TGC-MTB-CVL-ITP-
Document No:
0001
TROJAN GENERAL CONTRACTING LLC
Revision 00
INSPECTION AND TEST PLAN
Date DD-MM-YYYY
DATE Prepared by Checked by Checked by Checked by
INSPECTION AND TEST PLAN & CHECKLIST
TGC-MTB-CVL-ITP-0001-Rev.00
DESCRIPTION
INSTALLATION OF LOCAL AREA NETWORK AND SECURITY SYSTEM (LAN)
for MIDFIELD TERMINAL BUILDING (MTB)
ABU DHABI-UAE
REV
For Approval NAME NAME NAME NAME
Position Position Position Position
0 24-Nov-2021 Description
(Subcontractor) (Company) (Company) (Company)
Signature
REV DATE Checked by Checked by Checked by Checked by
Hamze Danis Van
Abdalhakim Mike De
For Approval Abdalla Der
Ghazal Westhuizen
Bruin
0 24-Nov-2021 Project QA/QC HSSE Sr. Project
Description Engineer Manager Manager Manager
(TGC) (TGC) (TGC) (TGC)
Signature
TGC-MTB-CVL-ITP-
Document No:
0001
TROJAN GENERAL CONTRACTING LLC
Revision 00
INSPECTION AND TEST PLAN
Date DD-MM-YYYY
FORMS INDEX
LIST OF ATTACHED FORMS
Reference Rev Description
LAN and Security Systems
TGC-MTB-ICT-FM-0003A 0
Installation Check List
LAN and Security Systems
TGC-MTB-ICT-FM-0003B 0
Installation Check List
LAN and Security Systems
TGC-MTB-ICT-FM-0003C 0
Installation Check List
LAN and Security Systems
TGC-MTB-ICT-FM-0003D 0
Installation Check List
MTB-TGC-CVL-ITP-
Document No:
000
Revision 00
PROJECT NAME: REMAINING WORKS & PRE-EXISTING DEFECT RECTIFICATION for MIDFIELD TERMINAL
BUILDING (MTB)
Page Page 3 of 4
TROJAN GENERAL CONTRACTING
INSPECTION & TEST PLAN
DESCRIPTION
Inspection and Acceptance
Test /Inspection Criteria and Report Reference
No. Activity Description Reference Documents Frequency Main
Requirements Subcontractor Engineer No.
Contractor
1.0 PREPARATORY WORKS
• All documents to have min: status of
Relevant drawings, ITP, Method
Code 2
1.1 statements, Material submittals are • Project Specification Prior to start the activities H H H Relevant submittal
Exceptions as Noted, Revise &
submitted and approved
Resubmit for record.
2.0 EXECUTION
2.1
2.2
MTB-TGC-CVL-ITP-
Document No:
000
Revision 00
PROJECT NAME: REMAINING WORKS & PRE-EXISTING DEFECT RECTIFICATION for MIDFIELD TERMINAL
BUILDING (MTB)
Page Page 4 of 4
TROJAN GENERAL CONTRACTING
INSPECTION & TEST PLAN
DESCRIPTION
Inspection and Acceptance
Test /Inspection Criteria and Report Reference
No. Activity Description Reference Documents Frequency Main
Requirements Subcontractor Engineer No.
Contractor