURCE REQUIREMENTS
1. Personnel Staff of DIQUD, staff of the OPM-CAST, contractors,
members of the MET Services Division.
10% Upon receipt of all equipment and material - Voltage Regulator and associated components,
construction and outfitting of room for aspect of voltage regulator
30% After erection of equipment - Voltage Regulator and associated components, construction
and outfitting of room for aspect of voltage regulator
20% Final payment to Contractor upon completion of testing, commissioning and handover -
Voltage Regulator and associated components, construction and outfitting of room for aspect of
voltage regulator
Total: $653,340TTD
9. PROCUREMENT PLAN
Review
implementatio
n schedule
ITEMS
1. PROJECT FEASIBILTY
Social Impact:
Environmental Impact:
Operational Analysis:
Financial Analysis:
Economic Analysis:
2. PROJECT OVERVIEW
● Project Objectives and To equip the Crown Point Meteorological Office and to a
Goals greater extent, the MET Services Division with the ability
of accessing accurate meteorological data from various areas
of the island.
● Outputs/Targets Different end users and stakeholders can benefit greatly from
this increase of data gathered from these AWS. Some of these
can be, forecasters at the MET Services Division; insurance
companies requesting data about bad weather in an area, after
a claim has been made; agriculture, effects of climate in an
area, affecting farming; disaster management, after a bad
weather spell.
● Monitoring and Evaluation This will be done by the technical staff of MET Services
Division and consultation from Campbell Scientific.
● Project Duration Approximately one year to install the three AWS, from
receipt of equipment, acceptance and training period.
3. PROJECT ASSUMPTION
● Budget for three Campbell Scientific Automatic Weather stations will be covered in a timely
manner by the Ministry of Finance, i.e. Cost, Shipping and delivery, preparatory works for
the AWS and fencing and the clearance costs by broker.
● That the project will begin one to two months after receipt of equipment.
● Approvals will be done by Land Management for the usage of the lands for the projects.
4. PROJECT CONSTRAINTS
● Acquisition of lands that satisfies the requirements needed by the World Meteorological
Organisation (WMO) guidelines.
● Unavailability of staff at OPM-CAST with the technical capacity and other skill sets to
implement and monitor the jobs.
● Limited Meteorological to properly maintain and monitor the AWS, fences and environs.
● Unavailability of procurement officers to properly oversee procurement process.
● The expertise of the Division of Infrastructure, Quarries and Urban Development (DIQUD) is at
times requested, they may be on another project at the time of request.
● Untimely releases from the Ministry of Finance to facilitate the completion of the project within
schedule.
● Availability of foreign exchange
● Inclement weather can hamper the timeline of the project by stalling infrastructural works and
erection of the towers.
5. PROJECT SCOPE
● Name of Project: Supply, Delivery and Installation of three Campbell Scientific Automatic
Weather Stations at different locations in Tobago.
● Project Sponsor: Office of the Prime Minister/C.A.S.T.
● Project Manager: Crown Point Meteorological Service.
● Project date of commencement: Approx. September 2024.
● Project end date: Approx. August 2025.
● Attaining appropriate lands space around Tobago from the Land Management Division,
(pending).
● Sourcing and purchasing the necessary equipment from Campbell Scientific, Utah, U.S.A.
● Clearing of Equipment using a broker.
● Verification by the MET Services Division that what was purchased, was actually sent.
● Tendering process to acquire a contractor to do the infrastructural works. (fencing of
perimeter and preparation of foundation for AWS).
● Preparatory works done on the land by the contractor. Clearing of lands, drainage, digging of
holes, erection of fencing and gates, pouring of cement for the tower bases. Land dimensions
for housing equipment 60ft x 40ft. Holes to be dug for tower bases and guy wires are 3ft x 3ft
x 4ft and 2ft x 2ft x 2ft. Pouring of ready mix concrete into holes to secure bases and anchors.
● Testing of sensors by MET Services Division.
● Installation of AWS by the technicians at MET Services Division.
● Testing of Sensors in the field to verify the readings.
● Tending for maintenance of fence and AWS sites
On completion of the project the capability of receiving data that is of the standard of the WMO
will be readily accessible at the Crown Point Meteorological Office.
6. RESOURCE REQUIREMENTS
Preparatory works done on the proposed site by contractor (clearing of lands, erection of fences
and gates, drainage, digging of holes for tower bases and anchors, cementing bases and anchors)
for three AWS sites: - $1,800,000 TT.
1. After years of building a working relationship with Campbell Scientific they accept full
payment after delivery of the equipment. Preparation of equipment, shipping and clearing
can take 6-8 weeks.
3. Tendering for a suitable contractor for fencing and infrastructural works: 7-8 weeks.
5. MET Services Division technicians will install the AWS and sensors: 2 weeks.
7. Tendering for suitable contractor to maintain fence and AWS site: 7-8 weeks
NB processes 2 – 8 are repeated for each of the three AWS. This is done consecutively and not
simultaneously given the very limited resources at our disposal.
9. PROCUREMENT PLAN
Review project
objectives and
management
approach
Review
implementatio
n schedule
ITEMS
PROJECT FEASIBILITY
NEED Many different sectors, such as agriculture, fisheries, tourism and
transportation to name a few, can reap great operational benefits
when provided with accurate, localized weather data. This is in
addition to the general quality-of-life improvement afforded to the
public with access to this information. This rationale has already
guided the Trinidad and Tobago Meteorological Service in
developing a free mobile app and investing in the purchase,
installation, and maintenance of several automatic weather stations
(AWS). Meteorological Services Division Tobago, in particular,
currently maintains ten AWS with more in the pipeline. However,
the true value of these investments can only be realized if the data
generated by the AWS is made accessible and meaningfully
utilized.
Given that the Trinidad and Tobago Meteorological Service has
POSSIBLE
already created a platform with the launch of the mobile app, the
SOLUTIONS/ALTERN-
previously described need can be addressed by the development of
ATIVES
features to support the hosting of AWS data on the existing mobile
app. Through the app, persons would be able to select an AWS
and view a curated feed of data generated by that station. Similar
functionality currently exists within the app for some AWS
managed by the Trinidad and Tobago Meteorological Service’s
Piarco office. As such, work can be done to bring feature parity to
the AWS managed by the Meteorological Services Division,
Tobago.
Option 1 should be selected. While option 2 should definitely be explored, it represents a high-
risk investment and should potentially be discussed as an in-house project.
PROJECT OVERVIEW
● Project Objectives To allow for the reliable display of valid data from all existing
and Goals AWS on both the iOS and Android versions of the TT Met Office
mobile application.
Performance Data Data Frequ Who will Who will Who will Use
Indicator Source Collection ency Collect the Analyse and the Data
Method of Data Report the
Data Data
Collec
tion
Proportion of Uptime Logging by Once Automated Met Services Met Services
Successful Monitor uptime per system
Responses monitor minute
mobile app.
