0% found this document useful (0 votes)
113 views168 pages

MA Solution P

MASP is an ISO 9001-2015 certified consulting company specializing in innovative infrastructure solutions, including planning, engineering, and advisory services for transportation and urban development projects. The document outlines the company's objectives, mission, range of services, team composition, key achievements, and financial information, highlighting their extensive experience in road safety audits and project management across various sectors. Additionally, it includes details on their empanelment with NHAI and a comprehensive list of projects undertaken.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views168 pages

MA Solution P

MASP is an ISO 9001-2015 certified consulting company specializing in innovative infrastructure solutions, including planning, engineering, and advisory services for transportation and urban development projects. The document outlines the company's objectives, mission, range of services, team composition, key achievements, and financial information, highlighting their extensive experience in road safety audits and project management across various sectors. Additionally, it includes details on their empanelment with NHAI and a comprehensive list of projects undertaken.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 168

www.masp.co.

in

(An ISO 9001-2015 Certified Company)


Innovative Infrastructure Solution

Address: 119, 1st Floor, Tribhuvan Complex, Delhi Mathura


Road, Ishwar Nagar, New Delhi-110065 (Near
Hotel Suryaa)
Tel: 011- 40590844
Mob: +91 9971224531
1
Email: mashkur@masp.co.in
TABLE OF CONTENT
1. CERTIFICATE OF INCORPOATION .................................................................................................................... 3
2. ISO CERTIFICATE .................................................................................................................................................. 4
3. RANGE OF SERVICES ........................................................................................................................................... 6
4. MASP TEAM .......................................................................................................................................................... 7
5. KEY ACHIEVEMENTS SO FAR............................................................................................................................ 9
6. BALANCE SHEETS .............................................................................................................................................. 10
6.1 FINANCIAL YEAR (2019-20) ............................................................................................................................ 10
6.2 FINANCIAL YEAR (2018-19) ............................................................................................................................ 11
6.3 FINANCIAL YEAR (2017-18) ............................................................................................................................ 12
7. NHAI EMPANELMENT LETTER........................................................................................................................ 13
8. LIST OF PROJECTS (Road Safety Audit) ............................................................................................................. 15
7.1 PROJECT DATA SHEETS FOR SAFETY PROJECTS ..................................................................................... 20
9. MULTI-SECTOR ADVISORY PROJECTS ........................................................................................................ 109
10. TRAFFIC, FEASIBILITY & DPR STUDIES .................................................................................................. 112
11. LIST OF PROJECTS (Detailed Design & Engineering) .................................................................................. 116
12. CVs OF KEY PERSONNELS .......................................................................................................................... 117
12.1 CV OF SR. ROAD SAFETY AUDITOR CUM TEAM LEADER .................................................................. 117
12.2 CV OF TRAFFIC PLANNER .......................................................................................................................... 137
13. CVs OF SUPPORT STAFF .............................................................................................................................. 145
13.1 CV OF Sr HIGHWAY CUM SAFETY ENGINEER ....................................................................................... 145
14. GEOGRAPHICAL REACH OF OUR SERVICES .......................................................................................... 153
15. LIST OF EMPANELMENT ............................................................................................................................. 154
16. PAN CARD OF MASP..................................................................................................................................... 155
17. CERTIFICATE OF REGISTRATION OF GST .............................................................................................. 156
18. UDYOG AADHAR REGISTRATION CERTIFICATE .................................................................................. 157
19. CAPACITY BUILDING & TRAINING ON ROAD SAFETY AUDIT (BY MASP) TO GOVERNMENT
ENGINEERS/OFFICERS ACROSS INDIA ................................................................................................................ 159
19.1 TRAINING LETTERS ..................................................................................................................................... 164

2
1. CERTIFICATE OF INCORPOATION

3
2. ISO CERTIFICATE

4
OBJECTIVE
“To develop into a premier
consulting organization to provide
Integrated & innovative solutions
for infrastructure projects in India
and abroad including Central/State
Governments, Corporates and
Multilateral & Bilateral Agencies”

MISSION
“To be the knowledge-driven
infrastructure consulting company,
making infrastructure sustainable,
promoting partnership in the
infrastructure space”.

5
3. RANGE OF SERVICES
Planning & Engineering Services
Urban & Transportation Infrastructure Planning
Traffic Management Plan including Impact Study
Road Safety Audit (Design/Construction/Completion/Pre-COD/ Operation &
Maintenance Stages)
Traffic Engineering (Surveys, Analysis & Forecasting) studies
Master Planning, Strategic Planning of Infrastructure Projects
Detailed Feasibility Studies – (including LAP/LRP/URP Study)
Detailed Project Report including Tender Documents
Detailed Design and Engineering
Environment Due Diligence and Research study
Environment and Social Impact Assessment
Construction Management & Supervision

Infrastructure Advisory services


Project Identification, Screening & Selection, Project Concept Development
Market Study, Demand Assessment, Techno-Commercial Study
Economic Analysis, Appraisal & Evaluation study
Financial Model and Viability Analysis, Project Structuring & options study
Business Research & Strategic Planning
Development of PPP Structuring and Options
Bankable Project Documentation
Financial & Transaction Advisory
Preparation of Bid Documents and Bid Process Management
Developing Sectorial Policies and Strategies
Project Appraisal and Project Due Diligence
Contract and Performance Monitoring & Evaluation
Capacity Building and Training Program
Syndication Advisory

6
4. MASP TEAM

MASHKUR AHMAD Dr. S M SARIN


(Founder-Director) Road Safety Principal Advisor-Road Safety Policy &
Audit, Transport Planning, Economic Audit (46 yrs exp)
& Financial, PPP, Capacity Building
(23 yrs exp)
PROF P K SARKAR

SHAHZAD ALAM Advisor-Transportation studies


(38 yrs exp)
Director -Syndication Advisory;
Financial Management & Structuring
(25 yrs exp)
T D ANEJA
Senior Advisor-Bridge & Structural
PRACHI GANDHI Design (38 yrs exp)

Senior Transport Planner


(4 yrs exp) SAFIKUDDIN
Highway & Safety Engineering
MANOWER ALAM (4 yrs exp)
Highway & Safety Engineering
(5 yrs exp

HIMANSHU KUMAR
PRAYAG CHOUDHARY Highway & Safety Engineering
Highway & Safety Engineering (1 yr exp)
(1 yr exp)

ABDUL MAJID NAVIN KUMAR


Highway & Safety Engineering Senior Manager- Business Development
(1 yr exp) (28 yrs exp

DEEPAK KUMAR
Highway & Safety Engineering RAVI KUMAR
(4 yr exp) Highway & Safety Engineering
(3 yr exp)

KESHAV UPADHYAY
MUDASSIR AHMAD
Highway & Safety Engineering
Assistant Engineer (2 yrs exp)
(1 yr exp)
7
Associated Experts

NAQEEB ALAM A K SINGH


Skill Development and Human Resource Chief Technical Consultant Highways
Development (40 yrs exp)
(35 yrs exp)

MUMTAZ ALAM KRUPAL BHAVSAR


Land Acquisition Plan Urban Development & Housing; Tourism,
(25 yrs exp) Transport-
(18 yrs exp)

DR SANDEEP GABHANE I R MATHUR


Environment Expert Director - Technical Retd. DDG- BRO
(28 yrs exp) (38 yrs exp)

8
5. KEY ACHIEVEMENTS SO FAR

MASP has achieved considerable diversification on sectorial basis with transportation (including highways,
urban transportation) being the core and an emerging presence in other infrastructure sectors such as tourism,
urban development, industry, railways etc. It has completed over 100 projects so far:

❖ Road Safety Audit at Detailed Design/ During Construction/Pre-COD/COD/O & M Stages for over
5000 kms of road network (50 projects)
❖ Crash/Black Spot Analysis and its improvement measures for over 200 nos.
❖ Traffic Studies including surveys, analysis and forecasting for over 6000 kilometers of road network
(40 projects)
❖ Multi-Sectorial Infrastructure Advisory services for over 25 projects in various sectors i.e. transportation,
urban development, tourism, railways, economic corridor, industries etc.
❖ Successfully Completed Transaction Advisory services to Government for Infrastructure projects with
cost over INR 400 Crores under PPP.
❖ Capacity Building & Training programme for Government officers/engineers on PPP/Road Safety Audit
to over 600 govt officers/engineers across around 12 states.
❖ Economic Analysis and Evaluation Studies for over 2000 KMS of road network (18 Projects)
❖ Financial Analysis & structuring, PPP options & Evaluation Studies for over 2000 KMS of road network
(18 Projects)
❖ Highway Design & Engineering works including technical due diligence, detailed design for over 1000
KMS of road network including hill roads, (6 projects).

9
6. BALANCE SHEETS
6.1 FINANCIAL YEAR (2019-20)

10
6.2 FINANCIAL YEAR (2018-19)

11
6.3 FINANCIAL YEAR (2017-18)

12
7. NHAI EMPANELMENT LETTER

13
14
8. LIST OF PROJECTS (Road Safety Audit)
S. PROJECTS ROLE OF MASP CLIENT
No (Highway Sector – Road Safety Audit at EPC Design, (in brief)
: Construction, Pre-COD and O&M Stages)
1. Development of Multi Lane Carriageway from Km 704.200 to Km 723.00 Design & Construction NHAI
(From Kanhan to Automotive Square) Section of Urban Link of Nagpur- stage Safety Audit
Kamptee Section of Nagpur-Jabalpur Road of NH-44 to be executed on
EPC Mode in the State of Maharashtra. EPC Contractor- KCC Buildcon
Pvt. Ltd)
2. Rehabilitation and Up-gradation of NH- 43 from Km 81.500 to Km Third Party Safety Audit PWD,
130.000 (Dhamtari- Kanker section) to two- lanes with paved shoulder in at Pre-COD stage Govt. of
the state of Chhattisgarh under NHDP- IV through Engineering, Chhattisga
Procurement & Construction (EPC) basis. EPC Contractor- Barbrik rh
Project Limited
3. Development of Two-lane Elevated Road from km 0+044 (near Liberty Design Stage Safety NHAI
Cinema) to Km 3+070 (near Mental Hospital) on Nagpur Obedullaganj Audit
Road NH-69 and from km 1+414 (Chhaoni Junction) to Km 2+260 (near
Anna sahib Gundewar College) on Katol road including development of
at grade road and junctions on EPC -Basis in the State of Maharashtra-
(EPC Contractor-KCC Buildcon Pvt. Ltd)
4. Safety Consultancy Services for “Construction of Gorakhpur Bypass from Pre - Construction and NHAI
km 79.670 of NH-29E to existing km 251.700 of NH-28 through an Design stage Safety
Engineering, Procurement and Construction (EPC) Contract under Audit
NHDP-IV in the state of Uttar Pradesh” - (EPC Contractor- Monte Carlo
Limited - Backbone Enterprise Limited (JV)
5. Safety Consultancy Services for “Widening to 4-Lane with paved Design & Construction PWD,
shoulder with CC pavement from km 256/550 to km 289/500 on Kota- stage Safety Audit Jaipur,
Darah section of NH-12 (Kota- Jhalawar Road) in the state of Rajasthan Rajasthan
on EPC mode” - (EPC Contractor-M/s Monte Carlo Limited
6. Safety Consultancy Services for “Widening and Strengthening of existing Design & Construction PWD,
2 lane carriageway to Four Lanes with paved side shoulder of Faridkot – stage Safety Audit Patiala,
Kotkapura– Bathinda Section of NH-15 [New NH No. 754] from existing Punjab
km 221.380 to km 287.615 of NH-15 in8cludingconstruction of Faridkot-
Kotkapura Bypasses in the State of Punjab under NHDP-IV on EPC
mode – (EPC Contractor- M/s GR Infra)
7. Safety Consultancy Services for “Widening and Strengthening of existing Design & Construction PWD,Pati
2 lane carriageway to Four Lanes with paved shoulder of Harike – Zira – stage Safety Audit ala,
Faridkote Section of NH-15 [New NH No. 54] from existing km 166.925 Punjab
to km 221.380 including construction of Zira, Talwandi Bhai and Mudki
Bypasses in the State of Punjab under NHDP-IV on EPC mode- (EPC
Contractor- M/s GR Infraprojects Limited)
8. Safety Consultancy Services for Construction of Bhagalpur Bypass from Design stage Safety NH
km (124.175 to km 140.200) of NH-80 in the state of Bihar on EPC mode- Audit Division,
NH Division RCD Bhagalpur-Bihar (EPC Contractor- M/s GR RCD,
Infraprojects Limited) Bhagalpur
9. Development of Four-Laning with Paved shoulder of Tallewal- Barnala Design & Construction PWD,Pati
section of NH-71 from km 114+000 to km 149+000 (NH-64) in the state stage Safety Audit ala,
of Punjab on EPC mode- (EPC Contractor- Punj Lloyd Ltd- VRC Punjab
Constructions (I) Pvt Ltd (JV)

