Evidence Plan
Competency Standard: Computer Systems Servicing NC II
Unit of Competency: Set-up computer networks
Ways in which evidence will be collected:
Oral Questioning
Demonstration
Written Test
Portfolio
The evidence must show that the trainees:
ASSESSMENT CRITERIA:
1.1 Determine and plan cable routes in
accordance with network design and actual / /
installation site.
1.2 Identify and obtain network materials
necessary to complete the work in accordance
/ /
with established procedures and checked against
systems requirements
1.3 Check and obtain tools, equipment and testing
devices needed to carry out the installation work
/ /
in accordance with established procedures for
correct operation and safety
1.4 Use appropriate personal protective
equipment and OHS policies and procedures are / /
followed
1.5 Perform copper cable splicing based on
Electronic Industries Alliance/Telecommunications / / /
Industry Association (EIA/TIA) standards
1.6 Install network cables and cable raceway in
accordance with established procedures and / /
installation requirements
1.7 Check and perform installation work to ensure
no unnecessary damage has occurred and / /
complies with requirements
1.8 Follow OHS standards and 5S principles
/ / /
according to enterprise requirements
1.9 Dispose excess components and materials
based on WEEE directives and 3Rs waste / /
management program
2.1 Check network connectivity of each terminal in
accordance with network design. /
2.2 Diagnose and remedy any fault or problem in
the network system in line with the standard / / /
operating procedures.
2.3 Configure network interface card (NIC) settings
in accordance with network design. /
2.4 Carry out communication checking between
terminals in accordance with OS network / / /
configuration guides
2.5 Response unplanned events or conditions to in
accordance with established procedures / /
3.1 Configure Client Device systems settings in
accordance with manufacturers’ instructions and / /
end-user preferences
3.2 Configure Local area network (LAN) port in
accordance with manufacturers’ instructions and / /
network design
3.3 Configure Wide area network (WAN) port in
accordance with manufacturers’ instructions and / /
network design
3.4 Configure Wireless settings in accordance
manufacturers’ instructions, network design and / /
end-user preferences
3.5 Configure Security/Firewall/Advance settings in
accordance with manufacturers’ instructions and / /
end user preferences.
4.1 Undertake final inspections to ensure that the
configuration done on the computer networks
conforms with the manufacturer’s / /
instruction/manual
4.2 Check computer networks to ensure safe
operation. / /
4.3 Reports are prepared/completed according to
company requirements. / / /