PROJECT ASSUMPTIONS
PROJECT CONSTRAINTS
Obtaining funding and approval for the project
PROJECT SCOPE
● Name of Project: TT Met Office App Upgrade to Include Tobago AWS
● Project Sponsor: Ministry of Finance, GoRTT
● Project Manager: Meteorological Services Division, Tobago
● Project date of commencement: October 2025
● Project end date: --
● Implementation of mechanism for fetching, validating, normalizing and formatting data
from all existing and future AWS.
● Modification of the existing mobile application to allow for the selection of an AWS and
the subsequent display of key weather parameters using clean, easily intelligible UI
elements.
ITEMS
● Implementation of a map-based view of stations.
● Implementation of uptime or health monitor functionality to measure, collate and
routinely report on the availability of AWS data via the mobile application.
RESOURCE REQUIREMENTS
4. Utilities/Energy --
Sources
5. Raw Materials --
Project Name: Upgrade of TTMS Mobile App for the Meteorological Services Division,
Tobago.
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Request Implementation
Quotation and
Sign Contract Cashflow
1.
Implementation Implementation
of the
2. functionality to
view data from
existing AWS on
Cashflow $
the TT Met
Office mobile
app.
Completion and Implementation
3. sign off
Cashflow $
ITEMS
PROCUREMENT PLAN
N.B- All the Project Planning Activities shown in the Procurement Plan should concur
with those Project Planning Activities in the Detailed Implementation Schedule and the
Project Budget Breakdown.
QUALITY PLAN
COMMUNICATION PLAN
Review
implementation
schedule
ITEMS
PROJECT FEASIBILITY
NEED The Trinidad and Tobago MET (Meteorological Services
Division) is an essential service and as such cannot be out of
communication. In the event of failure of cellular service of one
or both local networks, it is imperative that the Meteorological
Services Division be able to communicate vital information to
all its stakeholders.
The solution is the acquisition of for the moment one (1)
POSSIBLE
Hughes 9211 Portable BGAN HDR Terminals. These systems
SOLUTIONS/ALTERN-
are robust and do not require a lot of maintenance hardware
ATIVES
wise. No other feasible solutions available at the moment.
2. PROJECT OVERVIEW
● Benefit of Project To keep the MET Services Division in communication with its
stakeholders.
PROJECT CONSTRAINTS
ITEMS
PROJECT SCOPE
Name of Project: The Supply, Delivery, Programming and Training for Hughes 9211
BGAN HDR Terminal to Meteorological Services Division Crown Point Tobago.
Project Sponsor: Office of the Prime Minister-C.A.S.T.
Project Manager: Crown Point Meteorological Service.
Project date of commencement: Approx. September 2023
Project end date: Approx. January 2024
Tendering processes
Engagement of contractors
Supply, Delivery, Programming and Training
Testing, Acceptance, and handover
RESOURCE REQUIREMENTS
Personnel 3 persons, IT technician, Satellite Technician and Electronic
Technician.
Project Name
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Request Implementation
Quotations
1. Cashflow
ITEMS
Supply and Implementation
Delivery of
Equipment Cashflow $
2.
Installation and Implementation
3. programming of
equipment Cashflow
5. PROCUREMENT PLAN
Procurement of License for Sole Select TATT grants licence for the
the Transmission of Data operation or use of radio
communication service or
any radio transmitting
equipment
6. QUALITY PLAN
7. COMMUNICATION PLAN
Review
implementation
schedule
ITEMS
1. PROJECT FEASIBILITY
ITEMS
NEED Caribbean countries and economies are highly vulnerable to the
effects of climate change. Over the last decade we have seen
several areas of concern including more frequent and severe
Tropical cyclones, and changes in the duration of both the dry and
wet seasons. The Trinidad and Tobago Meteorological Service
(TTMS) is a Regional Watch Office with responsibility for 1, 942,
500km2 of aviation space some within the Caribbean region. The
organization has acknowledged the challenges presented to the
small and highly vulnerable region by climate change, and is
always seeking new methods to combat the negative impacts of
climate change in the region.
To combat these ever-changing circumstances, national
POSSIBLE
meteorological services must adapt and utilize new technologies to
SOLUTIONS/ALTERN-
improve weather prediction. One such technology that has made
ATIVES
ground-breaking strides to improve weather prediction is the use
of Drone Technology through Unmanned Aerial Vehicles
(UAEVs)/Drones. Drones have proven helpful in measuring
hourly weather status and alerting analysts of impending extreme
weather conditions. Additionally, UAEVs allows for the
attachment of sensors that can measure important meteorological
parameters such as temperature, humidity, ultraviolet levels, wind
speed and direction, essentially ensuring accurate atmospheric data
collection. Furthermore, UAEVs have now advanced to the stage
where it has the capabilities to measure various marine parameters
such as swell heights and direction.
PROJECT OVERVIEW
● Project Objectives To equip the Crown Point Meteorological Office with suitable
and Goals equipment and devices to help the Trinidad and Tobago
Meteorological Service achieve its goal or mission of providing
meteorological information and advice consistent with
international standards or the standards stipulated by its governing
body the World Meteorological Organization (WMO).
● Outputs/Targets Different end users and stakeholders can benefit greatly from the
purchase of this device, which includes:
● Monitoring and
Evaluation
Budgetary Allocation for Data Collection:
Budgetary allocation would not be required for data collection and
management to monitor and measure the progress of the project.
ITEMS
Performance Data Data Frequ Who will Who will Who will Use
Indicator Source Collection ency Collect the Analyze and the Data
Method of Data Report the
Data Data
Collec
tion
Device Report Observation Weekly Meteorologist I Meteorologist I Meteorologist I
Functionality
MET Services
PROJECT ASSUMPTIONS
Better weather
and marine
forecast.
Earlier storm
and hurricane
predictions.
PROJECT CONSTRAINTS
PROJECT SCOPE
● Name of Project: Purchase of Unmanned Aerial Vehicle (UAVs)
● Project Sponsor: Nil
● Project Manager: Meteorological Services Division, Tobago
● Project date of commencement: Approx. September – October 2024.
● Project end date: Approx. two (2) months after start date 2024.
ITEMS
● Sourcing and purchasing the device
● Acquire a license from the Civil Aviation Authority (TTCAA) and ensure that the device
is registered with them.
● Verification by the technician at MET Services Division that what was purchased, was
actually sent.
● Train staff on how to properly use the device and learn the areas of the country that are
marked as ‘No Fly Zones’ for drones.
RESOURCE REQUIREMENTS
Project Name: The Supply and Delivery of an Unmanned Aerial Vehicle for the Meteorological
Services Division, Tobago.
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Tender for the Implementation
Supply and
1. Delivery of an
Unmanned Cashflow $
Aerial Vehicle
for the
Meteorological
Implementation
Services
Division, Cashflow $
Tobago.