15
S. PROJECTS ROLE OF MASP CLIENT
No (Highway Sector – Road Safety Audit at EPC Design, (in brief)
: Construction, Pre-COD and O&M Stages)
10. Rehabilitation and Up-gradation of NH- 43 from Km 180.000 to Km Third Party Safety Audit PWD,
241.000 (Bedma- Dhikonda section) to two- lanes with paved shoulder in at Pre-COD stage Govt. of
the state of Chhattisgarh under NHDP- IV through Engineering, Chhattisga
Procurement & Construction (EPC) basis. EPC Contractor- Barbrik rh
Project Limited
11. Rehabilitation and Up-gradation of NH- 43 from Km 241.000 to Km Third Party Safety Audit PWD,
298.000 (Dahikonda- Jagdalpur section) to two- lanes with paved shoulder at Pre-COD stage Govt. of
in the state of Chhattisgarh under NHDP- IV through Engineering, Chhattisga
Procurement & Construction (EPC) basis. EPC Contractor- Barbrik rh
Project Limited (Third Party Safety Audit)
12. Widening to two/ four lane with paved shoulders from km 0.00 to km Design Stage Safety PWD,
54.370 (Maharashtra border to Bidar) section of NH-50 in the state of Audit Govt. of
Karnataka on EPC Mode – Package I. EPC Contractor – Patel Karnataka
Infrastructure Pvt. Ltd
13. Consultancy Services for Independent Engineer during Operation & Road Safety during NHAI
Maintenance (O&M) Period for 4-Laning of Pune - Solapur Section of O&M stage
NH-65 from Km 40.000 to Km 150.050 in the State of Maharashtra
under NHDP Phase-III on DBFOT basis: (Length 110 km; TPC INR 1,110
Crs)
14. "Construction of Four Laning of Rai Malikpur (Haryana/Rajasthan Design Stage Safety PWD,
Border) _-Narnaul – Mohindergarh – Charkhi Dadri - Bhiwani – Kharak Audit Jind,
corridor, section from km 94.600 to 125.920 of NH- 148B in the state of Haryana
Haryana (Package-IV) on EPC Mode." (EPC Contractor- PRL Projects
& Infrastructure Ltd & Shiva Probuild Pvt. Ltd_ JV)
15. Rehabilitation and Up-gradation of Pratapgarh to Allahabad Bypass Road Design & Construction UP PWD,
Junction section of NH-96 from existing km 100/800 to km 135/230 Stage Safety Audit Allahabad
[Design Ch.100.800 to Ch. 135.500] to Four lane with paved shoulders in
the state of Uttar Pradesh on Engineering, Procurement & Construction
(EPC) Basis-(EPC Contractor- M/s GR Infraprojects Limited)
16. Rehabilitation and augmentation of New NH-354 (old-SH-25) of section Design Stage Safety NHAI
Ramdas to Gurdaspur from Design Chainage km 140.000 (existing km Audit
46.320 of SH) to Design Chainage km 187.492 (existing km 3.185 of SH)
for Length of 47.492 km into two with paved shoulder /Four-Lane under
Bharatmala scheme in the State of Punjab on EPC mode (Package-V) -
EPC Contractor- M/s CEIGAL India & IJCMPLl (J.V).
17. Safety Consultancy Services for “Rehabilitation and Upgradation of Design Stage Safety MH, PWD
Watul to Talgaon section of NH-17 (new NH-66) from existing km Audit
332/200 to 367/200 (design km 165/270 to km 198/528) in the state of
Maharashtra”), EPC Contractor-KCC Buildcon Pvt. Ltd)
18. Safety Audit Services for Four Laning of Parwanoo – Solan Section of Design & Construction NHAI
NH 22 (now NH 5) from km 67.000 to km 106.000 on EPC Mode under stage Safety Audit
NHDP Phase –III in the state of Himachal Pradesh- EPC Contractor-
M/s GR Infraprojects Limited)
19. Safety Audit Services for Six Laning of Chittorgarh-Udaipur Section of Design/Construction NHAI
NH-76 from design chainage km 214.870 to km 308.370 in the state of Stage Safety Audit,
Rajasthan (Length 93.5 km) on DBFOT (TOLL) Mode under NHDP Black spots Analysis
Phase V (Package- III)- Concessionaire- M/s UCHIT Expressways Pvt.
Ltd.
16
S. PROJECTS ROLE OF MASP CLIENT
No (Highway Sector – Road Safety Audit at EPC Design, (in brief)
: Construction, Pre-COD and O&M Stages)
20. Consultancy Services for Construction Supervision and Consultancy Pre-Construction, MoRTH/
Services for Rehabilitation and upgrading to 2 lane/2 lane with paved Construction, World
shoulders configuration and strengthening of Lalsot – Karauli Section (km Completion and Bank
0.0 to km 85.0) of NH-11 B in the state of Rajasthan- EPC Contractor- Operation/
M/s Dilip Buildcon Ltd Maintenance Stages
21. Safety Audit Services for Rehabilitation and up gradation of existing 2 Design & Construction NHAI
lane to 4-lane standards of Rimuli-Koida Section (Km.163.00 to Stage Safety Audit
Km.206.200) of NH-215 (New NH -520) in the State of Odisha under
NHDP Phase III on EPC mode” (EPC Contractor-M/s Monte Carlo
Limited)
22. Safety Audit Services for Rehabilitation and Up-gradation of Rishikesh – Design and BRO
Dharasu Road (NH-94) with 2-Lane with Paved Shoulder from Design Construction stage
Chainage Km 58.603 to Km 58.853 (Existing Chainage Km 59.420 to Km Safety Audit
59.650), from Design Chainage Km 61.630 to Km 63.950 (Existing
Chainage Km 62.630 to Km 65.000) and New Construction of 2-Lane
with Paved Shoulders Chamba Bypass of Design Length 2.035 Km
including 440m long Tunnel on EPC mode under Improvement to NH
Connectivity to Chardham in the State of Uttarakhand”. – EPC
Contractor – M/s Bharat Construction Limited
23. Safety Audit services for Widening and strengthening of OLD GT Road Design & Construction PWD
(Double Lane to 4- Lane) with Service lane from KM (CH. 3.000 to CH. Stage Safety Audit
8.280) i.e Beda Canal to SP Jain College More (Sasaram Town) in District
Rohtas in the state of Bihar under CRF for the year 2018-19- EPC
Contractor- M/s RBA Constructions
24. Safety Audit Services for Rehabilitation and Upgradation to 2 Lane/2 lane Design & Construction BRO
with Paved Shoulder configuration for design chainage Km 107.347 to Stage Safety Audit
Km 129.208 & Km 133.878 to Km 138.570 (existing chainage Km
110.000 to Km 133.020 & Km 137.330 to km 142.028) and land slide
treatment at existing Km 138.500 (Design Chainage 134.970) of NH-94
on EPC mode under improvement of NH connectivity to Chardham in the
State of Uttarakhand. - EPC Contractor – ABCI Infrastructure Pvt. Ltd.
25. Safety Audit Services for Four Laning of Solan-Kaithilghat section of Design & Construction NHAI
NH-22 (Now NH-5) from Km 106.00 to Km 129.050 on EPC mode in the Stage Safety Audit
state of Himachal Pradesh under NHDP Phase-III” - EPC Contractor –
M/s AIREF Engineers Limited
26. Safety Audit Services for Two-laning from Kanubari to Longding section Third Party Safety Audit NHIDCL
of NH- 52B (New NH- 215) from km 0.000 to 47.213 (length 47.214 km) at Pre-COD stage
in Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE
on EPC basis. EPC Contractor – M/s Monte Carlo Limited
27. Safety Audit Services for Up-Gradation of Mansar - Ramtek - Salaikhurd, Third Party Safety Audit PWD-NH
from existing km 75+800 (Mansar) to km 120+100 (Salaikhurd) [design at Pre-COD stage (Nagpur)
km 0+000 to km 44+000] (44.000 km) of NH- 753 to two lane with paved
shoulder configuration in the state of Maharashtra on EPC mode. EPC
Contractor- Barbrik Project Limited (PRA Pvt Ltd)
28. Safety Audit Services for Up-gradation of Salaikhurd- Nawagaaon - Third Party Safety Audit PWD-NH
Torora, from existing km 120+100 (Salaikhurd) to km 163+200 (Tirora) at Pre-COD stage (Nagpur)
[Design km 44.000 to km 87.000 of NH- 753 To Two Lane with Paved

17
S. PROJECTS ROLE OF MASP CLIENT
No (Highway Sector – Road Safety Audit at EPC Design, (in brief)
: Construction, Pre-COD and O&M Stages)
Shoulder configuration in the state of Maharashtra on EPC mode. EPC
Contractor- Barbrik Project Limited (PRA Pvt Ltd)
29. Safety Audit Services for Construction of Two-Lane Road with Paved Design & Construction BRO
Shoulders for Chinyalisour Bypass from existing Chainage from Km Stage Safety Audit
133.020 to Km 137.330 (Design Chainage Km 0.000 to Km 4.316) of NH-
94 (Old) under Chardham Parijojna in the State of Uttarakhand on EPC
mode under improvement of NH connectivity to Chardham in the State of
Uttarakhand. EPC Contractor – OASIS Technocons Ltd.
30. Safety Audit Services for Rehabilitation and Upgradation of Gangotri – Design & Construction BRO
Dharasu (NH-108) to 2-Lane with paved shoulder from Km 101.06 to Km Stage Safety Audit
110.860 (Design Chainage from Km 87.730 to km 97.400) on EPC mode
under improvement of NH connectivity to Chardham in the State of
Uttarakhand. - EPC Contractor – OASIS Technocons Ltd.
31. Safety Audit Services for Construction and Up-gradation of Existing Road Design & Construction BRO
to 2-Lane with Paved Shoulder from existing Chainage Km 65.00 to Km Stage Safety Audit
76.000 (Design chainage Km 63.950 to Km 74.733) of NH-94 (new NH
34) Rishikesh- Dharasu road on EPC mode in the State of Uttarakhand
(design length- 10.783km)”. EPC Contractor –M/s ABCI Infrastructure
Pvt. Ltd.
32. Safety Audit Services for Improvement and Provisioning of Additional Design & Construction BRO
Safety Measures for Gangotri-Dharasu (NH-108) from KM 110.860 to stage Safety Audit
KM 123.080 (Design Chainage from KM 97.400 to KM 109.458) on EPC
Mode under Improvement to NH Connectivity to Chardham in the State
of Uttarakhand. – EPC Contractor – M/s Bharat Construction Limited
33. Safety Audit Services for “Construction of Eight Lane Carriageway Design & Construction NHAI
starting near junction SH-44 to junction with Keshopura Road stage Safety Audit
(km115+700 to km 151+840) section of Delhi-Vadodara Greenfeild
Alignment (NH 148N) on EPC Mode under Bharatmala Pariyojana in the
state of Rajasthan)-Package-5; EPC Contractor –M/s KCC Buildcon Pvt
Ltd.
34. Safety Audit Services for “Construction of Eight Lane Carriageway Design & Construction NHAI
starting near junction with keshopura road to junction with NH-11 (KM stage Safety Audit
151/840 to km 183/000) section of Delhi-Vadodara Greenfeild Alignment
(NH 148N) on EPC Mode under Bharatmala Pariyojana in the state of
Rajasthan)-Package-6; EPC Contractor –M/s KCC Buildcon Pvt Ltd.
35. Road Safety Audit Services for “Strengthening and Widening of ExistingOperation and NHAI
2-Lane Road to 4-Lane Dual Carriageway from Km 12.600 to Km 84.700 Maintenance Stage
of NH-3 (Indore-Khalghat Section) on BOT basis in the State of Madhya Audit including
Pradesh. Concessionaire- Oriental InfraTrust (OIT) Blackspot identification
& Rectification
measures
36. Development of Six-Lane Access Controlled Highway from Adhoya Design & Construction NHAI
Musalmana (Ambala) to Sadopur (Ambala) (from Ch 84+400 to 121+786) stage Safety Audit
of Shamli Ambala section [NH-344GM] of Bareilly-Ludhiana Economic
Corridor on EPC Mode under Bharatmala Pariyojana Phase I in the State
of Haryana (Package 3)- EPC Contractor –M/s Montecarlo Ltd.

18
S. PROJECTS ROLE OF MASP CLIENT
No (Highway Sector – Road Safety Audit at EPC Design, (in brief)
: Construction, Pre-COD and O&M Stages)
37. Improvement, Operation and Maintenance including Strengthening and Operation and NHAI
widening of existing 2-lane Road to 4-Lane Dual Carriageway from km Maintenance Stage
488.270 to km 413.200 (Lucknow –Sitapur Section) in the State of Uttar Audit including
Pradesh on Build, Operate and Transfer (BOT) basis, Four laning of Blackspot identification
Lucknow-Raebareli Section from Km 12+700 to Km 82+700 of NH 24B in & Rectification
the State of Uttar Pradesh, NHDP Phase IV A on Design, Build, Finance, measures
Operate and Transfer (DBFOT) Annuity Basis, Four laning of Lucknow
Sultanpur Section of NH-56 (New NH-731) from Km. 11.500 (Design
Chainage Km.11+500) to Km.134.700 (Design Chainage Km. 138+925) in
the State of UP NHDP Phase-IV on Hybrid Annuity Mode.
38. 4-laned Yedshi – Aurangabad from Km.100.000 to Km.290.200 section Operation and NHAI
of NH-52 (old NH-211) under NHDP Phase IV B in the State of Maintenance Stage
Maharashtra, 4-laned Aurangabad (Km. 290.200) to Karodi village end Audit including
(Km. 320.104) road section of NH-211 (New NH No. 52) in the State of Blackspot identification
Maharashtra under NHDP Phase IVB on EPC Mode, 4-laned Karodi & Rectification
(Km. 320.640) to Telwadi (Km. 375.000) road section NH-211 (New NH measures
No. 52 in the State of Maharashtra under NHDP Phase IV B on EPC
Mode.
39. Safety Consultancy Services for “Rehabilitation and Upgradation to 4lane Design and NHAI
configuration and strengthening of Thanpuri to Paror sec from Km 85.135 Construction Stage
to 100.840 of NH20 (New NH154) (Design Length 16.275) of Pathankot Audit
Mandi under NH(O) in Himachal Pradesh on EPC mode”

Note: Project No.18, 22, 24, 25, 26, 29,30,31 and 32 are hill roads/land slide projects.

