Modified SLD

The document is a single line diagram for the LT system at Sakchi Water Works, detailing various electrical components including incoming power sources, breakers, and motors. It includes specifications for different substations, transformers, and motor ratings, as well as connections to various pumping stations. The diagram also notes that all electrical equipment is subject to specific construction and fabrication guidelines.

Uploaded by

anushree16patra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Modified SLD

The document is a single line diagram for the LT system at Sakchi Water Works, detailing various electrical components including incoming power sources, breakers, and motors. It includes specifications for different substations, transformers, and motor ratings, as well as connections to various pumping stations. The diagram also notes that all electrical equipment is subject to specific construction and fabrication guidelines.

Uploaded by

anushree16patra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

KEY SINGLE LINE DAIGRAM


DWG NO TITLE:
LT system
LEGENDS
W.S.S INCOMING Scrubber
A
INCOMING
SINGLE LINE DIAGRAM
FROM
System ,spare
POWER R.P.H A

SAKCHI WATER WORKS


L-36
M - MOTOR
SUB-STATION
800A WATER WORKS
BIECO
6.6k.V - BREAKER
BREAKER

NEW SUB-STATION
TIE FROM 800A
L-36 BR#1 WATER WORKS BR#2
3PH,3W 6.6kV BC
SIDHGORA - BUS PT
3PH,3W 6.6kV
BIECO BIECO
S/S 6.6kV PUMP HOUSE
800A 800A
INCOMING
MCC ROOM
B FROM R.P.H L-42 LOCAL L-10
800A B
BUS-COUPLER SUB-STATION TRAFO SUB-STATION - BUS COUPLER
BR#5 BREAKER
3PH,3W 6.6kV 3PH,3W 6.6kV 800A 800A 800A
BREAKER BREAKER BREAKER
PH#6
1250A 1250A
6.6/440V BREAKER BREAKER
1000kVA
3PH,4W 415 V
BR#9 BR#8 BR#7 BR#6 motors 1,2,3,4 are
SONARI L-10 L-9 L-9 BR#4 BR#3 1250A to sidhgora
800A 1250A connected with
S/S S/S S/S S/S 800A 800A pump house
800A 800A 800A 800A 1 MGD new BREAKER VVFD starters
3PH,3W 6.6kV
BUS PT
reservoir (160kW)

alstom
C
400A VCB HT TIE
given to FH-6 C
M M
for both motors FEEDER L-10
LTDB (all electrical
315kW 315kW TR#2 TR#1 L#2 SUB-STATION,KADMA
SUB-STATION
equipments Air
800A 800A
800A 800A PUMPING STATION INCOMING WATER WORKS INCOMING blower,Air
750kVA 750kVA 3PH,3W 6.6kV
FROM L-36
6.6k.V
FROM NEW Compressor,
SUB-STATION SUB-STATION
400A 400A Clariflocculator,Ele
400A 400A 800A 800A
BREAKER 3PH,3W 6.6kV BREAKER ctric hoists(3T,2T),
6.6/ LTG,250kVA Sludge
440V 6.6/440V
BREAKER#1
800A
BUS COUPLER BREAKER#1
pump,stilling
M M M M 800A 800A chamber,remote
D D
controlling panels
150kW 220kW 220kW 220kW 3PH,4W 415 V
6.6kV/440V 6.6kV/440V
TRANSFORMER TRANSFORMER

PRE- TREATM ET
1000kVA 1000kVA
800A

GHT

NG DB
STREET LI

DB POW ER
L-10 ,S/S

BLOW ER
INCOMING#1 INCOMING#2

M OTOR
CE
bus coupler 1250A

SPARE

SPARE
PLANT

W ELDI
(TR#1) LT PANEL (TR#2)
TATANAGAR PUMING OFFI 1250A 1250A
STATION (WTP) BUS COUPLER
3PH,3W 6.6kV 3PH,4W 415 V 3PH,4W 415 V
E
E
VACUUM VACUUM VACUUM VACUUM VACUUM
TIE BREAKER all the breakers are
CONTACTOR#1 CONTACTOR#2 CONTACTOR#5 CONTACTOR#4 CONTACTOR#3 1000A 1000A 1000A 1250A 1000A 1000A 1000A
400A 400A 400A 400A 400A
(NC) replaced by 1250A

6.6/0.44kV 6.6/0.44kV 6.6/0.44kV M M 3MGD SPARE M


500kVA 500kVA 500kVA
DB-1&2 given to security
LIGHTING 3MGD,185kW room DB
3MGD 3MGD BFREAKER MOTOR#1 LT TIE (BETWEEN
M M M M M MOTOR#3 MOTOR#2
PH#6 & L-10)
185kW 185kW
MOTOR#1 MOTOR#2 MOTOR#5 MOTOR#4 MOTOR#3
336kW 336kW 336kW 336kW 336kW
F
F

CENTRAL PUMPING STATION TIE FROM


L#10 L#9
L-9 SUB-STATION P.C.C 440V SUB-STATION
1250A
all breakers are
1250A
SUB-STATION
NC BUS COUPLER replaced with
NC DO NOT SCALE
1250A
3PH,4W 415 V 3PH,4W 415 V 1250A breakers
NC
3PH,4W 415 V 3PH,4W 415 V
NO JUSCO
MCB MCB MCB MCB MCB SAKCHI WATER WORKS
TIE TO 1000A 1000A 1000A 1000A 1000A
NC CENTRAL PUMPING
G STATION G

M M M M KEY SINGLE LINE DAIGRAM


M new
OUT GOING MOTOR#1 MOTOR#3 MOTOR#2 SAKCHI PUMP
MOTOR
tatana ADDITIONAL 250kW 250kW 250kW MOTOR#4
SONARI gar FILTER PLANT 185/187kW
185kW
pump FILE NAME :
CONSULTING ENGINEERS LIMITED
house MUMBAI
’P’ (PRELIMINARY) ISSUES ARE NOT TO BE
FOR R0 ISSUE ONLY CLEARED USED FOR CONSTRUCTION / FABRICATION
BUT ARE ISSUED FOR LIMITED PURPOSES
ISSUE REVISIONS DRN APPD DATE
ONLY AS INDICATED IN THE SMALL BLOCK
DATE (R0 ISSUE)
CLEARED CHEM CIVIL ELEC I&C MECH AT THE TOP RIGHT HAND CORNER OF APPROVED
THE TITLE BLOCK. SCALE: NTS
DEPT SIGNATURE DATE CONSTRUCTION / FABRICATION WORK IS
DATE (CURRENT ISSUE)
H PERMITTED ON ’R’ (RELEASED) ISSUES
CHEM ONLY. OFFICE-DISC:DJ:EL
21-02-2011
H
CIVIL INFORMATION CONTAINED WITHIN ’HOLD’
IS NOT RELEASED FOR CONSTRUCTION/
DRN: MD.I.I

ZE- A2
FABRICATION. FIELD MUST GET
ELEC
DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY
I&C ISSUE
CONSTRUCTION/FABRICATION WORK RELATED DWG
CHD: A.S

SI
TO ’HOLDS’.
MECH NO

FILE NAME: F042R4.DWG TCE FORM NO. 042 R4


9
1 2 3 4 5 6 7 8 10

You might also like