Implementation
Testing and
Acceptance of Cashflow
2. the Fire Safety
Implementation
System at the
MET Services
Tobago.
ITEMS
staff to operate Cashflow
Unmanned
Aerial Vehicle.
PROJECT MILESTONES
Procurement of Drone
Quality Assurance Testing
Acquisition of License from TATT
Training of Relevant Staff
PROCUREMENT PLAN
COMMUNICATION PLAN
Review
implementation
schedule
Statutory Approvals:
ITEMS
3. PROJECT FEASIBILITY
NEED Security is a critical part of our organizational infrastructure. Our current
access control system is outdated and does not provide the security and
technological resources that a modern Access Control system entails. This
means that one critical layer of our security apparatus resides in a vulnerable
state.
Stakeholder Analysis-
\EVALUATE EACH
SOLUTION/ALTERNA Stakeholder Analysis – Solution 1
TIVE The Stakeholders of this project would consist of:
⮚ Services Unit
⮚ Services unit
Operational Analysis-
Solution 1
Solution 2
⮚ With this system, our access control system will be streamlined for
efficiency and accountability.
Solutions (1) aligns with the Government’s National Development Goals and the Sustainable Development
Goals outlined in Vision 2030. Implementation of Solution No. 1 would ensure that there is accountability and
higher levels of management of secured zones.
PROJECT OVERVIEW
⮚ To ensure that our security infrastructure can adapt to future changes in technology
and business operations.
⮚ To meet newer industry standards and regulatory requirements that demand higher
security protocols.
● Project Objectives In keeping with the Government’s National Development Strategy outlined in Vision 2030,
and Goals the project goals would be in line with the Development Themes of: “Delivering Good
Governance and Service Excellence” and “Improving Productivity through Quality
Infrastructure and Transportation”.
● Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to monitor
and measure the progress of the project.
Performance Data Data Frequency Who will Who will Who will Use the
Indicator Source Collection of Data Collect the Analyze the Data
Method Collection Data Report the Data
To conduct All users Accessing Monthly ICT Unit ICT Unit & CAST
audits data from Permanent Secretary
the
platform
and using
software to
generate
reports and
other
relevant data
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION ● Recommendations for improvements would be submitted to the P.S. at the end of the project.
PROJECT ASSUMPTIONS
Project Project Project NPF NPF
Inputs 🡪 Activities 🡪 Output 🡪 National National
Output 🡪 Outcome
Quotations are
received in
accordance Quotations are Approvals
submitted to received for
with the
protocols P.S/committee payments
Preparation of Submission of
Status Reports Status
PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes:-
PROJECT SCOPE
PROJECT SCOPE
This project will support all relevant security infrastructures that are implemented at all divisions. This will
ensure that all assets and areas of interest are monitored at all times.
The project will be undertaken on a phased basis during a period of four (4) weeks. These phases include:
cabling, door infrastructure, reader installation, integration with fire alarm, integration with backup generator,
testing, and training. The tentative period is as follows: December 2024 to January 2025.
RESOURCE REQUIREMENTS
10. Pers
onnel
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Implementation
1.
Cashflow $
Implementation
Cashflow $
2.
Implementation
3.
Cashflow
4. Implementation
Cashflow
5. Implementation
Cashflow
Implementation
6.
PROJECT MILESTONES
PROCUREMENT PLAN
N.B- All the Project Planning Activities shown in the Procurement Plan should concur
with those Project Planning Activities in the Detailed Implementation Schedule and the
Project Budget Breakdown.
QUALITY PLAN
COMMUNICATION PLAN
Statutory Approvals:
● Statutory Outline Approvals
ITEMS
5. PROJECT FEASIBILITY
NEED The ability to monitor and control effectively incoming and outgoing
network traffic using a set of predetermined security rules.
Stakeholder Analysis-
EVALUATE EACH
SOLUTION/ALTERNA Stakeholder Analysis – Solution 1
TIVE The Stakeholders of this project would consist of:
⮚ ICT Unit
⮚ ICT Unit
Operational Analysis-
Solution 1
The implementation of this project will:
⮚ Monitor and record intrusion attempts and breaches. Analyze
the source, type, and frequency of these attempts to assess
security postures.
⮚ Facilitate greater efficiency and effectiveness in the
regulation and supervision of cyber-attacks.
Solution 2
The implementation of this project will:
⮚ Utilization of our network router for security purposes will
result in limited performance as it is not a security device and
does not possess the feature set for complete security control.
ITEMS
Financial Analysis- Applicable for both Solutions 1 and 2
⮚ The source of Financing will be through the GORTT.
Solutions (1) aligns with the Government’s National Development Goals and the Sustainable
Development Goals outlined in Vision 2030. Implementation of Solution No. 1 would ensure that the
possibility of data breaches on of organization's network is mitigated.
PROJECT OVERVIEW
● Project Objectives In keeping with the Government’s National Development Strategy outlined in
and Goals Vision 2030, the project goals would be in line with the Development Themes of:
“Building Globally Competitive Businesses” and “Improving Productivity through
Quality Infrastructure and Transportation”.
⮚ Data Protection: To protect meteorological data from unauthorized access
and cyber threats, ensuring the integrity and confidentiality of sensitive
weather data.
⮚ System Availability: To help maintain the availability of meteorological
systems, preventing denial-of-service attacks which could cripple the ability
to forecast and disseminate weather warnings.
⮚ Regulatory Compliance: The Meteorological division often needs to
comply with national and international data protection regulations, and
firewalls help enforce these compliance requirements by securing data
transfers.
● Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to monitor
and measure the progress of the project.
platform
and using
software to
generate
reports and
other
relevant data
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION
● Recommendations for improvements would be submitted to the P.S. at the end of the project.
● Once the project is implemented, close monitoring and evaluation will be
conducted by the ICT Unit and a report will be submitted to the PS
Quotations are
received in
accordance Quotations are Approvals
submitted to received for
with the
protocols
P.S/committee payments
Preparation of Submission of
Status Reports Status
PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes:-
PROJECT SCOPE
PROJECT SCOPE
To improve the security posture of the meteorological division by implementing a new firewall
solution to protect sensitive meteorological data and ensure reliable data communication across the
network. With the consistent increase in cyber threats and the critical nature of meteorological data
for public safety and climate research, enhancing network security is paramount.
RESOURCE REQUIREMENTS
14. Pers
onnel
Project Name
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Implementation
1.
Cashflow $
Implementation
Cashflow $
2.
Implementation
3.
Cashflow
4. Implementation
Cashflow
5. Implementation
Cashflow
Implementation
6.
PROJECT MILESTONES
PROCUREMENT PLAN
QUALITY PLAN
ITEMS
7. PROJECT FEASIBILITY
NEED Issues: The advancement of meteorological technologies, such as
high-resolution weather models, remote sensing techniques, and
numerical weather prediction systems, requires robust networking
infrastructure to handle the increased volume and complexity of data.