Project no. 33, 34 are green field 8-lane expressway

19
7.1 PROJECT DATA SHEETS FOR SAFETY PROJECTS
1. Name of Assignment: Approx. value of the contract (in current US$): 3000
Development of Multi Lane Carriageway from Km 704.200 (INR 2.10 Lakh)
to Km 723.00 (From Kanhan to Automotive Square)
Section of Urban Link of Nagpur- Kamptee Section of
Nagpur-Jabalpur Road of NH-44 to be executed on EPC
Mode in the State of Maharashtra.
Country: Duration of assignment (months): 24 months
Location within country: India
Name of Client: National Highways Authority of Total No. of person-months of the assignment: 1.5
India (NHAI), PIU Nagpur, India
Address- PIU, Nagpur Approx. value of the services provided by your firm
under the contract (in current US$): 3000 (INR 2.10
Lakh)
Start date (month/year): 06/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 09/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt Ltd Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development of Multi Lane Carriageway.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

20
SUPPORTING DOCUMENTS

21
22
23
2. Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and Up-gradation 2500 (INR 1.75 Lakh)
of NH- 43 from Km 81.500 to Km 130.000 (Dhamtari-
Kanker section) to two- lanes with paved shoulder in the
state of Chhattisgarh under NHDP- IV through
Engineering, Procurement & Construction (EPC) basis.

Country: Duration of assignment (months): 3 months


Location within country: India
Name of Client: Public Works Department Total No. of person-months of the assignment: 1

Address- PWD, Government of Chhattisgarh, Raipur, Approx. value of the services provided by your firm
Chhattisgarh under the contract (in current US$):
2500 (INR 1.75 Lakh)
Start date (month/year): 06/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: NIL
Completion date (month/year): 01/2018

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Government of Chhattisgarh intends to develop the section to two lane with paved shoulder.

Description of Services provided by our Company/Professionals:


The role of the firm during Completion stage are mentioned below:
• Audit of Intersections;
• Audit of Road Signs;
• Audit of Pavement Marking;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Guardrails, Hedges and Railings
• Audit of bus- bays/truck lay-byes
• Audit of Roadside Facilities including crash barriers;

24
SUPPORTING DOCUMENTS

25
26
3. Name of Assignment: Approx. value of the contract (in current US$): 5000
Safety Consultancy services Development of Two lane (INR 3.5 Lakh)
Elevated Road from km 0+044 (near Liberty Cinema) to Km
3+070 (near Mental Hospital) on Nagpur Obedullaganj road
NH-69 and from km 1+414 (Chhaoni Junction) to Km 2+260
(near Anna sahib Gundewar College) on Katol road including
development of at grade road and junctions on EPC -Basis in
the State of Maharashtra.

Country: Duration of assignment (months): 24 months


Location within country: India
Name of Client: National Highways Authority of India Total No. of person-months of the assignment: 1.5
(NHAI),
PIU Nagpur, India

Address- National Highways Authority of India (NHAI), Approx. value of the services provided by your firm
under the contract (in current US$): 5000 (INR 3.5
PIU Nagpur, India Lakh)
Start date (month/year): 04/2017 No. of professional person-months provided by the
Joint Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 09/2019

Name of the Legal Entity in whose Name the Contract is: As Lead As Associate
M A Solutions Pvt Ltd Firm: Firm:
Yes NA
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Description of Project:
Development to 4 Lane Elevated structuture
Description of Services provided by our Company/Professionals:
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal; Audit of Lighting Scheme;
• Audit of Roadside Hazards; Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

27
SUPPORTING DOCUMENTS

28
29
30
4. Name of Assignment: Approx. value of the contract (in current US$):
Safety Consultancy Services for “Construction of 11000 (INR 8 Lakh)
Gorakhpur Bypass from km 79.670 of NH- 29E to existing
km 251.700 of NH-28 through an Engineering, Procurement
and Construction (EPC) Contract under NHDP-IV in the
state of Uttar Pradesh”.
Country: Duration of assignment (months): 30 months
Location within country: India
Name of Client: NHAI, PIU, Gorakhpur, Uttar Pradesh, Total No. of person-months of the assignment: 3
India

Address- PIU, Gorakhpur, Uttar Pradesh Approx. value of the services provided by your firm
under the contract (in current US$): 11000 (INR 8 Lakh)

Start date (month/year): 04/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 09/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt Ltd Yes

Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 4/6 Lane Carriageway
Description of Services provided by our Company/Professionals:
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning; Audit of Road Alignment Design;
• Audit of Proposed Cross Sections; Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

31
SUPPORTING DOCUMENTS

32
33
34
35
5. Name of Assignment: Approx. value of the contract (in current US$): 9000
Safety Consultancy Services for “Widening to 4- Lane with (INR 6.50 Lakh)
paved shoulder with CC pavement from km 256/550 to km
289/500 on Kota Darah section of NH-12 (Kota- Jhalawar
Road) in the state of Rajasthan on EPC mode”.

Country: Duration of assignment (months): 24 months


Location within country: India
Name of Client: PWD Kota PIU, Rajasthan, India Total No. of person-months of the assignment: 3
Address- PIU, PWD Kota Approx. value of the services provided by your firm
under the contract (in current US$): 9000 (INR 6.50
Lakh)
Start date (month/year): 09/2016 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 03/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt Ltd Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 4 Lane Carriageway.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

36
SUPPORTING DOCUMENTS

37
6. Name of Assignment: Approx. value of the contract (in current US$):
Safety Consultancy Services for “Widening and Strengthening 10000 (INR 7 Lakh)
of existing 2 lane carriageway to Four Lanes with paved side
shoulder of Faridkot – Kotkapura– Bathinda Section of NH-15
[New NH No. 754] from existing km 221.380 to km 287.615 of
NH-15 including construction of Faridkot-Kotkapura Bypasses
in the State of Punjab under NHDP-IV on EPC mode”.
Country: Duration of assignment (months): 24 months
Location within country: India
Name of Client: Public Works Total No. of person-months of the assignment: 2
Department (PWD-NH
Wing), Patiala, Punjab, India

Address- (PWD-NH Wing), Patiala, Punjab, India Approx. value of the services provided by your firm
under the contract (in current US$): 10000 (INR 7
Lakh)
Start date (month/year): 02/2016 No. of professional person-months provided by the
Joint Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 03/2018

Name of the Legal Entity in whose Name the Contract is: As Lead As Associate
M A Solutions Pvt Ltd Firm: Firm:
Yes NA
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and functions
sub-Consultants, if any: performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 4 Lane Carriageway
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections; Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal; Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme; Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

38
SUPPORTING DOCUMENTS

39
40
7. Name of Assignment: Approx. value of the contract (in current US$):
Safety Consultancy Services for “Widening and 10000 (INR 7 Lakh)
Strengthening of existing 2 lane carriageway to Four Lanes
with paved shoulder of Harike – Zira –Faridkote Section of
NH-15 [New NH No. 54] from existing km 166.925 to km
221.380 including construction of Zira, Talwandi Bhai and
Mudki Bypasses in the State of Punjab under NHDP-IV on
EPC mode”.
Country: Duration of assignment (months): 24 months
Location within country: India
Name of Client: Public Works Department (PWD-NH Total No. of person-months of the assignment: 2
Wing), Patiala, Punjab, India

Address- (PWD-NH Wing), Patiala, Punjab, India Approx. value of the services provided by your firm
under the contract (in current US$): 10000 (INR 7 Lakh)
Start date (month/year): 02/2016 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 03/2018

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt Ltd Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 4 Lane Carriageway

Description of Services provided by our Company/Professionals:


Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal; Audit of Lighting Scheme;
• Audit of Roadside Hazards; Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

41
SUPPORTING DOCUMENTS

42
43
8. Name of Assignment: Approx. value of the contract (in current US$): 8000
Safety Consultancy Services for Construction of Bhagalpur (INR 5.60 Lakh)
Bypass from km (124.175 to km 140.200) of NH-80 in the
state of Bihar on EPC mode- NH Division RCD Bhagalpur-
Bihar”.

Country: Duration of assignment (months): 24 months


Location within country: India
Name of Client: NH Division, Road Construction Total No. of person-months of the assignment: 2
Department,
Bhagalpur, Bihar , India

Address- PNH Division, Road Construction Department, Approx. value of the services provided by your firm
under the contract (in current US$): 8000 (INR 5.60
Bhagalpur, Bihar , India Lakh)
Start date (month/year): 12/2015 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 01/2017

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt Ltd Yes

Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 2Lane standard Carriageway

Description of Services provided by our Company/Professionals:


T Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections; Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal; Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme; Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned; Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included -
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

44
SUPPORTING DOCUMENTS

45
9. Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Development of Four-Laning with 7000 (INR 5 Lakh)

Paved shoulder of Tallewal- Barnala section of NH-71 from


km 114+000 to km 149+000 (NH-64) in the state of Punjab
on EPC mode”.

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: Public Works Department, Patiala, Punjab Total No. of person-months of the assignment: 2
Address- Public Works Department, Patiala, Punjab Approx. value of the services provided by your firm
under the contract (in current US$):
7000 (INR 5 Lakh)
Start date (month/year): 04/2016 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 07/2018

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
PWD through its NH wing intended to develop the existing 2 lane carriageway to Four Lanes with paved shoulder.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

46
SUPPORTING DOCUMENTS

47
48
10.Name of Assignment: Approx. value of the contract (in current US$): 2500
Third Party Safety Audit of Rehabilitation and Up-gradation (INR 1.75 Lakh)
of NH- 43 from Km 180.000 to Km 241.000 (Bedma
Dahikonda section) to two- lanes with paved shoulder in the
state of Chhattisgarh under NHDP- IV through Engineering,
Procurement & Construction (EPC) basis.

Country: Duration of assignment (months): 4 months


Location within country: India
Name of Client: Public Works Department, Raipur, Total No. of person-months of the assignment: 0.5
Chhattisgarh , India

Address- Public Works Department, Raipur, Approx. value of the services provided by your firm
under the contract (in current US$): 2500 (INR 1.75
Chhattisgarh , India Lakh)
Start date (month/year): 03/2018 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 08/2018

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt Ltd Yes

Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 2 Lane standard Carriageway

Description of Services provided by our Company/Professionals:


The role of the firm during Completion stage are mentioned below:
⚫ Audit of Intersections;
⚫ Audit of Road Signs;
⚫ Audit of Pavement Marking;
⚫ Audit of Lighting Scheme;
⚫ Audit of Roadside Hazards;
⚫ Guardrails, Hedges and Railings
⚫ Audit of bus- bays/truck lay-byes
⚫ Audit of Roadside Facilities including crash barriers;
⚫ Audit for Vulnerable Road Users;

49
SUPPORTING DOCUMENTS

50
51
11.Name of Assignment: Approx. value of the contract (in current US$): 2500
Third Party Safety Audit of Rehabilitation and Up-gradation of (INR 1.75 Lakh)
NH- 43 from Km 241.000 to Km 298.000 (Dahikonda
Jagdalpur section) to two- lanes with paved shoulder in the
state of Chhattisgarh under NHDP- IV through Engineering,
Procurement & Construction (EPC) basis.

Country: Duration of assignment (months): 4 months


Location within country: India
Name of Client: Public Works Department, Raipur, Total No. of person-months of the assignment: 0.5
Chhattisgarh , India

Address- Public Works Department, Raipur, Approx. value of the services provided by your firm
under the contract (in current US$): 2500 (INR 1.75
Chhattisgarh , India Lakh)
Start date (month/year): 03/2018 No. of professional person-months provided by the
Joint Venture Partners or the Sub-Consultants: N.A.
Completion date (month/year): 08/2018

Name of the Legal Entity in whose Name the Contract is: As Lead As Associate Firm:
M A Solutions Pvt Ltd Firm: NA
Yes
Name of joint venture partner or sub- Name of senior regular full-time employees of your firm involved and
Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
Development to 2 Lane standard Carriageway

Description of Services provided by our Company/Professionals:


The role of the firm during Completion stage are mentioned below:
⚫ Audit of Intersections;
⚫ Audit of Road Signs;
⚫ Audit of Pavement Marking;
⚫ Audit of Lighting Scheme;
⚫ Audit of Roadside Hazards;
⚫ Guardrails, Hedges and Railings
⚫ Audit of bus- bays/truck lay-byes
⚫ Audit of Roadside Facilities including crash barriers;
⚫ Audit for Vulnerable Road Users;

52
SUPPORTING DOCUMENTS

53
54
12.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Widening to two/ four lane with 11000 (INR 9 Lakh)
paved shoulders from km 0.00 to km 54.370 (Maharashtra
border to Bidar) section of NH-50 in the state of Karnataka
on EPC Mode – Package I.

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: Public Works Department, Government of Total No. of person-months of the assignment: 1
Karnataka
Address- Public Works Department, Karnataka Approx. value of the services provided by your firm
under the contract (in current US$):
11000 (INR 9 Lakh)
Start date (month/year): 06/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 03/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
PWD, Govt. of Karnataka intended to widen the section to two/four lane with paved shoulder.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm during Design Stage Safety Audit was carried out under various stages as detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

55
SUPPORTING DOCUMENTS

56
57
13.Name of Assignment: Approx. value of the contract (in current US$):
Consultancy Services for Independent Engineer during 17000 ( INR 12 Lakh)
Operation & Maintenance (O&M) Period for 4-Laning of
Pune - Solapur Section of NH-65 from Km 40.000 to Km
150.050 in the State of Maharashtra under NHDP Phase-III
on DBFOT basis.

