Document No.:
Company SETEGAP TERAJU RESOURCES SDN BHD Prepared By
PEMBINAAN FASILITI SUKAN LEMBAGA KEMAJUAN IKAN
Process/Location MALAYSIA (LKIM) DI WISMA LKIM PULAU MERANTI, PUCHONG Name Dept
SELANGOR. (INITIATION)
Approved by 1 AZLAN SSS
Date 1/01/2025 2
Risk Rating
Likelihood
Non routine
Emergency
Severity
Control Measure/
Routine
No. Area Activity Hazards Identification Consequence Existing Controls
Recommendation
ALL SITE UNDER THIS Use of PPE (helmets) Barricade the work
2 Installation of project signboard Falling objects Injury to workers or public 3 1 3
PROJECT Likelihood area
ALL SITE UNDER THIS Ensure workers wear proper Barricade the work
3 Surveying using equipment Uneven terrain Slips, trips, and falls 2 2 4
PROJECT footwear (PPE) area
Risk Rating
Likelihood
Severity
Emergency
Control Measure/
Routine
routine
No. Area Activity Hazards Identification Consequence Existing Controls
Non
Recommendation
SITE INSPECTION
ALL SITE UNDER THIS Installing contractor’s office and site TRAFFIC CONTROL barricades,
3 Falling objects Injury to workers 2 2 4
PROJECT infrastructure (FLAGMAN) supervision
PPE
Risk Rating
Likelihood
Severity
Emergency
Control Measure/
Routine
routine
No. Area Activity Hazards Identification Consequence Existing Controls
Non
Recommendation
Conduct pre-
ALL SITE UNDER THIS Use shoring and trench excavation risk
1 Excavation works Cave-ins Worker injuries or fatalities 4 2 8
PROJECT boxes, Conduct inspections assessments, Install
barricades
Conduct periodic
ALL SITE UNDER THIS Use of PPE (gloves, masks), inspectionsProvide
2 Anti-termite treatment Chemical exposure Skin or respiratory issues 3 2 6
PROJECT Proper ventilation safety training for
chemical handling
ALL SITE UNDER THIS Provide manual handling Use mechanical aids
3 Pad footing installation Manual handling Musculoskeletal injuries 2 2 4
PROJECT training, Enforce rest breaks (e.g., hoists)
ALL SITE UNDER THIS Cuts, bruises, or crushing PPE, Store materials Provide tool safety
4 Rebar installation Sharp edges, heavy materials 2 2 4
PROJECT injuries securely training
Risk Rating
Likelihood
Severity
Emergency
Control Measure/
Routine
routine
No. Area Activity Hazards Identification Consequence Existing Controls
Non
Recommendation
ALL SITE UNDER THIS Use trained operators for Conduct daily
3 Tree planting Equipment operation Equipment-related injuries 3 2 6
PROJECT machinery, barricade equipment checks
ALL SITE UNDER THIS Use proper filing equipment, Train workers on safe
6 Documentation handover Paper cuts Minor injuries to workers 1 1 1
PROJECT Ensure sufficient lighting handling practices
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING OF CONTROL (HIRAC)
Document No.:
Company SETEGAP TERAJU RESOURCES SDN BHD Prepared By
PEMBINAAN FASILITI SUKAN LEMBAGA KEMAJUAN IKAN
Process/Location MALAYSIA (LKIM) DI WISMA LKIM PULAU MERANTI, PUCHONG Name Dept
SELANGOR. (Post-Construction)
Approved by 1 AZLAN SSS
Date 1/01/2025 2
Risk Rating
Likelihood
Severity
Emergency
Control Measure/
Routine
routine
No. Area Activity Hazards Identification Consequence Existing Controls
Non
Recommendation
Conduct pre-walkthrough
ALL SITE UNDER THIS Use clear signage and
1 Final walkthrough Uneven surfaces Slips, trips, and falls hazard checks, Ensure 2 1 2
PROJECT barriers
lighting is adequate
ALL SITE UNDER THIS Schedule machinery checks Ensure only trained
4 Machinery and equipment removal Equipment malfunction Crushing injuries 4 2 8
PROJECT prior to removal, barricade operators are involved
ALL SITE UNDER THIS Use proper filing equipment, Train workers on safe
6 Compiling final report Paper cuts Minor injuries to workers 1 1 1
PROJECT Ensure sufficient lighting handling practices
Table 1: Risk Assessment Matrix.
LIKELIHOOD DESCRIPTION 1 2 3 4 5
Might be occur at
Conceivable 3 3 6 9 12 15
sometime in future
Is practically
Inconceivable impossible and has 1 1 2 3 4 5
never occurred
Table 2: OSH Risk Action
Eliminate and reduce risks by assessing OH&S opportunities to enhance OH&S performance. It could include
15-25 HIGH integrating OH&S at the earliest stage of the lifecycle of facilities, equipment or processes or moving up the
hierarchy of controls; or, improving OH&S performance during planned changes such as facilities relocation,
process redesign or replacement of machinery and plant; or, improving OH&S performance by alleviating
monotonous work or work at a pre-determined work rate using new technologies; or, improving culture by
extending OH&S competence beyond requirements or encouraging worker to report incidents in a timely manner.
Eliminate and reduce risks by assessing OH&S opportunities to enhance OH&S performance. It could include
integrating OH&S at the earliest stage of the lifecycle of facilities, equipment or processes or moving up the
5-14 MEDIUM
hierarchy of controls; or, improving OH&S performance during planned changes such as facilities relocation,
process redesign or replacement of machinery and plant; or, improving OH&S performance by alleviating
monotonous work or work at a pre-determined work rate using new technologies; or, improving culture by
extending OH&S competence beyond requirements or encouraging worker to report incidents in a timely manner.
LOW RISK :
1-4 LOW A risk identified as LOW may be considered as acceptable and further reduction may not be necessary.
However, if the risk can be resolved quickly and efficiently, control actions should be implemented and recorded.
Flowchart 1: HIRAC Flowchart
Documented criteria
Documented methodology
EHS
Yes
OH&S No
Opportunities
Head of Dept/Section
Yes
Documented OH&S
Opportunities