Effects: Currently the network at the Meteorological Division cannot
facilitate the data transmission requirements needed by a modern
weather station.
Stakeholder Analysis-
EVALUATE EACH
SOLUTION/ALTERNA Stakeholder Analysis – Solution 1
TIVE
The Stakeholders of this project would consist of:
⮚ ICT Unit
⮚ Meteorological Supervisor
⮚ Permanent Secretary
Stakeholder Analysis – Solution 2
The Stakeholders of this project would consist of:
⮚ ICT Unit
⮚ Meteorological Supervisor
⮚ Permanent Secretary
Operational Analysis-
Solution 1
The Implementation of this project will:
⮚ Improved efficiency of our network infrastructure.
⮚ Utilize internal resources to upgrade the cabling
infrastructure.
Solution 2
The implementation of this project will:
⮚ Define the objectives of the network cabling upgrade project,
such as improving network performance, enhancing
reliability, or increasing scalability.
⮚ Facilitate greater efficiency and effectiveness of our network
infrastructure as data and resources can be disseminated more
efficiently.
⮚ Conduct a cost-benefit analysis to compare the costs of
outsourcing this project.
(Independent Feasibility Study is required for projects valued over $25.0 million)
The two (2) solutions align with the Government’s National Development Goals and the Sustainable
Development Goals outlined in Vision 2030; however, it is more technically feasible to apply
Solution No. 2 as it would ensure that the Meteorological Division has an updated and modern
network infrastructure and that all required objectives are achieved.
PROJECT OVERVIEW
● Project Objectives In keeping with the Government’s National Development Strategy outlined in
and Goals Vision 2030, the project goals would be in line with the Development Themes of:
“Delivering Good Governance and Service Excellence” and “Improving
Productivity through Quality Infrastructure and Transportation”.
⮚ Upgrade network cabling infrastructure to support faster data transmission
speeds and higher bandwidth capabilities.
⮚ To ensure timely and reliable transfer of meteorological data from weather
stations, satellites, and sensors to the central data processing and analysis
systems.
sign off of
Contract
● Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to
monitor and measure the progress of the project.
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION
● Recommendations for improvements would be submitted to the P.S. at the end of the project.
● Once the project is implemented, close monitoring and evaluation will be
conducted by the ICT Unit and will be submitted to the P.S.
PROJECT ASSUMPTIONS
Quotations are
received in Quotations are Approvals
accordance submitted to received for
with the P.S/committee payments
protocols
Preparation of Submission of
Status Reports Status
PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes:-
PROJECT SCOPE
PROJECT SCOPE
This will include the following: cable installation, termination, testing, documentation, labeling, and
cleanup.
The project will be undertaken on a phased basis during a period of between 2-3 months. The
tentative period is as follows: December 2024 to February 2025.
RESOURCE REQUIREMENTS
18. Pers
onnel
21. Raw
Materials None
Project Name
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Implementation
1.
Cashflow $
Implementation
Cashflow $
2.
Implementation
3.
Cashflow
4. Implementation
Cashflow
5. Implementation
Cashflow
Implementation
6.
PROJECT MILESTONES
PROCUREMENT PLAN
QUALITY PLAN
ITEMS
9. PROJECT FEASIBILITY
NEED Cybersecurity training for ICT (Information and Communications
Technology) staff is not merely a strategic necessity; it also presents
numerous opportunities and benefits for the individuals involved and the
organization as a whole. The two main areas are as follows:
Stakeholder Analysis-
EVALUATE EACH
SOLUTION/ALTERNA Stakeholder Analysis – Solution 1
TIVE The Stakeholders of this project would consist of:
⮚ ICT Unit
⮚ Permanent Secretary
⮚ ICT Unit
⮚ Permanent Secretary
Operational Analysis-
Solution 1
⮚ Reduction in Security Incidents: Training that will lead to a
measurable decrease in security incidents, such as malware
infections, data breaches, or unauthorized access attempts.
⮚ Improvement in Incident Response: To equip ICT staff
members with the tools needed to detect, respond to, and
mitigate cybersecurity incidents effectively.
⮚ Enhanced Compliance: To ensure OPM-CAST is in
adherence to regulatory requirements and industry standards
ITEMS
related to cybersecurity.
Solution 2
The implementation of this project will:
⮚ Loss of Control: Entrusting cybersecurity management to a
third party means relinquishing some level of control over
security decisions, strategies, and implementations.
⮚ Confidentiality Concerns: Sharing sensitive information with
a third-party cybersecurity provider introduces confidentiality
risks.
The two (2) solutions align with the Government’s National Development Goals and the Sustainable
Development Goals outlined in Vision 2030; however, it is more feasible to apply Solution No. 1 as it
would ensure that the ICT personnel at OPM-CAST is exposed the most current Cyber Security
techniques currently in used to managed Cyber Security threats.
PROJECT OVERVIEW
● Project Objectives In keeping with Government’s National Development Strategy outlined in Vision
and Goals 2030, the project goals would be in line with the Development Themes of:
“Delivering Good Governance and Service Excellence” and “Improving
Productivity through Quality Infrastructure and Transportation”.
⮚ Empower ICT staff to assess, prioritize, and manage cybersecurity risks
effectively to protect critical assets and support organizational objectives.
⮚ Foster a culture of cybersecurity awareness and accountability among ICT
staff, encouraging proactive engagement and responsible behavior in
protecting organizational assets.
⮚ Promote a culture of continuous learning and adaptation to keep pace with
evolving cyber threats, emerging technologies, and changing regulatory
requirements.
Measure the
effectiveness
of ICT staff
in
maintaining
business
continuity
and
minimizing
disruption
during
cybersecurity
incidents or
emergencies.
● Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to monitor
and measure the progress of the project.
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION
● Recommendations for improvements would be submitted to the P.S. at the end of the project.
● Once the project is completed, close monitoring and evaluation would be
conducted by the ICT Unit and would be submitted to the P.S.
PROJECT ASSUMPTIONS
Ministry of
Finance
Quotations are
received in Quotations are Approvals
accordance submitted to received for
with the P.S/committee payments
protocols
Preparation of Submission of
Status Reports Status
PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes:-
PROJECT SCOPE
PROJECT SCOPE
This project will provide Technical Cyber Security training and certiciation for ICT staff members of
OPM-CAST.
The project will be undertaken over a three (3) month period. The tentative period is as follows:
October 2024 to January 2025.
RESOURCE REQUIREMENTS
22. Pers
onnel
25. Raw
Materials None
PROCUREMENT PLAN
COMMUNICATION PLAN
ITEMS
Stakeholder Analysis-
EVALUATE EACH
SOLUTION/ALTERNA Stakeholder Analysis – Solution 1
TIVE
The Stakeholders of this project would consist of:
⮚ ICT Unit
Stakeholder Analysis – Solution 2
The Stakeholders of this project would consist of:
⮚ ICT Unit
Environmental Impact-
Applicable to solutions 1
⮚ Does not apply
Applicable to solution 2
⮚ Energy Consumption: The overall environmental impact of
satellite internet infrastructure remains significant,
particularly in terms of energy consumption and emissions.