Country: Duration of assignment (months): 38 Months


Location within country: India
Name of Client: NHAI, PIU-Pune Total No. of person-months of the assignment: 1.5
Address- NHAI, PIU-Pune, Maharashtra Approx. value of the services provided by your firm
under the contract (in current US$):
17000 (INR 12 Lakh)
Start date (month/year): 04/2016 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 07/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Description of Project:
The National Highways Authority of India (NHAI) intended to engage a consulting firm to monitor the Operation &
Maintenance related works, done by the Concessionaire appointed for the said project.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during O&M Stage of the Project carried out under different stages
as detailed below:

• Safety Audit at operation & maintenance stage during the project cycle.
• Review all the safety measures taken by the Concessionaire during the concession period at site.
• Conformity to the safety requirement as per detailed contract requirement shall also be checked and approved.
This shall cover all the temporary/ permanent structures, handling of equipment, safety of workers/road users
and generating awareness /training of site staff of Concessionaire.
• Review of various accidents and review other insurance coverage taken by the Concessionaire.
• To undertake, supervise safety audit/ inspection and furnish a detailed report.
• Review emergency response arrangement, accident data, formats, safety provisions in O&M activities etc.,
as proposed by the Concessionaire.
• Coordinating and controlling all safety issues with the safety audit team deployed by the Client

58
SUPPORTING DOCUMENTS

59
60
14.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Construction of Four Laning of Rai 6000 (INR 4.20 Lakh)
Malikpur (Haryana/Rajasthan Border)_-Narnaul –
Mohindergarh – Charkhi Dadri - Bhiwani – Kharak corridor,
section from km 94.600 to 125.920 of NH- 148B in the state
of Haryana (Package-IV) on EPC Mode."

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: Public Works Department, Jind, Haryana Total No. of person-months of the assignment: 2
Address- Public Works Department, Jind, Haryana Approx. value of the services provided by your firm
under the contract (in current US$):
6000 (INR 4.20 Lakh)
Start date (month/year): 10/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 07/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
PWD, Haryana intended to develop the four Lane standard.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm during Design Stage Safety Audit was carried out under various stages as detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

61
SUPPORTING DOCUMENTS

62
15.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and Up-gradation of 8000 (INR 6 Lakh)

Pratapgarh to Allahabad Bypass Road Junction section of


NH-96 from existing km 100/800 to km 135/230 [Design
Ch.100.800 to Ch. 135.500] to Four lane with paved
shoulders in the state of Uttar Pradesh on Engineering,
Procurement & Construction (EPC) Basis.

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: UPPWD, Uttar Pradesh Total No. of person-months of the assignment: 2
Address- UPPWD, Allahabad, Uttar Pradesh Approx. value of the services provided by your firm
under the contract (in current US$):
8000 (INR 6 Lakh)
Start date (month/year): 07/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 09/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
UPPWD intended to develop the Pratapgarh to Allahabad Bypass Road Junction section of NH-96 to four lane with paved
shoulders.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was done of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

63
SUPPORTING DOCUMENTS

64
16.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and augmentation of 7500 (INR 5.0 Lakh)
New NH-354 (old-SH-25) of section Ramdas to Gurdaspur
from Design Chainage km 140.000 (existing km 46.320 of
SH) to Design Chainage km 187.492 (existing km 3.185 of
SH) for Length of 47.492 km into two with paved shoulder
/Four-Lane under Bharatmala scheme in the State of Punjab
on EPC mode (Package-V).

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: NHAI, PIU- Jalandhar Total No. of person-months of the assignment: 2
Address- PIU- Jalandhar Approx. value of the services provided by your firm
under the contract (in current US$):
7500 (INR 5.0 Lakh)
Start date (month/year): 10/2017 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 09/2019

Name of the Legal Entity in whose Name the Contract is: As Lead As Associate Firm:
M A Solutions Pvt. Ltd. Firm: NA
Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
The National Highways Authority of India (NHAI) intended to develop the section to 2/4 lane with paved shoulder.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm during Design Stage Safety Audit was carried out under various stages as detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

65
SUPPORTING DOCUMENTS

66
17.Name of Assignment: Approx. value of the contract (in current US$):
“Rehabilitation and Upgradation of Watul to Talgaon section 4500 (INR 3 Lakh)

of NH-17 (new NH-66) from existing km 332/200 to


367/200 (design km 165/270 to km 198/528) in the state of
Maharashtra”.

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: Public Works Department, Maharashtra Total No. of person-months of the assignment: 2
Address- Public Works Department, Maharashtra Approx. value of the services provided by your firm
under the contract (in current US$):
4500 (INR 3 Lakh)
Start date (month/year): 05/2018 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 04/2020

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Road Safety Expert)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
The Public Works Department, Maharashtra intended to engage a consulting firm for rehabilitation and Upgradation of
Watul to Talgaon section of NH-17.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm during Design Stage Safety Audit was carried out under various stages as detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

67
SUPPORTING DOCUMENTS

68
18.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Four Laning of Parwanoo – Solan 10000 (INR 7 Lakh)
Section of NH 22 (now NH 5) from km 67.000 to km
106.000 on EPC Mode under NHDP Phase –III in the state
of Himachal Pradesh.

Country: Duration of assignment (months): 24


Location within country: India
Name of Client: NHAI, PIU-Shimla Total No. of person-months of the assignment: 2
Address- NHAI, PIU-Shimla Approx. value of the services provided by your firm
under the contract (in current US$):
11614 (INR 8.13 Lakh)
Start date (month/year): 04/2018 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 03/2020

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
The National Highways Authority of India (NHAI) intended to develop the section to 2/4 lane with paved shoulder.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm during Design Stage Safety Audit was carried out under various stages as detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

69
SUPPORTING DOCUMENTS

70
19.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for “Six Laning of Chittorgarh- 8500 (INR 6 Lakh)
Udaipur section of NH-76 from Design Chainage KM
214.870 to KM 308.370 in the state of Rajasthan (Length
93.5 KM) on DBFOT (Toll) Mode under NHDP Phase V
(Package-III).”

Country: Duration of assignment (months): 6 Months


Location within country: India
Name of Client: NHAI, Udaipur, Rajasthan Total No. of person-months of the assignment: 60 days
Address- NHAI, Udaipur, Rajasthan Approx. value of the services provided by your firm
under the contract (in current US$):
8500 (INR 6 Lakh)
Start date (month/year): 06/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 12/2019

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
The objective of the project was to develop the section to six lane configuration under BOT framework.

Description of Services provided by our Company/Professionals:


The actual services provided included:
• Reconnaissance Survey of the project section
• Carry out Design Stage Safety review & Audit of drawings prepared- identified shortcomings and adequate
recommendations as per IRC guidelines and best industry practice.
• Carry out the construction stage audit during day & night and assess the safety measures exists/provided.
• Confirm the adequacy of safety measures adopted on project highway including construction locations.
• Analysis of Accident Data which includes the following-
o Review of the present system of Accident Data Recording being used by Concessionaire’s Operations
Team.
o The crash data provided in excel format as per IRC 53 for further analysis on yearly basis for two
consecutive years.
o The analysis of Accidental data and identification of black spots and other accident prone areas, its
prioritisation in terms of short, medium and long term improvement measures, Finalisation of
improvement measures in consultation with client/stakeholders
o The observations on Accident Data were supplemented by discussions with Client team, Road users &
locals and suitable remedial measures shall be suggested.

71
SUPPORTING DOCUMENTS

72
73
20.Name of Assignment: Approx. value of the contract (in current US$):
Consultancy Services for Construction Supervision and 17000 (INR 12.50 Lakh)
Consultancy Services for Rehabilitation and upgrading to 2
lane/2 lane with paved shoulders configuration and
strengthening of Lalsot – Karauli Section (km 0.0 to km
85.0) of NH-11 B in the state of Rajasthan.

Country: Duration of assignment (months): 48


Location within country: India
Name of Client: Ministry of Road Transport and Total No. of person-months of the assignment: 3.5
Highways/World Bank
Address- Approx. value of the services provided by your firm
under the contract (in current US$):
17000 (INR 12.50 Lakh)
Start date (month/year): 01/2015 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 12/2018

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Road Safety Expert)
Description of Project:
The Ministry of Road Transport & Highways (MoRTH) intended to develop the said stretch through Rehabilitation and
Upgrading to 2 lanes/2 lane with Paved Shoulders.
Description of Services provided by our Company/Professionals:
Actual services provided included:
• Safety Audit at pre-construction, construction and operation stage during the project cycle.
• Review of DPR/Drawings as part of pre-construction stage audit and suggest suitable recommendation related to
safety aspects.
• Review of TMP as per the World Bank guidelines.
• Reviewing all temporary works / staging along with the structural / bridge engineer from the safety point of view
• Guide the field supervision teams and the contractor’s site officers in complying with adequate construction safety
standards in worksites, plant sites and quarry locations
• Conduct mock safety drills as required from time to time
• Coordinating and controlling all construction safety issues with the construction safety audit team deployed by the
Client/World Bank
• Reporting and following up on construction safety issues / lapses as appropriate.

74
SUPPORTING DOCUMENTS

75
76
21.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and up gradation of 12500 (INR 9 Lakh)
existing 2 lane to 4-lane standards of Rimuli - Koida Section
(Km.163.00 to Km.206.200) of NH-215 (New NH -520) in
the State of Odisha under NHDP Phase III on EPC mode”.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: NHAI Total No. of person-months of the assignment: NA
Address- PIU-Odisha Approx. value of the services provided by your firm
under the contract (in current US$):
12500 (INR 9 Lakh)
Start date (month/year): 07/2018 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 11/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate
is: Firm: Firm:
M A Solutions Pvt. Ltd. Yes NA
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and functions
sub-Consultants, if any: performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Mr Kapil Rana (Traffic & Safety Engineer)
Description of Project:
The National Highways Authority of India (NHAI) intended to engage a consulting firm to monitor the Operation &
Maintenance related works, done by the Concessionaire appointed for the said project.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

77
SUPPORTING DOCUMENTS

78
22.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and Up-gradation of 8500 (INR 6 Lakh)
Rishikesh – Dharasu Road (NH-94) with 2-Lane with Paved
Shoulder from Design Chainage Km 58.603 to Km 58.853
(Existing Chainage Km 59.420 to Km 59.650), from Design
Chainage Km 61.630 to Km 63.950 (Existing Chainage Km
62.630 to Km 65.000) and New Construction of 2-Lane with
Paved Shoulders Chamba Bypass of Design Length 2.035
Km including 440m long Tunnel on EPC mode under
Improvement to NH Connectivity to Chardham in the State
of Uttarakhand”.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: Border Roads Organisation Total No. of person-months of the assignment: NA
Address- Border Roads Organisation, Uttarakhand Approx. value of the services provided by your firm
under the contract (in current US$):
8500 (INR 6 Lakh)
Start date (month/year): 12/2018 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 11/2020

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Manower Alam (Highway cum Safety Engineer)
Description of Project:
BRO intends to develop the existing section to 2-lane standards.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning; Audit of Road Alignment Design;
• Audit of Proposed Cross Sections; Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal; Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme; Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned; Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

79
SUPPORTING DOCUMENTS

80
81
23.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Widening and strengthening of 3500 (INR 2.50 Lakh)
OLD GT Road (Double Lane to 4- Lane) with Service lane
from KM (CH. 3.000 to CH. 8.280) i.e Beda Canal to SP Jain
College More (Sasaram Town) in District Rohtas in the state
of Bihar under CRF for the year 2018-19.

Country: Duration of assignment (months): 18 Months


Location within country: India
Name of Client: Public Works Department, Bihar Total No. of person-months of the assignment: NA
Address- Bihar Approx. value of the services provided by your firm
under the contract (in current US$):
3500 (INR 2.50 Lakh)
Start date (month/year): 12/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 06/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
PWD, Government of Bihar intends to develop the section to 4 lane with service lane.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

82
SUPPORTING DOCUMENTS

83
24.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and Upgradation to 7000 (INR 5 Lakh)
2 Lane/2 lane with Paved Shoulder configuration for design
chainage Km 107.347 to Km 129.208 & Km 133.878 to Km
138.570 (existing chainage Km 110.000 to Km 133.020 &
Km 137.330 to km 142.028) and land slide treatment at
existing Km 138.500 (Design Chainage 134.970) of NH-94
on EPC mode under improvement of NH connectivity to
Chardham in the State of Uttarakhand.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: Border Roads Organisation, Uttarakhand Total No. of person-months of the assignment: NA
Address- Uttarakhand Approx. value of the services provided by your firm
under the contract (in current US$):
7000 (INR 5 Lakh)
Start date (month/year): 03/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 07/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
BRO intends to develop the existing section to 2-lane standards.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal; Audit of Lighting Scheme;
• Audit of Roadside Hazards; Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

84
SUPPORTING DOCUMENTS

85
25.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Four Laning of Solan-Kaithilghat 18000 (INR 13.00 Lakh)
section of NH-22 (Now NH-5) from Km 106.00 to Km
129.050 on EPC mode in the state of Himachal Pradesh
under NHDP Phase-III”.

Country: Duration of assignment (months): 60 Months


Location within country: India
Name of Client: NHAI Total No. of person-months of the assignment: 3
Address- PIU- Himachal Pradesh Approx. value of the services provided by your firm
under the contract (in current US$):
18000 (INR 13.00 Lakh)
Start date (month/year): 12/2018 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): ……..

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Mr Kapil Rana (Traffic & Safety Engineer)
Description of Project:
The National Highways Authority of India (NHAI) intended to develop the Solan-Kaithilghat section of NH-22 to four
lane standards.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

86
SUPPORTING DOCUMENTS

87
26.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Two-laning from Kanubari to 2500 (INR 1.80 Lakh)
Longding section of NH- 52B (New NH- 215) from km
0.000 to 47.213 (length 47.214 km) in Arunachal Pradesh
under Arunachal Pradesh Package of SARDP-NE on EPC
basis.

