CONSTRUCTION METHODOLOGY FOR BUILDING WORKS
1. INTRODUCTION
This document outlines the construction methodology for building works, adhering to relevant IS
codes and industry best practices to ensure quality, safety, and efficiency. The methodology
includes all essential steps required for the execution of the project in a systematic and compliant
manner.
2. SITE MOBILIZATION & PRELIMINARIES
- Site clearance and leveling as per IS 883.
- Establishment of temporary facilities including site office, storage, and labor accommodations.
- Arrangements for power, water, and security.
3. SURVEYING & SETTING OUT
- Benchmark establishment as per IS 456.
- Grid marking and layout verification using Total Station.
4. EARTHWORK
- Excavation as per IS 1200, considering soil conditions.
- Dewatering and shoring as required.
- Backfilling with approved material in layers, compacted to required density.
5. ANTI-TERMITE TREATMENT
- Treatment as per IS 6313, applied in layers before PCC.
6. FOUNDATION WORKS
- PCC laying followed by footing concreting as per IS 456.
- Reinforcement detailing as per IS 1786.
- Curing and quality checks before proceeding further.
7. SUBSTRUCTURE
- Plinth beam and retaining wall construction.
- Backfilling around foundations with proper compaction.
8. SUPERSTRUCTURE
- Column, beam, and slab casting.
- Formwork and scaffolding as per IS 14687.
- Concrete testing for compressive strength.
9. MASONRY WORK
- Brickwork/blockwork as per IS 1905.
- Curing and joint treatment.
10. WATERPROOFING
- Application for basement, terrace, and wet areas as per IS 2645.
- Membrane and liquid waterproofing systems.
11. ROOFING
- Slab finishing and weatherproofing.
- Insulation and drainage considerations.
12. INTERNAL FINISHES
- Plastering as per IS 1661.
- Flooring, painting, and false ceiling installation.
13. EXTERNAL FINISHES
- External plastering, painting, and façade works.
14. DOORS, WINDOWS & JOINERY
- Aluminum, wood, and UPVC installations as per IS 4021.
15. FLOORING
- Tiling, marble, granite installation as per IS 1443.
16. PLUMBING & SANITARY WORKS
- Pipe laying, fittings, and pressure testing.
- STP, rainwater harvesting as per local regulations.
17. ELECTRICAL INSTALLATIONS
- Conduiting, wiring, and fixture installations.
18. HVAC, FIRE FIGHTING & ELV SYSTEMS
- Firefighting equipment and HVAC ducting as per NBC norms.
19. EXTERNAL DEVELOPMENT
- Landscaping, road work, stormwater drainage.
20. TESTING & QUALITY CONTROL
- Cube testing, soil testing, NDT as per IS standards.
- Third-party quality audits.
21. HEALTH, SAFETY & ENVIRONMENT
- PPE usage, safety drills, emergency response plan.
22. PROJECT MANAGEMENT APPROACH
- Scheduling, reporting, risk assessment.
23. DOCUMENTATION & HANDOVER
- As-built drawings, O&M manuals, completion certificates.
24. CONCLUSION
- Summary and commitment to quality and timely completion.
This methodology is prepared as per best industry standards and IS codes for execution in a
systematic and compliant manner.