Mitigating techniques will be discussed with all regulatory
bodies and stakeholders.
Operational Analysis-
Solution 1
⮚ Network Design: Assess the design requirements for cable or
fiber-optic networks, including topology, capacity,
scalability, and coverage area.
ITEMS
⮚ Physical Installation: Evaluate the process of laying cable or
deploying fiber-optic lines, considering factors such as
trenching, aerial installation, permits, and environmental
considerations.
⮚ Equipment Installation: Analyze the deployment of network
equipment, such as switches, routers, and termination points,
to ensure optimal performance and reliability.
⮚ Quality Assurance: Implement measures to verify the
integrity of cable or fiber installations, including testing for
signal strength, attenuation, latency, and noise levels.
Solution 2
⮚ Satellite Selection: Evaluate available satellite options based
on coverage area, bandwidth capacity, latency, and service
availability to meet the requirements of our organization.
⮚ Ground Station Setup: Establish ground stations and earth
terminals for uplink and downlink communication with
satellites, considering factors such as location, antenna size,
power requirements, and regulatory compliance.
⮚ Satellite and Orbits: Consider orbital placement to optimize
coverage, minimize latency, and ensure redundancy in case
of satellite failures or malfunctions.
⮚ Network Architecture: Design the network architecture for
satellite internet delivery to maximize scalability, reliability,
and performance.
The two (2) solutions align with the Government’s National Development Goals and the
Sustainable Development Goals outlined in Vision 2030; however, it is more technologically
feasible to apply Solution No. 2 as it would ensure that OPM-CAST is less susceptible to
local outages caused by factors like weather, construction, or equipment failures that can
disrupt terrestrial networks. Additionally, redundancy in satellite networks ensures consistent
connectivity even if one satellite fails.
PROJECT OVERVIEW
● Project Objectives Implementing a satellite internet solution for (OPM-CAST) would serve several
and Goals strategic objectives aligned with ensuring efficient operational continuity, and
resilience. Here are some main objectives and goals of this project:
⮚ Establish a robust backup communication system that can operate
independently of terrestrial networks during emergencies such as natural
disasters, or infrastructure failures.
⮚ Diversification of OPM-CAST internet infrastructure that reduces single
points of failure by incorporating satellite internet as a backup or
supplementary connectivity solution alongside existing terrestrial networks.
⮚
● Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to monitor
and measure the progress of the project.
Performance Data Data Frequency Who will Who will Who will Use the
Indicator Source Collection of Data Collect the Analyze and Data
Method Collection Data Report the Data
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION
● Recommendations for improvements would be submitted to the P.S. at the end of the project.
● Once the project is implemented, close monitoring and evaluation will be
conducted by the ICT Unit and will be submitted to the P.S.
⮚ OPM-CAST
⮚ Island of Tobago
PROJECT ASSUMPTIONS
Quotations are
received in Quotations are Approvals
accordance submitted to received for
with the P.S/committee payments
protocols
Preparation of Submission of
Status Reports Status
PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes:-
PROJECT SCOPE
PROJECT SCOPE
The project scope for implementing a satellite internet solution encompasses various aspects and
deliverables required to successfully deploy and integrate the technology into the organization's
infrastructure. These are as follows:
⮚ Stakeholder Identification and Engagement
⮚ Requirements Gathering and Analysis
⮚ Infrastructure Assessment and Readiness
⮚ Satellite Terminal Deployment
⮚ Network Configuration and Optimization
⮚ Testing and Validation
⮚ Training and Knowledge Transfer
⮚ Deployment
The project will be undertaken on a phased basis during a period of (3) months. The tentative period
is as follows: November 2024 to February 2025.
RESOURCE REQUIREMENTS
26. Pers
onnel
29. Raw
Materials None
Project Name
Amounts Due
Inputs/Main
Item Current fiscal
Activities Plan 10 11 12 1 2 3 4 5 6 7 8 9
to be paid in
the next fiscal
Implementation
1.
Cashflow $
Implementation
Cashflow $
2.
Implementation
3.
Cashflow
4. Implementation
Cashflow
5. Implementation
Cashflow
Implementation
6.
PROCUREMENT PLAN
N.B- All the Project Planning Activities shown in the Procurement Plan should concur
with those Project Planning Activities in the Detailed Implementation Schedule and the
Project Budget Breakdown.
QUALITY PLAN
COMMUNICATION PLAN
Type of Purpose Target Frequency Person Mode
Information Group Responsible
Updates on the To keep the Client Client: Line Monthly Executing Report (hard
status of the abreast as to the Ministry then Agency copy and
project progress, issues, and to Ministry of electronic
financial status of Planning and copy)
the project Development
ITEMS
Stakeholder Analysis-
EVALUATE EACH
SOLUTION/ALTERNA Stakeholder Analysis – Solution 1
TIVE
The Stakeholders of this project would consist of:
⮚ ICT Unit
⮚ Meteorological Division
Stakeholder Analysis – Solution 2
The Stakeholders of this project would consist of:
⮚ ICT Unit
⮚ Meteorological Division
Operational Analysis-
Solution 1
The Implementation of this project will:
⮚ Diversify the communication channels for the dispensation of
weather information.
⮚ Improved efficiency in our wireless infrastructure.
⮚ Reduce the burden on the (LAN) by providing high-quality
and highly sophisticated wireless technology.
ITEMS
Solution 2
The implementation of this project will:
⮚ Diversify the communication channels for the dispensation of
weather information.
⮚ Implementing a router wifi infrastructure may have
limitations in terms of coverage and technology.
The two (2) solutions align with the Government’s National Development Goals and the
Sustainable Development Goals outlined in Vision 2030; however, it is more technically
feasible to apply Solution No. 1 as these devices are designed for high-performance wireless
networking, with support for the latest Wi-Fi standards and technologies. They typically
offer faster data rates, improved signal strength, and better overall performance.
PROJECT OVERVIEW
● Project Objectives In keeping with the Government’s National Development Strategy outlined in
and Goals Vision 2030, the project goals would be in line with the Development Themes of:
“Delivering Good Governance and Service Excellence” and “Improving
Productivity through Quality Infrastructure and Transportation”.
⮚ Improve Wi-Fi coverage and connectivity across the MET facility,
including offices, laboratories, and remote monitoring stations.
⮚ Enhance network performance to support data-intensive meteorological
applications, real-time monitoring, and collaboration among staff and
stakeholders.
⮚ Strengthen network security measures to protect sensitive meteorological
data, prevent unauthorized access, and mitigate cyber threats.
⮚ Facilitate future expansion and scalability to accommodate growing data
volumes, technological advancements, and evolving user needs within
MET.