Country: Duration of assignment (months): 2 months


Location within country: India
Name of Client: NHIDCL Total No. of person-months of the assignment: NA
Address- Near Durga Mandir VIP Road, Niti Vihar Approx. value of the services provided by your firm
Itanagar-791111, Arunachal Pradesh under the contract (in current US$):
2500 (INR 1.80 Lakh)
Start date (month/year): 03/2021 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 04/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Manower Alam (Highway cum Safety Engineer)
Description of Project:
The NHIDCL intended to develop the Kanubari to Longding section of NH- 52B to two lane standards.

Description of Services provided by our Company/Professionals:


The role of the firm during Completion stage are mentioned below:
• Audit of Intersections;
• Audit of Road Signs;
• Audit of Pavement Marking;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Guardrails, Hedges and Railings
• Audit of bus- bays/truck lay-byes
• Audit of Roadside Facilities including crash barriers;
• Audit for Vulnerable Road Users;

88
SUPPORTING DOCUMENTS

89
27.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Up-Gradation of Mansar - Ramtek 2500 (INR 1.75 Lakh)
- Salaikhurd, from existing km 75+800 (Mansar) to km
120+100 (Salaikhurd) [design km 0+000 to km 44+000]
(44.000 km) of NH- 753 to two lane with paved shoulder
configuration in the state of Maharashtra on EPC mode.

Country: Duration of assignment (months): 03 Months


Location within country: India
Name of Client: Public Works Department (NH Division). Total No. of person-months of the assignment: NA
Address- Public Works Department (NH Division), Approx. value of the services provided by your firm
Maharashtra under the contract (in current US$):
2500 (INR 1.75 Lakh)
Start date (month/year): 06/2021 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 09/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Mr Kapil Rana (Traffic & Safety Engineer)
Description of Project:
PWD intended to Up-Grad the Mansar - Ramtek – Salaikhurd section from existing km 75+800 (Mansar) to km 120+100
in to two lane standards.
Description of Services provided by our Company/Professionals:
The role of the firm during Completion stage are mentioned below:
• Audit of Intersections;
• Audit of Road Signs;
• Audit of Pavement Marking;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Guardrails, Hedges and Railings
• Audit of bus- bays/truck lay-byes
• Audit of Roadside Facilities including crash barriers;
• Audit for Vulnerable Road Users;

90
SUPPORTING DOCUMENTS

91
28.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Up-gradation of Salaikhurd- 2000 (INR 1.40 Lakh)
Nawagaaon - Torora, from existing km 120+100
(Salaikhurd) to km 163+200 (Tirora) [Design km 44.000 to
km 87.000 of NH- 753 To Two Lane with Paved Shoulder
configuration in the state of Maharashtra on EPC mode.

Country: Duration of assignment (months): 04 Months


Location within country: India
Name of Client: Public Works Department (NH Division). Total No. of person-months of the assignment: NA
Address- Public Works Department (NH Division), Approx. value of the services provided by your firm
Maharashtra under the contract (in current US$):
2000 (INR 1.40 Lakh)
Start date (month/year): 07/2021 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 11/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Mr Kapil Rana (Traffic & Safety Engineer)
Description of Project: PWD intended to Up-gradation of Salaikhurd- Nawagaaon – Torora section in to Two Lane
with Paved Shoulder configuration.

Description of Services provided by our Company/Professionals:


The role of the firm during Completion stage are mentioned below:
• Audit of Intersections;
• Audit of Road Signs;
• Audit of Pavement Marking;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Guardrails, Hedges and Railings
• Audit of bus- bays/truck lay-byes
• Audit of Roadside Facilities including crash barriers;
• Audit for Vulnerable Road Users;

92
SUPPORTING DOCUMENTS

93
29.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Construction of Two Lane Road 4000 (INR 3.0 Lakh)
with Paved Shoulders for Chinyalisour Bypass from existing
Chainage from Km 133.020 to Km 137.330 (Design
Chainage Km 0.000 to Km 4.316) of NH-94 (Old) under
Chardham Pariyojana in the State of Uttarakhand on EPC
mode under improvement of NH connectivity to Chardham
in the State of Uttarakhand.
Country: Duration of assignment (months): 24 Months
Location within country: India
Name of Client: Border Road Organization. Total No. of person-months of the assignment: 2
Address- Border Road Organization, Uttrakhand Approx. value of the services provided by your firm
under the contract (in current US$):
4000 (INR 3 Lakh)
Start date (month/year): 09/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 08/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
BRO intended to develop the existing lane in to two lane standards.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

94
SUPPORTING DOCUMENTS

95
30.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Rehabilitation and Upgradation of 4000 (INR 3.0 Lakh)
Gangotri – Dharasu (NH-108) to 2-Lane with paved shoulder
from Km 101.06 to Km 110.860 (Design Chainage from Km
87.730 to km 97.400) on EPC mode under improvement of
NH connectivity to Chardham in the State of Uttarakhand.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: Border Road Organization. Total No. of person-months of the assignment: 2
Address- Border Road Organization, Uttrakhand Approx. value of the services provided by your firm
under the contract (in current US$):
4000 (INR 3 Lakh)
Start date (month/year): 09/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 08/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
BRO intended to Upgrad the 2-Lane with paved shoulder.

Description of Services provided by our Company/Professionals:


Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

96
SUPPORTING DOCUMENTS

97
31.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Construction and Up-gradation of 5500 (INR 4.0 Lakh)
Existing road to 2-Lane with Paved Shoulder from existing
Chainage Km 65.00 to Km 76.000 (Design chainage Km
63.950 to Km 74.733) of NH-94 (new NH 34) Rishikesh-
Dharasu road on EPC mode in the State of Uttarakhand
(design length- 10.783km)”.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: Border Road Organization. Total No. of person-months of the assignment: 2
Address- Border Road Organization, Uttrakhand Approx. value of the services provided by your firm
under the contract (in current US$):
5500 (INR 4.0 Lakh)
Start date (month/year): 09/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 08/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate
is: Firm: Firm:
M A Solutions Pvt. Ltd. Yes NA
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and functions
sub-Consultants, if any: performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
BRO intended to Up-gradation of Existing road to 2-Lane with Paved Shoulder.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

98
SUPPORTING DOCUMENTS

99
100
32.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for Improvement and Provisioning of 6500 (INR 4.5 Lakh)
Additional Safety Measures for Gangotri- Dharasu (NH-
108) from KM 110.860 to KM 123.080 (Design Chainage
from KM 97.400 to KM 109.458) on EPC Mode under
Improvement to NH Connectivity to Chardham in the State
of Uttarakhand.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: Border Road Organization. Total No. of person-months of the assignment: 2
Address- Border Road Organization, Uttrakhand Approx. value of the services provided by your firm
under the contract (in current US$):
6500 (INR 4.5 Lakh)
Start date (month/year): 09/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 08/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Izharul Haque (Traffic Planner cum Safety Engineer)
Description of Project:
BRO intended to Improvement and Provisioning of Additional Safety Measures for Gangotri- Dharasu section (NH-108)
in to two lane standards.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

101
SUPPORTING DOCUMENTS

102
103
33.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for “Construction of Eight Lane 6000 (INR 4 Lakh)
Carriageway starting near junction SH-44 to junction with
Keshopura Road (km115+700 to km 151+840) section of
Delhi-Vadodara Greenfeild Alignment (NH 148N) on EPC
Mode under Bharatmala Pariyojana in the state of
Rajasthan)-Package-5.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: NHAI Total No. of person-months of the assignment: 2
Address- NHAI, Gurugram Approx. value of the services provided by your firm
under the contract (in current US$):
6000 (INR 4 Lakh)
Start date (month/year): 12/2019 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 12/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Manower Alam (Highway cum Safety Engineer)
Description of Project:
NHAI intended to Construction of Eight Lane Carriageway starting near junction SH-44 to junction with Keshopura Road
(km115+700 to km 151+840) section of Delhi-Vadodara Greenfeild Alignment.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

104
SUPPORTING DOCUMENTS

105
106
34.Name of Assignment: Approx. value of the contract (in current US$):
Safety Audit Services for “Construction of Eight Lane 6000 (INR 4 Lakh)
Carriageway starting near junction with keshopura road to
junction with NH-11 (KM 151/840 to km 183/000) section
of Delhi-Vadodara Greenfeild Alignment (NH 148N) on
EPC Mode under Bharatmala Pariyojana in the state of
Rajasthan)-Package-6.

Country: Duration of assignment (months): 24 Months


Location within country: India
Name of Client: NHAI Total No. of person-months of the assignment: 2
Address- NHAI, Gurugram Approx. value of the services provided by your firm
under the contract (in current US$):
6000 (INR 4 Lakh)
Start date (month/year): 02/2020 No. of professional person-months provided by the Joint
Venture Partners or the Sub-Consultants:
Completion date (month/year): 12/2021

Name of the Legal Entity in whose Name the Contract As Lead As Associate Firm:
is: Firm: NA
M A Solutions Pvt. Ltd. Yes
Name of joint venture partner or Name of senior regular full-time employees of your firm involved and
sub-Consultants, if any: functions performed:
Md. Mashkur Ahmad (Safety Expert cum Team Leader)
Md. Manower Alam (Highway cum Safety Engineer)
Description of Project: barasat
NHAI intended to Construction of Eight Lane Carriageway starting near junction with keshopura road to junction with
NH-11 (KM 151/840 to km 183/000) section of Delhi-Vadodara Greenfeild Alignment.
Description of Services provided by our Company/Professionals:
Actual Services provided by the firm included Audit during Design and Construction Stage of the Project carried out
under different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by construction
workers

107
SUPPORTING DOCUMENTS

108
9. MULTI-SECTOR ADVISORY PROJECTS
S.No PROJECTS ROLE OF MASP
. (Multi-sector-Advisory Services) (in brief)
1. Engineering and Planning Consultants for ▪ Review and analysis of all traffic surveys for design of
Project Preparation and Implementation traffic ingress/ egress and parking facility and multimodal
Consultancy Services (PPICS) for Model traffic interchange, holistic integration and design of traffic
Road Corridors in Hyderabad in the state of inventories.
Telangana. (HRDCL) ▪ Traffic forecast for vehicles, passengers and pedestrians.
▪ Study of existing infrastructure, accessibility, circulation
pattern, pedestrian facilities and parking to assess current
carrying capacity and need for expansion of infrastructure
and facilities.
▪ Detail proposals for road widening, junctions, footpath,
parking and other facilities to enhance road safety.
2. Project Development and Management ▪ Develop suitable PPP options & structuring and
Consultant (PDMC) for Atal Mission for performance based contracts on different models
Rejuvenation & Urban Transformation ▪ Preparation of Bid Documents for PPP Mode service
(AMRUT) Towns – Guwahati, Dibrugarh, delivery contracts with assistance from subject experts
Silchar and Nagaon, in Assam ▪ Selection of Concessionaires as per the bid documents for
PPP mode service Contract Management of performance
based urban service delivery contracts and contracts on PPP
mode
▪ Coordinate with the client and all concerned authorities for
the PPP implementation.
3. Transaction Advisory (TA) of Toll Operate ▪ Assisting the Authority and PMC appointed by the Authority
and Transfer Projects (NHAI) in Andhra separately in validating the project bundle created
Pradesh and Gujarat ▪ Estimation of costs
▪ Creation of bidding documents for the project bundle
▪ Provide other inputs related to the Agreement as requested
by the Team Leader or Client
4. TA 9031-ADB IND: Supporting Rajasthan’s Infrastructure gap assessment in transport and energy sector to
Productive Clusters in the Delhi–Mumbai assess the strength of inbound and outbound linkages between
Industrial Corridor- (ADB)- (transport & the identified productive clusters and their connections to the
energy infrastructure advisory) less-developed hinterland. Particularly for Freight transportation
(roads and railways), logistics, storage and distribution of goods.
5. Preparation of Pedestrian Circulation Plan Passenger Demand Forecast including ridership estimation,
and Traffic Management Plan around Parking and Traffic Management Plan, Development of various
Chennai Metro Rail Station at Chennai alternatives in respect of mobility of users.
Central (CMRL)
6. Consultancy services for “Carrying out Study of review of project reports, surveys in connection with
International Road Assessment Program accident data, road furniture, its analysis and adequate
(iRAP) survey, designing of counter recommendations for their improvements in the state of
measures and supervision of implementation Rajasthan.
of targeted multi sector road safety
interventions on demo corridor(s)” in the
state of Rajasthan – (World Bank)
7. TA for Adapting the Model Concession Technical aspect including best practices- MCA, Identify all
Agreement (MCA) for Expressways- relevant aspects for expressways from technical perspective in a
(MoRTH-World Bank) comprehensive manner and address each of these aspects with
adequate justification through the documentation part.

