INPUT Location D&D: Main beam, 1st Floor 8m span
M 328 kNm fcu 40 N/mm² gc =
ßb 1 fy 460 N/mm² gs =
span 8000 mm Comp cove 48 mm to main reinforcement
h 500 mm Tens cover 40 mm to main reinforcement
bw 300 mm Side cover 35 mm to main reinforcement
bf 1420 mm
hf 175 mm Section locINTERIOR SPAN
Tens Ø 25 mm Section ty T BEAM
Top steel 2 no & Ø 12
OUTPUT D&D: Main beam, 1st Floor 8m span
d = 500 - 40 - 25/2 = 447.5 mm
K' = 0.156 > K = 0.029
(3.4.4.4) z = 447.5(0.5 + (0.25 - 0.029 /0.9)^½) = 432.7 > 425.1 mm
(3.4.4.4) x = (447.5 - 425.1) /0.45 = 49.7 mm .
(3.4.4.4) As = 328.00E6 /425.1 /460 x 1.05 = 1761 mm² .
PROVIDE 4 T25 bottom = 1963 mm² .
(Eqn 8) fs = 2/3 x 460 x 1,761 /1,963 = 275.1 N/mm²
(Table 3.11Comp mod factor = 1 + 0.168 /(3 + 0.168) = 1.053 < 1.5
(Table 3.10Tens mod factor = 0.55 + (477 - 275.1) /120 /(0.9 + 1.153) = 1.370 < 2
(3.4.6.3) Permissible L/d = 20.8 x 1.053 x 1.370 = 30.001
(3.4.6.1) Actual L/d = 8000 /447.5 = 17.877 ok ok
1.5
1.05
ain reinforcement
ain reinforcement
ain reinforcement