Reliability
Capacity and
Scalability
● Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to
monitor and measure the progress of the project.
Network All Users Accessing Monthly Network ICT Manager ICT Unit
Speed and data from Specialist
Throughput network
devices
Coverage Area
Signal
Strength
Reliability
Capacity and
Scalability
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION
● Recommendations for improvements would be submitted to the P.S. at the end of the project.
● Once the project is implemented, close monitoring and evaluation will be
conducted by the ICT Unit and will be submitted to the P.S.
PROJECT ASSUMPTIONS
Quotations are
received in Quotations are Approvals
accordance submitted to received for
with the P.S/committee payments
protocols
Preparation of Submission of
Status Reports Status
PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes:-
PROJECT SCOPE
PROJECT SCOPE
This will include the following:
⮚ Phase 1: Needs Assessment
⮚ Phase 2: Technology Evaluation
⮚ Phase 3: Procurement
⮚ Phase 4: Order of Items by vendor
⮚ Phase 5: Installation by ICT Staff
⮚ Phase 6: Testing
⮚ Completion
The project will be undertaken on a phased basis during a period of 2-months. The tentative period is
as follows: December 2024 to February 2025.
RESOURCE REQUIREMENTS
30. Pers
onnel
The project will be undertaken on a phased basis during a period of 2-months. The tentative period is
as follows: December 2024 to February 2025.
PROCUREMENT PLAN
QUALITY PLAN
COMMUNICATION PLAN
ITEMS
1. PROJECT FEASIBILITY
NEED We currently use a physical inventory system. This system lacks accuracy, is
not efficient, is not cost-effective, and cannot be integrated with other digital
systems.
Stakeholder Analysis-
EVALUATE EACH Stakeholder Analysis – Solution 1
SOLUTION/ALTERNA The Stakeholders of this project would consist of:
TIVE Services Unit
Stakeholder Analysis – Solution 2
The Stakeholders of this project would consist of:
ITEMS
Services unit
Social Impact- Applicable to solutions 1 and 2
Has the potential to benefit the public and our entire organization.
Provides efficiency in acquiring resources
Environmental Impact- Applicable to solutions 1 and 2
Digital Systems will replace the need for record and inventory
books.
Employment Generation- Applicable to solutions 1 and 2
Does not apply
Operational Analysis-
Solution 1
Purchasing a software package from an approved supplier and
having it customized may result in limited features to achieve the
objectives of the project.
May have technical issues between the intranet vendor and 3 rd party
vendor. These issues may include matters such as programming and
integration.
Possible subscription requirements annually.
Solution 2
The implementation of this project will:
Ensure instant integration with the current intranet platform.
Ensure continuity in our intranet development.
Central repository for all crucial services
One-time cost for implementation into our system
Financial Analysis- Applicable for both Solutions 1 and 2
Source of Financing will be through the GORTT.
The two (2) solutions align with the Government’s National Development Goals and the Sustainable
Development Goals outlined in Vision 2030; however, it is more feasible to apply Solution No. 2 as it would
ensure that there is a seamless integration into our current platform and that all required objectives are achieved.
2. PROJECT OVERVIEW
Title Computerized Inventory Management System
To digitalize our current inventory system.
Background and To promote accountability with government resources
History To have the system integrated into our current Inratnet platform to centralize access
to our services and resources.
This will ensure that stock-taking and distribution are done efficiently and that at
every stage there is accountability throughout the process.
Project Objectives In keeping with Government’s National Development Strategy outlined in Vision 2030, the
and Goals project goals would be in line with the Development Themes of: “Putting People First:
Nurturing Our Greatest Asset”; “Delivering Good Governance and Service Excellence” and
“Improving Productivity through Quality Infrastructure and Transportation”.
The implementation of technology enhances the service and delivery levels of our
organization.
To provide accurate and efficient requests for information on item status by those
in authority.
Outputs/Targets Results Matrix: Please complete the following Table:
Monitoring and Budgetary Allocation for Data Collection: One percent (0%) of the Project’s
Evaluation budgetary allocation will be utilized for data collection and educational purposes to monitor
and measure the progress of the project.
Data Collection Template:
Performance Data Data Frequency Who will Who will Who will Use the
Indicator Source Collection of Data Collect the Analyze and Data
Method Collection Data Report the Data
To conduct All users Accessing Monthly Heads of Unit Heads of Unit CAST
audits data from
the
platform
and using
software to
generate
statements
and
other
relevant
reports
● Evaluation of the project will be undertaken monthly during each stage of the project.
EVALUATION ● Recommendations for improvements would be submitted to the P.S. at the end of the project.
● Once the project is implemented, close monitoring and evaluation will be
conducted by the Services Unit and will be submitted to the P.S.
3. PROJECT ASSUMPTIONS
4. PROJECT CONSTRAINTS
The following may restrict the Project from meeting the desired outcomes: -
● Non-acceptance of PSIP Project Proposal by Ministry of Planning and Development
and/or Cabinet Approval.
● Lack of understanding of the system by users
● Lack of funding for the project due to unplanned crises.
● Inability of users to access web service due to unstable internet connection.
5. PROJECT SCOPE
PROJECT SCOPE
This project will support employees by providing accurate inventory numbers and keeping products organized.
This will assist CAST in managing its stock, filling orders, and tracking abuse of resources.
The project will be undertaken on a phased basis over a period of three (3) months. The tentative period is as
follows: January 2026 to April 2026.
6. RESOURCE REQUIREMENTS
1. Personnel
2. Equipment Computer
3. Utilities/Energy Electricity
Sources
4. Raw Materials
None
Project Name
Amounts
Inputs/Main Due Current
Item
Activities fiscal to be Plan 10 11 12 1 2 3 4 5 6 7 8 9
paid in the
next fiscal
Implementation
1.
Cashflow $
Implementation
2. Cashflow $
Implementation
3.
Cashflow
4. Implementation
Cashflow
5. Implementation
Cashflow
Implementation
6.
9. PROCUREMENT PLAN
Type of Tendering Reason/ Justification
Project Planning
Process & Contract
Activity
Type
Procurement of a Contractor Sole Selection Because the current Intranet
vendor has a working knowledge
of the Intranet back-end and is
under contract until 2024 for
maintenance and development
best practice should dictate that
the same vendor be used to ensure
ease of integration and
implementation between systems.
N.B- All the Project Planning Activities shown in the Procurement Plan should concur
with those Project Planning Activities in the Detailed Implementation Schedule and the
Project Budget Breakdown.
ITEMS
PROJECT FEASIBILITY
NEED This project focuses on the rehabilitation of the Meteorological
Services Division Office, Tobago which was subject to a recent
electrical fire. Although the fire was confined to the lobby area,
soot and smoke would have spread throughout the building
causing significant damages. Therefore, comprehensive and
professional fire restoration works must be conducted to ensure
effective recovery. Certified specialists possess the expertise to
identify underlying issues that may go unnoticed, such as
concealed structural vulnerabilities or deeply embedded smoke
residues, ensuring a thorough and safe restoration process.