109
S.No PROJECTS ROLE OF MASP
. (Multi-sector-Advisory Services) (in brief)
8. Feasibility report including financial model Feasibility study including development of Financial model,
for Development of identified 2 Greenfield market and demand assessment to arrive at project components,
properties (at Saputara- TPC INR 36.65 Cr Appropriate project structuring includes PPP options, assistance
and Tithal- TPC INR 12.05 Cr ) in the state during bidding process.
of Gujarat on PPP basis. (GUJTOP, Govt of
Gujarat)
9. Preparation of service plan and financial plan Route wise Passenger Demand Forecast and ridership estimation
for bus services to facilitate connectivity for the Base year, intermediate year and Horizon year (10 years
between Raipur and Naya Raipur and within from the base year) on the 3 BRT corridors, Passenger Demand
Naya Raipur on BRT corridors in the state Forecast and ridership estimation.
of Chhattisgarh (NRDA-World
Bank/DIMTS).
10. Capacity Building/Training programme on Capacity Building Training programme to Govt officers which
various components of Model Concession includes Group A&B officers of Indian Audit & Account
Agreement under PPP framework (CAG- Department, Govt of India.
Govt of India).
11. Development of Jamshedpur- Dhanbad Preparation of Land Acquisition Plan (LAP), Land Requisition
expressway in the state of Jharkhand (Govt Plan (LRP) and Utility Relocation Plan (URP)
of Jharkhand/iDeCK)
12. Consultancy Services to carry out detailed ▪ Review and analysis of all traffic data, Traffic forecast for
technical assessment of the corridors to next 10, 20, 30 years.
identify issues impacting the efficiency of the ▪ Prepare & Finalise efficiency measurement metrics for
corridors and its design solutions- Agra- corridor performance
Mumbai (appx 1000 km) Corridor (NHAI) ▪ Measuring baseline corridor efficiency
▪ Identify gaps in the corridor performance metrics and
analyse root causes for the deviation
▪ Black Spot Analysis and Safety Audit
▪ Identify interventions to improve the corridor efficiency
13. Preparation of Station Development Plan for Preparation of Traffic Planning Report:
Gwalior Railway Station on the Indian ▪ The Estimation and characterization of the demand of the
Railway Network” (IRSDC) new railway station, and the complementary facilities.
▪ Assessment of waiting area, administrative requirement
▪ Integrated traffic plan meeting the Railways as well as city
traffic needs for next [ 40] years, around [5] Km from the
project site
14. Preparation of Station Development Plan for ▪ Provision of circulation and inter-modal facilities
Baiyappanahalli Railway Station on the ▪ Multi-modal Integration Plan
Indian Railway Network” (IRSDC) ▪ Parking Demand Projection
▪ Conceptual network Improvement Plans
▪ Impact of Proposed Conceptual Plans on the study Area
▪ Cost-estimate of proposed facilities
▪ Traffic Diversion for construction of activities
▪ Assistance during Bidding process and management
15. Traffic Circulation Plan and impact study for ▪ Traffic volume assessment on the adjoining roads
Chilla village site development by DDA in ▪ Capacity analysis and Level of service
Delhi (DDA) ▪ Identification of key issues affecting the project.
▪ Traffic circulation Plan and future recommendation
16. Safety Improvement Plan on “Six Laning of Analysis of Accident Data which includes the following-
Chittorgarh- Udaipur section of NH-76 from
110
S.No PROJECTS ROLE OF MASP
. (Multi-sector-Advisory Services) (in brief)
Design Chainage KM 214.870 to KM ▪ Review of the present system of Accident Data Recording
308.370 in the state of Rajasthan (Length being used by Concessionaire’s Operations Team
93.5 KM) on DBFOT (Toll) Mode under ▪ The analysis of Accidental data and identification of black
NHDP Phase V (Package-III).” (TATA spots and other accident prone areas.
PROJECTS LTD). ▪ Suitable remedial measures were suggested.
▪ Safety Audit of Design and drawings
▪ Safety Audit during construction stages
17. Capacity Building & Training Programme Training given on the following-
for Govt Engineers of states of Delhi, AP, ▪ Road Alignment Design;
Uttarakhand, Punjab, Haryana, UP of India ▪ Proposed Cross Sections;
on Road Safety Audit. (AITD - MoRTH) ▪ Interchanges/Intersections;
18. Capacity Building & Training Programme ▪ Road Signs Proposal;
for Manipur PWD Engineers on Road Safety ▪ Pavement Marking Proposal;
Audit. (AITD - MoRTH) ▪ Lighting Scheme;
19. Capacity Building & Training Programme ▪ Roadside Hazards;
for Goa PWD Engineers on Road Safety ▪ Roadside Facilities Planned;
Audit. (AITD - MoRTH) ▪ Vulnerable Road Users
20. Capacity Building & Training Programme ▪ Relevant Case studies with examples
for Rajasthan PWD Engineers on Road ▪ Hazardous location and its treatment
Safety Audit. (AITD - MoRTH) ▪ Crash Black spots identification,
21. Capacity Building & Training Programme ▪ Crash Analysis and improvement Programme
for Senior Engineers of Road Construction
Department,Government of Bihar, Patna on
Road Safety Audit. (RCD, GoB)
22. Consultancy Services for Carrying out ⚫ Market Survey for areas marked as station locations
Feasibility Study and Preparation of Detailed ⚫ Review of Collection and analysis of traffic data for last 15 years
Project Report (DPR) for development of Traffic projection
Ropeway Projects in Uttarakhand ⚫ Review of cost estimates
(NHLML, NHAI) ⚫ Preparation of revenue estimation including farebox revenue
and revenue from real estate component
⚫ Estimation of O & M expenses
⚫ Preparation of financial model and project structuring on Hybrid
Annuity Model
⚫ Preparation of draft NIT, RFQ-cum-RFP and Concession
Agreement for the Ropeways
⚫ Assistance in selection of Developer for Ropeway
23. Transaction Advisory Services for Setting- ⚫ Detailing of project components to be developed/upgraded and
up and operating integrated sugar complex its planning
at Sitarganj, Uttarakhand (UK Sahakari ⚫ Assessment of availability of basic infrastructure at site such as
Chini Mills Sangh Ltd) water, electricity, accessibility, solid waste disposal etc.
⚫ Assessment of project cost estimates and revenue projections
⚫ Development of suitable financial analysis by ascertaining
project cost and revenue projections,
⚫ Preparation of bid documents
⚫ Assistance during Bidding process management
24. Transaction Advisory Services including
Financial Feasibility for Development of
Tourist Guest House at Kutti Mata Parking,
Muni Ki Reti, Uttarakhand- Nagar palika

111
10. TRAFFIC, FEASIBILITY & DPR STUDIES
S. PROJECTS
No (Highway Sector – Pre-Feasibility, Feasibility, DPR Study including Traffic, Economic &
Financial Analysis, Cost Estimates etc.)
1. Consultancy Services for feasibility study and Preparation of Detailed Project Report for 2/4 lane with paved
shoulders for the work of Upgradation to 2 lane with paved shoulder of Coastal Highway (MSH- ) having
approximate length of 131 Km. from Bankot to Dapoli, Guhagar, Jaigad in Ratnagiri District in the State of
Maharashtra.
2. Consultancy Services for Feasibility Study and Preparation of Detailed Project Report for Elevated Road on
Thane- Ghodbunder Road from chainage 0/000 to 4/500 (Ghodbunder to Gaimukh) in the State of Maharashtra
under DBFOT under PPP framework
3. Project Management Consultancy Services for Feasibility Study and preparation of Detailed Project Report for
Construction of Major Bridge across Thane Creek (TCB III) on Sion- Panvel Road in the State of Maharashtra
under EPC
4. Consultancy Services for preparation of Detailed Project Report of National Highway starting at Akola- Deori-
Akot- Anjangaon- Achalpur- Betul State Border in the State of Maharashtra for up – gradation to Two Lanes
with paved shoulder / Four lane configurations. (length appx 117 km)
5. Consultancy Services for preparation of Feasibility Study and Preparation of Detailed Project Report for
Upgradation To Four/Two Lane Paved Shoulders From Sarapaka (NH-221) to Eturanagram (via) Manuguru,
Rajupeta, Malluru, Ramannagudem Along River Godavari In The State Of Telengana
6. Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of of
Balangir- Patnagar- Harishankar- Nrisinghnath- Paikamal-Naupada Road, NH declaration approved “in
priciple” for up gradation to Two/Four lane with paved shoulder configuration on the state of Odisha of (LOT
III-, Package No. NH/IAHE/41) – Length appx 140 km –
7. Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-
construction services for up gradation of selected road stretches/corridors to Two lane with paved shoulders NH
configuration under BHARATMALA Project and National Highways connectivity to Backward
areas/Religious/Tourist places in the state of Uttarakhand:
i. Askot – Dharchula – Tawaghat – Sirkha – Malpa – Garbyang – Lipu lekh Pass – 80 km
ii. Simli (NH-87E) Narayanbagar – Kulsari – Talwari – Gwaldan – Dangoli - Baijnath – Bageshwar –
Balighat – Kapkot – Sama - Quiti- Birthi - Girgaon – Ratapani – Munsiyari – Darkot - Madkot- Seraghat
– Mawani –Jolljivi –288 km
iii. Mana – Mussapani – Gastoli – Rattakana – Manapass and Joshimath – Malari–110 km
iv. Almora (NH-109) – Kausani – Baijnath – Tharali - Karn Prayag (NH- 109)– 70 km
8. Detailed Project Report for 2/4 lane road with paved shoulders for Package No – II/11 (Akola – Deori –Akot-
Betul-State Border (Maharashtra)- 109 km
9. Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning,
Rehabilitation and Up-gradation to 2-lane/2- lane with paved shoulders or its strengthening in the State of
Himachal Pradesh for package no. HP/Shimla/6Shimla (Dhalli) – Tattapani – Churag – Rohanda – Sunder
Nagar – length approx 180km
10. Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-
gradation of newly declared National Highways including existing NH-91A, NH-92, and NH-97 & NH-28B in
the State of Uttar Pradesh.)
i. Chapwa – Betwa – Chatauni – Kushinagar Road – NH-28B – Km.60.23
ii. Ghazipur – Jamaniya – Saiyad Raja Road – NH-97 – Km.56.20. Total length: 116km”
11. Consultancy Services for carrying out feasibility study and detailed project preparation for (total length 521 km)
in the state of Assam
i. Narengi-Kuruwa – Dumunichawki (including from Changsari to Kuruwa) (47 km)
ii. Indo-Bhutan border – Musalpur – Tihu Chowk – Tihu – Makhibaha – Sarthebari – Kalitakuchi (110
km)
112
S. PROJECTS
No (Highway Sector – Pre-Feasibility, Feasibility, DPR Study including Traffic, Economic &
Financial Analysis, Cost Estimates etc.)
iii. Pathshala – Dubi – Helona – Bongaon – Rampur – Sarthebari (45 km)
iv. ihu – Sarthebari – Nagaon (50 km)
v. Baihata – Goreswar – Udaguri (50 km)
vi. Mangaldai – Bhutianhang – Changrang (62 km)
vii. Dudhnoi – Matia – Mornoi – Goalpara – Pancharatna (103 km)
viii. Haldyanganj – Mankachar road (22 km)
12. Preparation of Feasibility Study and Detailed Project Report for Construction of ROBs on various level
crossings in Vidarbha in the state of Maharashtra: Package IV (Nagpur – Wardha, Badnera – Wardha & Badnera
– Amravati Section of Central Railway) which includes 8 ROBs
13. Consultancy services for preparation of Feasibility Study and Detailed Project Report for two/ four lane with
paved shoulder for package no. III/10- Allapalli to Bhamragarh-Laheri-Narayanpur-length approx. 104 km in
the state of Maharashtra
14. Traffic Study at KM 243, Lakholi toll plaza on the Raipur- Arang section of NH-6 under BOT basis under PPP
framework in the state of Chhattisgarh
15. Consultancy Services for carrying out feasibility study and detailed project preparation for Jaisinghnagar-
Kotadol, Ramgarh-Sameria road in the state of Chattisgarh
16. Consultancy Services for carrying out feasibility study and detailed project preparation for Kanker – Manppur,
Kacche – Narayanpur road in the state of Chattisgarh
17. Consultancy Services for Project Management phase I including preparation of Detailed Project report of
selected stretches/ corridors of National highways/ State roads (Approved “in principle for declaration of
National Highways) in the State of Telangana for up gradation to two/four lane with paved shoulder
configuration – Nirmal (junction of NH 44 & 61) – Jagityal (junction of NH-63) via Khanapur, Mallapur, Raikal
– Tentative length: 90 kms.
18. Consultancy Services for Project Management including Preparation of Detailed Project Report of selected
stretches/corridors of National Highways / State Roads (Approved “In Principle” for declaration as National
Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder
configuration (Porumamilla – Seetharampuram – CS Puram Road section). Length: 59.115 Km
19. Consultancy Services for Project Management including preparation of Detailed Project Report of selected
stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National
Highways) in the State of Andhra Pradesh for upgradation to Two/Four lane with paved shoulder
configuration. i) Kodikonda Checkpost (on NH 44), Lepakshi, Hindupur, Madakasira road, ii) Kuppam on NH
42 - AP/KTK border (Kolar (on NH 75, KTK)) road (Length: 80 Km.).
20. Consultancy Services for Project Management phase 1 including preparation of Detailed Project report of
selected stretches/ corridors of National highways/ State roads (Approved “in principle for declaration of
National Highways) in the State of Telangana for up gradation to two/four lane with paved shoulder
configuration – Madnur (junction at NH 161) – Bodhan – Nizamabad junction at NH – 63. Tentative length: 75
kms
21. Detailed Feasibility report for upgradation of Pukhriya to Bindki section of SH-46 (83 KM including 2.5km of
Elevated section) in the state of Uttar Pradesh, India under PPP framework. (TPC INR 1300 Crores appx- 4
laning).
22. Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of
selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as
National Highways) for up gradation to Two/Four lane with paved shoulder configuration of the following
projects:
I. (Pkg. Palwal – Aligarh Road). Tentative Length – 77km.
II. (Pkg. Patiala – Pehowa – Kuruskshetra – Ladwa – Yamuna Nagar). Tentative Length – 120km.
23. Detailed Feasibility Report for upgradation of Azamgarh – Mau – Balia section of SH-34 (100 KM) in the state
of Uttar Pradesh, India under PPP framework. (TPC INR 400 Crores – for 2 laning)
113
S. PROJECTS
No (Highway Sector – Pre-Feasibility, Feasibility, DPR Study including Traffic, Economic &
Financial Analysis, Cost Estimates etc.)
24. Feasibility studies of four road sections of State Highways in the state of Rajasthan-Total length Appx 205 km
25. Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Four
laning/Two Lane with Paved shoulder of the following road projects in Bihar:
I. NH-103 including Flyover at Paswan Chowk on NH-19 in Bihar on EPC/PPP Mode. Tentative Length
– 59km.
II. NH-219 of Mohania – Bhabhua – Chainpur – UP border in Bihar on EPC / PPP Mode. Tentative Length
– 45km. III. Junction of NH-22 near Hazipur – Vaishali – Areraj – Bettiah (on NH-727) excluding
Khajuriya – Kesaria Stretch and including Masrakh – Khaira Chhapra Section. Tentative Length –
232km.
26. Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two
Lane with Paved shoulder of the following projects:
I. Varunna Bridge (NH-122) Dalsingh Sarai–Roseda–Begusarai(NH-31)
II. Roseda to Junction of NH-27 near Darbhanga in Bihar on EPC Mode. Tentative Length – 134km.
27. Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two
Lane with Paved shoulder of the following projects:
I. Junction of NH-22 near Hazirpur to junction of NH-122 at Bachwada via Mahanar and Mohiuddin
Nagar (2) Starting from junction of NH-122 and NH-32- Samastipur-Darbhanga – upto junction of NH-
27 in Bihar on EPC Mode. Tentative Length – 140km.
II. BH/WB Border – Amdabad – Manihari section of NH-131A including construction of Bridge over river
Mahananda & Katihar Bypass and (2) Geometric improvements of NH-327E including Raniganj
Bypass in Bihar on EPC Mode. Tentative Length – 60 km.
28. Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Redesigning,
Rehabilitation, and Upgradation of National Highway 444 (Srinagar – Shupiyan – Qazigund) to 2 lane with
Paved Shoulders in the State of Jammu and Kashmir
29. Consultancy services for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including
2/4/6 laning of Jind-Safidon-Panipat Road in the State of Haryana
30. Detailed Feasibility Report for upgradation of Mohanlalganj to Unnao section of ODR 52C (70 KM) in the state
of Uttar Pradesh, India under PPP framework. (TPC INR 700 Crores)
31. Consultancy Services for Preparation of DPR for Jaipur Ring Road in the state of Rajasthan – from Junction
at km 280 of NH8 at Hasampura Km 0.00 and ends at NH 11 km 221 at Bagrana at Km 96.000
32. Four Laning of Raipur – Arang Section (Km 239 – 282) of NH-6 under BOT basis under PPP framework in the
state of Chhattisgarh
33. Consulting services for Feasibility report for Two Laning of State Highways (package-15; 6 road stretches –
(length appx 450 km) in the state of Rajasthan

