Construction Manager CV
Selvakumar mohanadoss
Mobile : 00919894608795
E-mail : selvakumarmm@hotmail.com `
Skype id : 9894608795
Summary of Experience: Presently Working For –
Total Exp. in oil & gas and marine field – 12 Years Company : S.V CONSTRUCTION, OIL AND GAS
Consultant, AP, INDIA
Overseas exp: 10 years (Dubai, Singapore, Position: CONSTRUCTION MANAGER
Indonesia
Qatar and china)
SKILL SET PROFILE SNAPSHOT
Site Engineering 12 years of experience with refineries, drilling rig, oil and gas platforms & ship
Quality management buildings projects
Construction Comprehensive knowledge of both piping, machinery & electrical in shipbuilding and
offshore platform aspect using standards like ASME and API Standards
management
Skilled in adhering to International Convention of the IMO, SOLAS, MARPOL, MLC and
Material
ABS Rule
Management
Verifying Equipment to applicable Codes & Standards, all shipyard Quality Control
Oil and gas and
Standards, including weight & dimension control, in accordance with
marine
Drawing and technical comments
Drilling rig and
In–depth experience of Classification Rules, Codes, Standards, AWS, ASME, & Flag
offshore platforms
ORGANIZATIONAL EXPERIENCE
Jan’16 - till date construction manager offshore / onshore,
Salary
SV constructions, Chennai, India : 10200/- Dhs. ( + Benefits )
Key Result Areas: Visa Status : Employment Visa
Water Line, Stiffener, Bulkhead and Old Structure Renewal of Sack Room
Starboard Bow and Leg Repair of Cracked Weld, Damage Bulkheads, Stiffener, Damage
Structure inside the Tank and Fabricate, & Install Cofferdam at Spud Can Area.
Replace Corroded Angle Stiffeners and Corroded Section of Plate & Stairway in Tanks 1,
2, 14, 15, 22, 23, 27, 28, 29, 213, 214, 219, 223, Centrifuge, and Environmental.
Destruct and Replace Corroded Plate and Structure of Ana drill and Centrifuge Deck.
Tank Repair Underneath Pump Room, Mud Pump, and Port Spud Can.
Replacement of Lifeboat Davit and Repair Corroded Spots on Pipe of Port Life Boat.
Renewal of Centre Bulkhead, Waterline, and Section of Adjacent Tank of Jetting and
Water Line.
Pipe Bay Structure Repair on Main Deck.
Lifeboat Davit replacement.
Helideck structure and stiffener
Leg Bracing Repairs and renewals of nodes.
Spud can upgrade and renewal.
1
Tank repairs.
Sack Room Deck replacement.
Fabrication & Installation of Jet line renewal.
Jacking Teeth renewal.
Pipeline Fabrication, painting and hydro testing of 3 x “(Pre-Assembled Pipe Racks)
approx. 55tonne each.
Pipe line Fabrication, painting and hydro testing of pipe work ( approx 21,000 diameter
weld inches)
Pipe line Fabrication, painting and installation of “OFF PLOT FLARE SYSTEM” and FLARE
TIPS.
Pipeline Hydro testing & Pneumatic Leak testing of new Flare System.
Nov’13 – Jan’16 New Construction Surveyor – Project Lead, American Bureau of
Shipping, Greater china division, China
Key Result Areas:
Survey this type of new building according to ABS rules and statutory requirement as
SOLAS, Load line, and MARPOL etc.
Review, witness and approve the WPS and repair procedure (including mechanical tests,
NDT) which was applied on this construction according with TOTAL specification, AWS
D1.1., ASME IX, ASME B 31.1 and ABS rules.
review the construction DWG, NDT plans, tank test plans, visual inspection for welding,
block assembly, pre-erection and erection inspection according with construction
drawings
Witness and issue the certificate for welder’s qualification (visual inspection, mechanical
test and NDT review).