The project focuses on re-establishing a secure, functional, and
welcoming space for the staff of the Meteorological Services
Division, Tobago by addressing all aspects of the fire damage;
structural, smoke, water, air quality etc.
ITEMS
Operational Analysis-
ITEMS
Project Objectives and The Rehabilitation Project’s initiative is designed with clear
Goals and measurable objectives that focus on the comprehensive
restoration and improvement of all systems and superstructure
affected by the fire.
Objectives
1. “To repair all systems affected by the fire by 31st July
2025”
2. “To provide a safe and comfortable working environment
for staff by 31st July 2025”
Outputs/Targets Different end users and stakeholders can benefit greatly from
the refurbishment, which includes:
Staff at OPM-
CAST MET staff
nationally Civil
Aviation Staff
National public
Monitoring Budgetary Allocation for Data Collection:
and Budgetary allocation would not be required for data
Evaluation collection and management to monitor and measure
the progress of the project.
Data Collection Template:
This will be done by the technical staff of OPM-CAST,
MET Services Division and consultation from Contractors.
Performa Data Data Freque Who Who will Who
nc e Sour Collectio nc y of will Analyze will
Indicator ce n Data Collec and Use
Method Collecti t the Report the
on Data the Data Data
Project Miles Observatio Bi Monthly Informa Information Information
Milestones ton e n tio n Communicatio Systems
Plan Commu n Assistant Specialist
nic
ation
Assistan
t
Benefit of Project In an effort to extend the lifespan of the building and improve the
working environment at the Meteorological Services Division, it is
important to invest in rehabilitation works to restore and improve
the current working conditions at the office. These works can help
to extend the lifespan of the building and reduce the need for costly
repairs and replacements in the future and prevent any associated
workplace incidents.
ITEMS
Project Duration Approximately 6-10 months for rehabilitation works and associated
procurement processes.
Project Location Meteorological Services Division, Tobago.
PROJECT ASSUMPTIONS
Untimely releases from the Ministry of Finance to facilitate project completion within
schedule.
PROJECT SCOPE
ITEMS
PROJECT BUDGET BREAKDOWN- (Activity Based Costing)
Electrical Retrofitting
$1,000,000.00
ITEMS
DETAILED IMPLEMENTATION SCHEDULE & PROJECT MILESTONES
Ministry Head Number and Name: Head 16 - Central Administrative Services Tobago
Inputs/Main Amounts
Item Due
Activities Plan 1 1 1 1 2 3 4 5 6 7 8 9
Current
0 1 2
fiscal to be
paid in the
next fiscal
Cleanup and Implementatio
Disposal of n
Remnants Cashflow
Electrical Implementatio
n
Retrofitting
Cashflow
CCTV, Access
Control, BMS
System
Ceiling Implementatio
Restoration n
Cashflow
Painting and
Tiling Works
Automatic Door Implementatio
and Glass n
Facades Cashflow
ITEMS
PROCUREMENT PLAN
ITEMS
QUALITY PLAN
Project Quality
Quality Control Measures
Execution Assurance
Activity Measures
Procurement of Complete terms of reference and Continuous monitoring
Contractor for Rehab justification to ensure quality in by OPM CAST
works construction. personnel
Proper
documentation;
proper contract
administration
Maintenance works Strict policy to be developed to guide the Communication such
works that the Client is copied
on all correspondence
so they will be aware of
all issues
- Close monitoring
of projects by
Client
COMMUNICATION PLAN
Review
project
objectives
ITEMS
management
approach
Review
implementation
schedule
ITEMS
RISK MANAGEMENT PLAN
RISK REGISTER MATRIX
Likelihoo
d
(e.g. on a
scale 1 –
# Risk Item Mitigation Strategy Contingency Plan
10, where
a
score of
10 is
consider
ed high
and 1
low)
1 Injuries 6 Ensure that contractors encourage Proper safety policy
and workers to wear appropriate PPE and trained workmen to
Accident and Safety equipment on site must be included in the
s to be in place at all times. Tender submission
workmen
2 Falls 8 Use appropriate fall protection Regularly inspect fall
from equipment, such as safety harnesses protection equipment
height and lanyards, when working at and replace any
heights. damaged or worn
components
Provide proper training on the safe
use of ladders, scaffolding, and fall
protection equipment.
4 Injuries and 6 Areas to be cordoned off from staff All staff and employee to
accidents to and all employees be briefed of ongoing
staff and works and accessible
employees areas
ITEMS
PROJECT READINESS-
PROJECT FEASIBILTY
Social Impact:
Employment Generation:
Economic Analysis:
PROJECT OVERVIEW
Project Objectives and Goals To refurbish the day-care and gym area and
to provide a suitably operational
environment for the staff and members of the
public.
Outputs/Targets Different end users and stakeholders can
benefit greatly from the refurbishment, which
includes: Day-care services
Gym Services
PROJECT ASSUMPTION
PROJECT CONSTRAINTS
PROJECT SCOPE
RESOURCE REQUIREMENTS
Personnel
9. PROCUREMENT PLAN
Project Planning Type of Tendering Reason / Justification
Activity Process & Contract
Type
Procurement of Open Tendering Transparent process that
contractors for facilitates competitive
refurbishment works. bidding with the hope of
obtaining suitable
10. QUALITY PLAN
Proper documentation;
proper contract
administration
Technical Inspection and Approval
Specifications by Engineer in
stipulating required tests accordance with
on materials and Conditions of Contract
procedures for
executing works
(workmanship)
11. COMMUNICATION PLAN
Commence
operations
after hours of
work
2 Noise 5 Work activities that -
involve high powered
equipment that would
result in high frequency
noise should not be
scheduled during
working hours.
Injuries and 5 Area to be cordoned off -
Accidents to from staff and other
staff and personnel
other
personnel
Injuries 8 Ensure that contractor Proper safety
and encourage workers to policy and
Accidents wear appropriate PPE trained workmen
to and Safety equipment to be included in
workmen on site must be in place the Tender
at all submission
times.
Availability 10 To request consulting External
of technical engineer from DIQUD engineer to be
personal procured if
for needed.
monitorin
g
during
project
cycle
ITEMS
PROJECT FEASIBILITY
NEED An assessment of the security architecture was conducted by
the Trinidad and Tobago Police Service, Special Branch on
the 13th February 2023 at the General Administrative
Services, Main Building, Office of the Prime Minister –
Central Administrative Services Tobago.
The TTPS indicated that there are a number of security
issues at OPM-CAST, which pose numerous security risks
for staff and visitors.
The building currently houses the Honourable Minister in
the Office of the Prime Minister, Ayana Webster-Roy,
Minster of Sport, Shamfa Cudjoe, Permanent Secretary,
Earland Kent, eighty-three members of staff along with six
members of staff from the Ministry of Social Development.