114
Details of Traffic & Other surveys

➢ Traffic, Axle Load, OD, Pedestrian & Animal Crossing, Household Survey ,
Number Plate Survey , ROB or RUB , FOB, and Skid Resistance Survey.
➢ Road Marking & Road Sign Board Reflectivity by Rectro-Reflectometer As
per IRC – 35-2015.
➢ APC calculation for NHAI Tolls.
➢ Falling Weight Deflecto Meter
➢ Network Survey Vehicles
➢ Benkal Beam Deflection
➢ Pavement Design and Overlay Flexible Pavement By BBD & FWD Survey
Method By IRC 81 & 115. Rigid Pavement Design by IRC 58 & 117.
➢ Low Volume Rural Road Pavement Design ( Flexible Or Rigid Pavement -
IRC SP- 72, IRC -SP-62)

115
11. LIST OF PROJECTS (Detailed Design & Engineering)
S.No PROJECTS
(HIGHWAY SECTOR-Detailed Design and Engineering)
1. Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from
km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the state of Jammu & Kashmir.”
2. Widening of KHAMTARAI ROB L.C. No.5 on UKURA –SARONA Bypass Rail line on Raipur -Bilaspur
Road NH-30 in Raipur District in Chhattisgarh”
3. Construction of VUP at BALIKUDA, SIKHARPUR & BADACHANA BHUBANESWAR – JAGATPUR
- CHANDIKHOLE Section Of NH-5 (New NH-16) On EPC Mode.” in Odisha
4. Consulting Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-
construction services for upgradation of selected road stretches/corridors to Two Lane with paved shoulders
NH configuration under BHARATMALA Project & National Highways connectivity to Backward areas /
Religious / Tourist places of the country” (hereinafter called "the Projects”) in Sikkim, India.
5. Consulting Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-
construction services for upgradation of selected road stretches/corridors to Two Lane with paved shoulders
NH configuration under SARDP – NE Project” (hereinafter called "the Projects”) in Arunachal Pradesh,
India.
6. Independent Engineer Services for Development and Maintenance of Barmer – Sindari - Jalore of SH-16
and Ahore - Bali - Mundra (Saderao to Mundra) section of SH-16 (Total Length 178 Km) in the state of
Rajasthan – Package-2 of ADB TRANCHE I on Annuity Model. under Design, Build, Operate/Maintain
and Transfer (DBOT)

116
12. CVs OF KEY PERSONNELS

12.1 CV OF SR. ROAD SAFETY AUDITOR CUM TEAM LEADER

CURRICULUM VITAE
1. Position Title and No. Sr. Road Safety Auditor cum Team Leader
2. Name of Expert: Mashkur Ahmad
3. Date of Birth: 15th Oct 1974 Citizenship: Indian
4. Country of Citizenship/
India
Residence
• Master in Transportation Planning, Jan 2002, School of Planning and
Architecture, New Delhi.
• B.Tech. in Civil Engineering, June 1999, F/O Engg & Tech; J.M.I., New
Delhi
• 15-Day Certification Course on "Road Safety Audit and other Road
5. Education:
Safety Engineering Related Aspects", 2020, CRRI, New Delhi, India
• 5 Day Training on Traffic Engineering & Road Safety Audit, 2018,
CRRI, New Delhi, India
• Master in Business Administration (MBA-E), Finance, National
Institute of Business Management, Chennai, May 2009.
1. Membership of Professional Associations:
• Member, Indian Road Congress, India (400993)
• Member, Institute of Urban Transport, India.(1205)
• Member, International PPP Platform
• Member, Global PPP Network
Guest Faculty at Various Govt. Institutes:
• Guest Faculty at International Centre for Information System & Audits (ICISA)-
Noida; CAG, GoI, for PPP practice and program
• Visiting Faculty - School of Planning & Architecture (SPA) for the Post-Graduate
Program in Transport Planning & Economics.
• Guest Faculty- Dept of Ekistics & Architecture, Jamia Millia Islamia, New Delhi
6. Membership, Trainer & for the Master programme- transport planning subject
Visiting Faculty details Training Imparted to Govt Officers/Engineers:
• Training to Govt Engineers across various states (Rajasthan, Delhi, AP,
Uttarakhand, Punjab, Haryana, Bihar, UP, Goa, Manipur) of India on Road
Safety Audit through AITD/MoRTH under World Bank Funding.
• Training on Road Safety Audit to Senior Engineers of Road Construction Dept,
Patna, Bihar.
• Capacity Building as a trainer to Government officials through conducting
training programme on PPP and urban/transport infrastructure sector in India &
Nepal.
• Capacity Building as a trainer to Government officials through conducting
training programme in various states i.e. Bihar, MP, Uttarakhand, Maharashtra,
Assam, Delhi etc on PPP practice and programme.
• 15 Day Certification Course on "Road Safety Audit and other Road Safety
Engineering Related Aspects", 2020, CRRI, New Delhi, India
• 5 Day Training on Traffic Engineering & Road Safety Audit, 2018, CRRI, New
7. Training & Publication- Delhi, India.
• 2 Day Certification on National Road Safety Month for Rectification of Black
Spots, 2021, MoRTH, New Delhi, India.

117
• IDFC Middle Management Programme, conducted by First Ascent group (ph-I),
June 2011
• IDFC Middle Management Programme, conducted by First Ascent group (ph-II),
July 2012
• Training on Negotiation strategies conducted by Prof Dishan Kamdar, ISB,
Hyderabad, January 2011
• Techno- Economic Evaluation of Highway Projects conducted by Central Road
Research Institute, New Delhi, India. (2002)
Publications:
#Presented paper titled “Saturation Flow Characteristics at Signalized Junction” in ARRB,
Australia by the co-author in May 2003.
#Presented paper titled “Saturation Flow Characteristics at Signalized Junction” for
the seminar “Strategies in Traffic Engineering and Management” conducted by
MSRIT, Bangalore in Feb. 2004
8. Employment Record relevant to the assignment:

Period Employing Country Summary of activities performed relevant to the


organization and assignment
your title/
position. Contact
information for
references
May 2014 – Till M A Solutions India As Traffic cum Safety Expert, responsible for entire traffic
date Pvt Ltd, studies including survey, data analysis, network assessment,
Director/ traffic projection and development of various scenarios.
Independent Accident data analysis and suggested suitable measures.
Consultant - Suggesting junction improvement plan, safety related aspects
Traffic cum of the Highway stretches at Design, pre-construction,
Safety
construction, pre-opening and O&M stage as mentioned
below:
Training to Govt Engineers of State/Central Govt in India
on Road Safety.
Safety Audit at Comprehensiveness of Planning & design
stage including:
• Road Alignment Design (Horizontal/Vertical), Sight
distance, super elevation. Proposed Cross Sections;
Interchanges / Intersections;
• Road Signs Proposal, Pavement Marking Proposal,
Lighting Scheme;
• Roadside Hazards, Roadside Facilities Planned,
Vulnerable Road Users;
• Bridge / Structural Design,
Safety Audit at construction stage during the project cycle.
Review of DPR/Drawings as part of pre-construction stage
audit and suggest suitable recommendation related to
safety aspects.
Reviewing and approving the construction zone safety
plans and traffic management and safety plans prepared by
the Contractor and ensure their strict compliance as per the
World Bank guidelines.
Reviewing all temporary works / staging along with the
structural / bridge engineer from the safety point of view
118
Guide the field supervision teams and the contractor’s site
officers in complying with adequate construction safety
standards in worksites, plant sites and quarry locations
Conduct mock safety drills as required from time to time
Coordinating and controlling all construction safety issues
with the construction safety audit team deployed by the
Client/World Bank
Safety Audit at Completion stage (COD).
Safety Audit at operation & maintenance stage during the
project cycle.
Reporting and following up on construction safety issues /
lapses as appropriate.

Jan 2008 to April Infrastructure India, Task assigned includes entire study as Team Leader/Project
2014 Development Nigeria, Manager in the transport/highways sectoral projects, for
Finance Company Nepal, preparation of Feasibility report, Preliminary Project Report,
(IDFC) Limited/ Indonesia DPR, Traffic analysis & forecasting, Road safety features,
IDFC Foundation tolling strategy, revenue estimation, Marketing and Structuring
of projects for bankability & implementability, Comprehensive
Senior Vice
Mobility Plan (CMP), traffic and transport study and their
President / Vice
implementation plan with assessment of costing, revenue,
President / Senior viability etc. Project development process and their phasing,
Specialist / monitoring & implementation.
Transportation
Expert As trainer/faculty for Capacity building programme to
Government officials on PPP and transportation related infra
sector both in India & Nepal. Planning and study of detailed
project Report and drawing; review of Draft Concession
agreement, technical schedules including road side features etc.
Stakeholder consultation, pre-bid meeting, compliance of
queries both technical and commercial aspects.
Traffic management plan & Road safety related issues during
Planning stage, design stage & ongoing construction stage
Developing strategy for Operation & Maintenance framework
for various State highways including traffic projection, tolling
revenue, road safety issues, service level etc.
Sept 2006- Jan IL&FS India Task assigned includes entire study as Project Manager in the
2008 Infrastructure transport/highways sectoral projects, for preparation of
Development Feasibility report, Preliminary Project Report, DPR, Traffic
Corporation Ltd. analysis & forecasting, Road safety features, tolling strategy,
(IIDC), revenue estimation, Marketing and Structuring of projects for
Transportation bankability & implementability, traffic and transport study and
Expert their implementation plan with assessment of costing, revenue,
viability etc. Project development process and their phasing,
monitoring & implementation.
Dec 2005 – August Freelancing India Task assigned includes planning & organization of traffic
2006 Consultant, surveys, traffic data analysis, junction improvement proposal,
Domestic derivation & finalization of growth rates, traffic projection,
Highway capacity analysis, suggestion for proposed improvement
Engineer proposal & preparation of report as per client satisfaction.
(ADB)/Transport Analysis of all traffic engineering aspects, traffic audit & to
Planner / Traffic identify potential road safety policy programs that can
cum Transport minimize road death risk while achieving sustainable economic
Expert growth and socio economic development. Carried out Road
safety audit at design stage, construction stage & operation
119
stage. Supervised preparation of detailed highway engineering
drawings considering safety audit & preparation of Road Safety
Management Plan.

Mar 2002 – Dec SPAN India Task assigned includes planning & organization of traffic
2005 Consultants Pvt surveys, traffic data analysis, junction improvement proposal,
Ltd. derivation & finalization of growth rates, Road side furnitures
Transport and its improvement plan, traffic projection, capacity analysis,
Planner/ Traffic suggestion for proposed improvement proposal & preparation
cum Safety of report as per client satisfaction. Road safety related analysis
Engineer & to identify black spots, develop potential road safety policy
programs that can minimize road death risk while achieving
sustainable economic growth and socio economic development.
Carried out Road safety audit, preparation of detailed highway
engineering drawings considering safety audit & preparation of
Road Safety Management Plan.