Control the WPS applied in production, conform the all welders use in production are
qualified, material traceability, identification of welding consumable used according with
WPS, review the NDT report, witness to NDT (UT, MPI, PT).
Survey the topside module for structure and piping installation, inspection for PFP,
hydro-test and installation of piping
Prepared Survey reports and closely working with AC Generator Diesel Engine, Main
Engine and Auxiliary System
Assessed work measurement which was the amount of the work required for a project
Compiled daily activity report and monthly progress report
Coordinate with Piping Supervisors / sub-contractors / workers for the equipment and
materials.
Issue materials according to requirements and Company’s procedures.
Keep proper records of inventory list at all times.
REQUIREMENTS
Hands on experience in FPSO Topside module and process piping installation work.
Piping field weld and shop weld
Piping isometric, piping installation sequence, hydro test/flushing method, piping
reinstatement process, piping preservation, piping welding WPS, PQR, etc.
Piping manpower loading, piping KPI monitoring process
working knowledge of Insulation hot and cold works
Reviewed engineering drawings, layouts, diagrams, technical specifications and cost
estimates of the organization
Significant Accomplishments:
Played a major role in taking quality management measures to conclude projects on time
and within budget
Resolved major drawing and issues
2
Successfully executed key projects such as Petro Bras, Ensco and overcame quality
challenges
Received several appreciations from clients for COSCO and Cscc shipyard
Feb’12 – Nov’13 TRAGS, Doha as Senior Construction Engineer (Offshore)
Qatar
Key Result Areas:
Initiated torqueing for the entire tie in as per approved procedure: operation of X-mas
Tree Gate valves, Swab/crown, upper master, lower master, wing valves (operating &
closing), surface safety valve, adjustable choke valve, and SSV/shutdown valve SDV,
Choke Manifold, upstream, by-pass positive choke valve, and Adjustable choke valve and
down changing of chokes. Oil & Gas pipe manifold-port side or starboard side valves
Worked on pipe line flow lines, work of separator, conditions of test, production
separator, 3 phase (Gas, oil & water) separator, Pressure Control Valve PCV, oil level
controller, gas pressure controller, changing of orifice plates, taking separator reading,
flowing well fluid through separator, bypassing opening and closing of manual low
torque valves
Generated load out list and load out plan for DSV installation campaign
Provided assistance and support to Yard Installation Engineer during load out operation
Adhered to HSE & QA procedures, JSA and HAZID meeting for high risk job
Feb’08 – Feb’12 Keppel Offshore Marine, Singapore as Senior Officer – Superintendent
Singapore
Key Result Areas:
Conducted general surveillance on carbon & stainless steel pipe line fabrications,
installation, dimensional & orientation checks, transfer verification of heat numbers on
pipe sections before cutting
Logged heat numbers of fittings & piping on shop fabrication drawing for shop or on
board before welding
Spearheaded inspections of welds and signing off QA and owner representative
Reviewed P&ID or test block diagram for hydro test limits specified in each piping hydro
test package and performed actual line checking to ascertain safety, completeness /
readiness of hydro testing
Coordinated with the vendors on installation & commissioning all drilling system piping
such as Drilling Hydraulic Systems, HP LP Mud Systems, Mud Solid Control Systems, Bulk
Handling Systems, Base Oil & Brine System and so on
Commissioned the marine system like seawater system, leg jetting, drill water,
compressed air, firewater, sanitary water, potable water system and so on
Collaborated with vendors on installation & inspection of Derrick Mounted Vertical Pipe
Handling equipment during the Derrick Assembly and targeted towards completion
Supervised 2 lakhs dia inch spool fabrication and installation scope of work
Prepared work schedules, plans, monitored & reported progress & delays and raised
technical query to client
Mar’06 – Jun’07 Galadari Engineering Works Ltd., Dubai as Site Engineer
UAE
Key Result Areas:
Conducted MIR inspection on material & equipment as per owner specifications and
standards verification of material as per mill & test certificate
Ensured M.V.R. on material to make sure the material tally with the mill certificate;
checked dimension as per approved drawing before cutting and equipment foundation
as per equipment’s base plate dimension
3
Implemented W.Q.T as per code and standard (AWS D1.1) fit-up inspection prior to
welding levelling and dimensional inspection before and after welding
Supervised welders/welding operators and fitters in pipe installation, equipment
support installation & equipment foundations modifications
Prepared request for non-destructive testing to mark out weldment repair location after
receiving NDT report and Final documentations
Reviewed piping spool drawing and supervising the pre-fabrication of all spool
assemblies
Jun’04 – Feb’06 E.I.D. Parry India Ltd., Pudukkottai as Site Engineer
PROJECTS UNDERTAKEN
With S.V constructions
Project construction manager
Client: ONGC Kakinada
Installation of subsea structures at seabed in water depths ranging from 200
meters to 700 meters and
Subsea pipelines interconnecting subsea wells to ONGC’s onshore facilities at
Odalarevu in Andhra Pradesh.