The office also houses the sub treasury which stores
physical monies.
To improve the security architecture of the building and
provide a safe working environment, it is therefore important
to invest in maintenance and security upgrades to the
building.
The OPM-CAST is currently exposed to the following
threats: Trespassing
Larcen
y
Sabota
ge
These threats exist since there are no security screening and
vehicular entry devices at the building. Also, in the event of
a power outage or telecommunication outage there are no
other means of communication while the barbed wire along
the perimeter of the walls is in a derelict and dilapidated
condition.
Moreover, the Meteorological Service Division of Trinidad
and Tobago, which is a very important arm of OPM-CAST
and the general population, also has its own safety concerns.
This section offers weather-related information to the public;
sensitive and expensive gadgets located on the premises must
be secured. A new key-card control system with biometric
ITEMS
features can assist in adding a layer of security to the
premises. Many of the building’s doors are currently
unprotected and need to be secured to avoid valuable
equipment and information being taken.
ITEMS
those in the technical and accounting areas of the building.
The upgrades can enable higher system efficiency in
resource use, thereby lowering carbon footprint.
Operational Analysis-
PROJECT OVERVIEW
Title Security Upgrades to OPM-CAST and the MET Services
Division, Tobago
Background and Analysis done by the TTPS at OPM-CAST has uncovered
History that several safety issues and concerns currently plague the
institution. The building and its occupants are currently
exposed to threats such as larceny, trespassing and sabotage.
As such, the building is in dire need of a security upgrade.
At the MET Services Division, Tobago, with the current
key- card system, anyone who has access to a card that may
have been misplaced or stolen can gain access to the
building, which can result in items turning up missing.
These security upgrades will result in a safer and more
secure environment for both staff and visitors.
ITEMS
Project Objectives and To upgrade the security systems at the Office of the
Goals Prime Minister, Central Administrative Services,
Tobago and the Meteorological Services Tobago to
provide a safe working environment for the staff.
Outputs/Targets Different end users and stakeholders can benefit greatly from
the refurbishment, which includes:
Staff at OPM-
CAST MET staff
nationally Civil
Aviation Staff
National public
Monitoring Budgetary Allocation for Data Collection:
and Budgetary allocation would not be required for data
Evaluation collection and management to monitor and measure
the progress of the project.
Data Collection Template:
This will be done by the technical staff of OPM-CAST,
MET Services Division and consultation from Contractors.
Performa Data Data Freque Who Who will Who
nc e Sour Collectio nc y of will Analyze will
Indicator ce n Data Collec and Use
Method Collecti t the Report the
on Data the Data Data
Project Miles Observatio Bi Monthly Informa Information Information
Milestones ton e n tio n Communicatio Systems
Plan Commu n Assistant Specialist
nic
ation
Assistan
t
Benefit of Project Benefits of security upgrades can be numerous, and may include:
ITEMS
entering the compound may have any concealed items that can cause
harm to personnel within the building.
The fastening of safes to the floor in the Vault at OPM-CAST will
enhance safety and prevent unauthorized removal.
Currently, anyone can access the compound through the main entrance,
which causes a great safety concern. The installation of a Barrier Gate at
entrance of OPM-CAST will allow security to do an initial screening of
the vehicles driving into the compound, which will reduce the likelihood
of unwanted visitors.
Staff of both institutions can feel a sense of peace knowing that the
buildings are secure which will lead to higher levels of productivity.
Project Duration Approximately 6-10 months for security upgrades and associated
procurement processes.
Project Location Office of the Prime Minister and the Meteorological Services Division,
Tobago.
PROJECT ASSUMPTIONS
Name of Project: The Upgrade of the Security Systems at OPM-CAST and the
Meteorological Services Division, Tobago.
Project Sponsor: Office of the Prime Minister/C.A.S.T.
Project Manager: Office of the Prime Minister and Crown Point Meteorological Service.
Project date of commencement: October 2023
Project end date: August 2024
Tendering processes
Engagement of contractors
Security Upgrades
Assessment and handover
ITEMS
RESOURCE REQUIREMENTS
Personnel
ITEMS
ITEMS
PROJECT BUDGET BREAKDOWN- (Activity Based Costing)
Project Lifecycle Estimated Cost
Project Planning Activities
ITEMS
DETAILED IMPLEMENTATION SCHEDULE & PROJECT MILESTONES
Ministry Head Number and Name: Head 16 - Central Administrative Services Tobago
Inputs/Main Amounts
Item Due
Activities Plan 1 1 1 1 2 3 4 5 6 7 8 9
Current
0 1 2
fiscal to be
paid in the
next fiscal
Tender for Implementatio
Security n
Upgrades at Cashflow
OPM-CAST
and
the
Meteorologi
cal Services
Division,
Tobago.
Installation Implementatio
and n
Programming Cashflow
of the Access
Card System
at OPM-
CAST
Supply and Implementatio
Installation X- n
Ray Bag Cashflow
Scanner at
OPM-CAST.
Supply and Implementatio
Installation of n
walk-through Cashflow
scanner at
OPM- CAST.
ITEMS
Wireless Cashflow
Radio
Transmission
System to
OPM- CAST.
Supply and Implementatio
Installation n
of Automatic
Barrier
Gates at Cashflow
OPM-CAST
Fastening of Implementatio
Safes to the n
floor in the Cashflow
vault at OPM-
CAST
Supply, Implementatio
Replacement n
and Cashflow
Installation of
Razor Wire at
OPM-CAST
Supply and Implementatio
Installation n
of Cashflow
Biometric
System at
the MET
Services
Tobago.
ITEMS
PROCUREMENT PLAN
Project Quality
Quality Control Measures
Execution Assurance
Activity Measures
Procurement of Properly designed Justification to ensure Continuous monitoring
Contractor for installation quality in construction. by OPM CAST
and maintenance personnel
Proper
documentation;
proper contract
administration
Maintenance works Strict policy to be developed to guide the Communication such
works that the Client is copied
on all correspondence
so they will be aware of
all issues
- Close monitoring
of projects by
Client
COMMUNICATION PLAN
Review
project
objectives
ITEMS
management
approach
Review
implementation
schedule
Likelihoo
d
(e.g. on a
scale 1 –
# Risk Item Mitigation Strategy Contingency Plan
10, where
a
score of
10 is
consider
ed high
and 1
low)
1 Injuries 6 Ensure that contractors encourage Proper safety policy
and workers to wear appropriate PPE and trained workmen to
Accident and Safety equipment on site must be included in the
s to be in place at all times. Tender submission
workmen
2 Falls 8 Use appropriate fall protection Regularly inspect fall
from equipment, such as safety harnesses protection equipment
height and lanyards, when working at and replace any
heights. damaged or worn
components
Provide proper training on the safe
use of ladders, scaffolding, and fall
protection equipment.