Introduction
Speaker: Patrick HO OBJECTIVE
Date: 16 April 2025 To provide the basic knowledge in geotechnical
Time: 6:30pm to 9:00pm (2.5 hours) training which is needed for those with less than
2 years of relevant experience being qualified to
ABOUT THIS CLASS be TCP T3 for GIFW and Building Works with
This is the 5th class in the series (Topic 4 of 7) Significant Geotechnical Content in accordance
of “Top-up Course for TCP T3 on GIFW and with Table 8.6 of “Code of Practice for Site
Building Works with Significant Geotechnical Supervision 2009”.
Content”. You will learn about the essential
contents of Geoguide 2 – “Guide to Site TARGET AUDIENCE
Investigation” and Geoguide 3 – “Guide to Rock Graduate engineers, engineering geologists,
and Soil Descriptions”, applications and technical inspection supervisors and engineers
requirements of these two guides. in related professions.
Organiser: HKIE Geotechnical Division
2
Hello!
I am Patrick HO,
an engineering geologist with
BSc (Earth Sciences, HKU)
MSc (Applied Geoscience, HKU)
FGS CGeol
I am now working in GEO,
CEDD. You can find me at
pcsho@cedd.gov.hk
3
What are Geoguides?
When and why to use them?
How to get them?
5
“
A recommended standard of good
practice in Hong Kong
6
7
Other Standards
Hong Kong
8
Hierarchy
1st LAW Ordinance and Regulation
Code of Practice, Technical
2nd CODE Memoramdum and Circular
GUIDELINE Technical Guidance Note, Geoguide
3rd and Geospec
4th LOCAL REPORT GEO Reports and GEO Publications
5th REFERENCE Book, Paper and Other Countries’
Codes
6th SELF VIEW Own Knowleage, Experience and
Professional Judgement
9
10
CoP for Site
Supervision 2009
(2024 Edition)
11
PNAP 49
12
PNRC 46
13
14
Scheduled Area No 1 (Mid-levels Area)
Scheduled Area No. 2
(North-Western Part of the New Territories)
15
Scheduled Area No. 3
(Railway Protection Areas)
Scheduled Area No. 4
(Ma On Shan Area)
16
Scheduled Area No. 5
(The Sewage Tunnel Protection Areas)
Designated Area of Northshore Lantau
17
Free of charge
electronic copy
(in PDF format)
available from the
CEDD website
www.cedd.gov.hk
18
19
Available in English only except for Geoguide 5
20
21
22
https://www.cedd.gov.hk/eng/publications/geo/geoguides/index.html