SUMMARY OF CONCRETE WORKS
PARTICULARS QUANTITY
A. Ground Floor 99.25
B. Second Floor 79.71
C. Third Floor 79.71
D. Fourth Floor 79.71
E Roof Deck 61.87
F. Total 400.24
SUMMARY OF FORMWORKS
PARTICULARS QUANTITY
A. Ground Floor 601.60
B. Second Floor 700.86
C. Third Floor 700.86
D. Fourth Floor 602.54
E Roof Deck 462.68
F. Total 3068.55