With American Bureau of Shipping china
Project Lead for N531 PSV
Attending surveyor for CDM /CDC FPSO conversion (Client SBM & PETROBRAS)
P68 FPSO New Construction
Oil tanker -2nos, & Bulk carrier -1nos.
With Qatar gas, Qatar
Offshore construction engineer
Qatar Gas 2 Pmp offshore tie in two wells (shutdown, pre shutdown and post
shutdown scope)
Qatar Gas 2 Replacement of De-oiled caisson pipe line U-T5400 (under water
pipe )
Ras Gas Alpha –installation of new platforms and life boats
With Keppel Offshore Marine Singapore Piping Superintendent
Project Involved:
Drilling rigs 6 No’s
Ensco 8502, 8503 (semi-submersible rigs)-2 nos.
Sea drill west Calisto, west Juno (jack up rigs)-2 nos.
Rowan Norway (N class rig s)- 1 nos.
With Galadari Engineering Works: Dubai
200 mw power plant
With E.I.D. Parry India:
Project involved:
o 2 nos. 1.3000 TCD plant expansions
o 2.18 mw power generations
CADEMIC DETAILS
4
2004 B.E. (Mechanical Engineering) from Shanmugha College of Engineering,
Tamil Nadu, Bharthidasan University
1999 Diploma in Mechanical Engineering from Sri Venkateswara
Polytechnic, Tamil Nadu
OTHER QUALIFICATIONS / TRAININGS / LICENSES / CERTIFICATIONS
Advanced CDS Training from ABS Academy
Phase III (Cargo Gear) from ABS Academy
Marine Confined Space Safe Practice (CSSP) from ABS Academy
Dynamic Positioning Training Course (DP) from ABS Academy
Drilling system course from ABS Academy
Floating Storage Units (FSU) from ABS Academy
Phase III, Gauging from ABS Academy
ABS Bureau Driving Policy Training from ABS Academy
Phase III, MARPOL from ABS Academy
Phase III, MODU Rules from ABS Academy
MODU Electrical Systems and Equipment from ABS Academy
Survey Reporting 101 - New Construction from ABS Academy
Nondestructive Evaluation (NDE) from ABS Academy
Pressure Testing Curriculum) from ABS Academy
Material and Welding Inspection - Marine Surveyor (QWI) from ABS Academy
Sea Trial Safety Curriculum from ABS Academy
Total Quality Management (TQM) at ABS from ABS Academy
Step Back For Safety: Working at Heights from ABS Academy
IT SKILLS
MS Office
Windows OS
Internet Applications
PERSONAL DETAILS
Date of Birth: 30th May 1982
Languages Known: English, Hindi & Chinese (Basic)
Nationality: Indian
Marital Status: Married
No. of Dependents: 2
Visa Status: Indian
Passport No.: Z3363885
Yours faithfully
Selvakumar