Aug 2000 – Feb School of India Master in Transportation Planning course: During this tennure
2002 Planning & apart from academic study,
Architecture,
Dept of (i)Completed Thesis alone on Saturation Flow Characteristics
Transport at signalised junction including Traffic survey, Signal timing
Planning survey, Que length survey, geometric survey, Drivers survey its
analysis and accordingly develop a model to suggest signal
timing at avrious categories of Junction.
(ii) involved as a team member for Comprehensive Traffic &
Transport study for Pondicherry which includes traffic &
travel surveys, accident data, its analysis and accordingly
develop suitable improvement plan for short term, medium
term and long term.

Aug 1999 to July School of India As Traffic & Transportation Engineer, study of traffic survey
2000 Planning & analysis, accidents data analysis at various road
Architecture, sections/junctions and in the surrounding areas, suggested
Asst. Project improvement measures
Associate-
Transport /
Traffic cum
Safety Engineer
Languages Speaking Reading Writing
English Excellent Excellent Excellent
9. Language skills:
Hindi Excellent Excellent Excellent
Urdu Excellent Excellent Excellent
10. Adequacy for the assignment
Detailed Tasks Reference to prior Work/ Assignments that best illustrates capability to handle the assigned tasks
Assigned on
Consultant’s
Team of Experts
Task assigned Name of the Project or assignment: Safety Consultancy Services for Four laning of
includes Audit Parwanoo – Solan Section of NH 22 (now NH 5) from km 67.000 to km 106.000 on EPC Mode
during Design under NHDP Phase –III in the state of Himachal Pradesh
Stage of the Year: 2017-18, 2018-19; Location: H.P
Project would Client: NHAI
be carried out Main Project features: NHAI intends to develop the section to 4-lane with paved shoulder in
the State of H.P

120
as detailed Position Held: Sr Road Safety Expert cum Team Leader
below: Name of the Project or assignment: Safety Consultancy Services for “Construction of Eight
• Audit of Lane Carriageway starting near junction SH-44 to junction with Keshopura Road (km115+700
Comprehensive to km 151+840) section of Delhi-Vadodara Greenfeild Alignment (NH 148N) on EPC Mode
ness of under Bharatmala Pariyojana in the state of Rajasthan)-Package-5.
Planning; Name of the Project or assignment: Safety Audit Services for “Construction of Eight Lane
• Audit of Road Carriageway starting at the End approach of interchange on NH-552 (Tonk – Sawai Madhopur)
Alignment near village Nui and Ending at Hardevganj village near Indergarh (Ch. 292.950– 319.400)
section of Delhi- Vadodara Access Controlled Green Field Alignment (NH-148N) under
Design;
Bharatmala Pariyojana in the state of Rajasthan on EPC mode- Package- 10
• Audit of
Year: 2020-21, 21-22
Proposed Cross
Location: Rajasthan
Sections
Client: NHAI
• Audit of Main Project features: NHAI intends to develop the 8 lane Geenfield expressway.
Intersections;
• Audit of Road Position Held: Sr Road Safety Expert cum Team Leader
Signs; Name of the Project or assignment: Safety Consultancy Services for Construction of 6-
• Audit of lane access controlled Greenfield highway from km 200+000 to km 225+000of Sangariya
Pavement (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar
Marking; Economic Corridor in the State of Rajasthan (AJ/SR- Package-8)
• Audit of Year: 2020-2121-22
Lighting Location: Rajasthan
Scheme; Client: NHAI
• Audit of Main Project features: NHAI intends to develop the 6 lane Geenfield expressway.
Roadside Activities Performed: (all above 4 projects)
Hazards; Audit during Design Stage of the Project would be carried out under different stages detailed
• Guardrails, below
Hedges and • Audit of Comprehensiveness of Planning;
Railings • Audit of Road Alignment Design;
• Audit of bus- • Audit of Proposed Cross Sections;
bays/truck lay- • Audit of Interchanges/Intersections;
byes • Audit of Road Signs Proposal;
• Audit of • Audit of Pavement Marking Proposal;
Roadside • Audit of Lighting Scheme;
Facilities
• Audit of Roadside Hazards;
including crash
• Audit of Roadside Facilities Planned;
barriers;
• Audit for Vulnerable Road Users;
• Audit for
Vulnerable Name of the Project or assignment: Safety Consultancy Services for Rehabilitation and Up-
Road Users; gradation of Rishikesh – Dharasu Road (NH-94) with 2-Lane with Paved Shoulder from
Design Chainage Km 58.603 to Km853 (Existing Chainage Km 59.420 to Km 59.650), from
Design Chainage Km 61.630 to Km 63.950 (Existing Chainage Km 62.630 to Km 65.000) And
New Construction of 2-Lane with Paved Shoulders Chamba Bypass of Design Length 2.035
Km including 440m long Tunnel on EPC mode under Improvement to NH Connectivity to
Chardham in the State of Uttarakhand”.
Name of the Project or assignment: Safety Consultancy services for Rehabilitation and
upgradation of Rishikesh-Dharasu road (NH-94) with 2lane with paved shoulder from Km
76.00 to Km 110.00 (Design Chainage from Km 74.733 to Km 107.347)(32.614 Km) including
construction of Kamand re-alignment from existing chainage Km 105.200 to Km 108.600
(Design chainage from Km 103.436 to Km 105.949- total length 2513 mtrs) and land slide
treatment work between design chainage Km 73.800 to Km 74.00 (200 m) on EPC mode
under improvement to NH connectivity to Chardham in the state of Uttarakhand
Year: 2018-19, 19-20
Location: Uttarakhand
Client: BRO
Main Project features: BRO intends to develop the of existing section to 2-lane standards.
Position Held: Sr Road Safety Expert cum Team Leader

121
Activities Performed:
Audit during Design Stage of the Project would be carried out under different stages detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

Name of the Project or assignment: Safety Consultancy Services “Four Laning of Solan-
Kaithilghat section of NH-22 (Now NH-5) from km 106.00 to km129.050 on EPC mode in the
state of Himachal Pradesh under NHDP Phase-III”-
Year: 2018-19, 19-20, 20-21; Location: H.P.
Client: NHAI
Main Project features: NHAI intends to develop the of existing section.
Position Held: Safety Expert
Name of the Project or assignment: Safety Consultancy Services for Rehabilitation and up
gradation of existing 2 lane to 4-lane standards of Rimuli-Koida Section (Km.163.00
to Km.206.200) of NH-215 (New NH -520) in the State of Odisha under NHDP Phase III on
EPC mode”
Year: 2018-19, 19-20, 20-21; Location: Odisha
Client: NHAI.
Main Project features: NHAI intends to develop the of existing 2 lane to 4-lane standards.
Position Held: Sr Road Safety Expert cum Team Leader
Name of the Project or assignment: Safety Consultancy Services for Widening to 4-Lane
with paved shoulder with CC pavement from km 256/550 to km 289/500 on Kota- Darah
section of NH-12 (Kota- Jhalawar Road) in the state of Rajasthan on EPC mode
Year: 2016-17, 17-18
Location: Rajasthan
Client: Public Works Dept, (NH), GoR.
Main Project features: PWD, GoR intends to develop the section to 4-lane with paved
shoulder with CC pavement from km 256/550 to km 289/500 on Kota-Darah Section of NH-
12 (Kota-Jhalawar Road) in the State of Rajasthan
Position Held: Safety Expert
Name of the Project or assignment: Safety Consultancy Services for Development to four
lane with paved shoulder of Tallewall-Barnala section of NH-71 from km 114.00 to 136.070
including Barnala bypass km 136.070 of NH-71 to km 149.00 of nh-64 in the state of Punjab
on EPC mode under NHDP-IV.
Year: 2016-17
Location: Punjab
Client: NH Wing, Public Works Dept, (B&R), GoP.
Main Project features: PWD through its NH wing intended to develop the existing 2 lane
carriageway to Four Lanes with paved side shoulder of Tallewall-Barnala section of NH-71
from km 114.00 to 136.070 including Barnala bypass km 136.070 of nh-71 to km 149.00 of nh-
64 in the state of Punjab on EPC mode under NHDP-IV.
Position Held: Sr Safety Expert cum Team Leader
Activities Performed: (all above 4 projects)

122
Audit during Design Stage of the Project would be carried out under different stages detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
Name of the Project or assignment: Consultancy Services for Independent Engineer during
Construction and Operation & Maintenance (O&M) Period for Six Laning of Kishangarh -
Udaipur -Ahmedabad Section from Km. 90.000 (near Gulabpura) to Km. 214.870 (end of
Chittorgarh bypass) of NH-79 in the State of Rajasthan package – 2 under NHDP Phase-V on
BOT mode
Year: 2017-18, 2018-19, 2019-20, 20-21
Location: Rajasthan
Client: NHAI
Main Project features: The National Highways Auhority of India (NHAI) intends to engage a
consulting firm to monitor the Construction and Operation & Maintenance related works, done
by the Concessionaire appointed for the said project. The project is being widened to Six Lane
configuration under BOT (toll) model.
Position Held: Sr Road Safety Expert cum Team Leader
Activities Performed:
• Safety Audit at construction and operation stage during the project cycle-Undertake,
supervise safety audit/ inspection on regular basis and furnish a detailed report.
• Reviewing and approving the construction zone safety plans and traffic management and
safety plans prepared by the contractor and ensure their strict compliance as per the World
Bank guidelines.
• Reviewing all temporary works / staging along with the structural / bridge engineer from
the safety point of view
• Review all the safety measures taken by the Concessionaire during the concession period
at site.
• Conformity to the safety requirement as per detailed contract requirement shall also be
checked and approved. This covers all the temporary/ permanent structures, handling of
equipments, safety of workers/road users and generating awareness /training of site staff
of Concessionaire.
• Review of various accidents and review other related aspects.
• Review and compliance of all safety related claims made by the Concessionaire.
• Review emergency response arrangement, accident data, formats, safety provisions in
O&M activities etc., as proposed by the Concessionaire.
• Coordinating and controlling all safety issues with the safety audit team deployed by the
Client
Name of the Project or assignment: Third party safety Audit for Rehabilitation and up-
gradation of NH-43 from km 81+500 to km 130+000 Dhamtari to kanker section to two lane
with paved shoulder in the state of Chhattisgarh under nhdp-IV through EPC basis (COD
stage)
Year: 2017-18
Location: Chattisgarh
Client: Public Works Dept, (NH), GoCh
Main Project features: PWD, GoCh intends to develop the section to two lane with paved
shoulder
Position Held: Safety Expert cum Team Leader

123
Name of the Project or assignment: Third party safety Audit for Rehabilitation and Up-
gradation of NH- 43 from Km 180.000 to Km 241.000 (Bedma-Dhikonda section) to two-
lanes with paved shoulder in the state of Chhattisgarh under NHDP- IV through Engineering,
Procurement & Construction (EPC) basis (COD stage).
Year: 2018-19
Location: Chattisgarh
Client: Public Works Dept, (NH), GoCh
Main Project features: PWD, GoCh intends to develop the section to two lane with paved
shoulder
Position Held: Sr Road Safety Expert cum Team Leader
Name of the Project or assignment: Third party safety Audit for Rehabilitation and Up-
gradation of NH- 43 from Km 241.000 to Km 298.000 (Dahikonga- Jagdalpur section) to two-
lanes with paved shoulder in the state of Chhattisgarh under NHDP- IV through Engineering,
Procurement & Construction (EPC) basis. (COD stage)
Year: 2018-19
Location: Chattisgarh
Client: Public Works Dept, (NH), GoCh
Main Project features: PWD, GoCh intends to develop the section to two lane with paved
shoulder
Position Held: Safety Expert cum Team Leader
Activities Performed: (for all the above 3 projects)
Audit during Completion Stage of the Project would be carried out under different stages
detailed below:
• Audit of Intersections;
• Audit of Road Signs;
• Audit of Pavement Marking;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Guardrails, Hedges and Railings
• Audit of bus- bays/truck lay-byes
• Audit of Roadside Facilities including crash barriers;
• Audit for Vulnerable Road Users;
Name of the Project or assignment: Safety Consultancy Services for Widening and
Strengthening of existing 2 lane carriageway to Four Lanes with paved side shoulder of
Faridkot – Kotkapura – Bathinda Section of NH-15 [New NH No. 54] from existing km
221.380 to km 287.615 of NH-15 including construction of Faridkot-Kotkapura Bypasses in
the State of Punjab under NHDP-IV on EPC mode.
Year: 2015-2016, 2016-17
Location: Punjab
Client: NH Wing, Public Works Dept, (B&R), GoP.
Main Project features: PWD through its NH wing intended to develop the existing 2 lane
carriageway to Four Lanes with paved side shoulder of Faridkot – Kotkapura – Bathinda
Section of NH-15 [New NH No. 54] from existing km 221.380 to km 287.615 of NH-15
including construction of Faridkot-Kotkapura Bypasses in the State of Punjab under NHDP-
IV on EPC mode.
Position Held: Sr Road Safety Expert cum Team Leader
Name of the Project or assignment: Safety Consultancy Services for Construction of
Bhagalpur Bypass from km (124.175 to km 140.200) of NH-80 in the state of Bihar on EPC
mode.
Year: 2015-2016, 16-17
Location: Bihar
Client: NH Wing, Road Construction Department, GoB
Main Project features: RCD through its NH wing intended the Construction of two lane with

124
paved shoulder highway from Design Chainage km 124+175 to km 140+850 of Bhagalpur
Bypass
of NH-80 in the state of Bihar on EPC mode.
Position Held: Sr Road Safety Expert cum Team Leader
Name of the Project or assignment: Safety Consultancy Services for Widening and
Strengthening of existing 2 lane carriageway to Four Lanes with paved side shoulder of Harike
– Zira –Faridkote Section of NH-15 [New NH No. 54] from existing km 166.925 to km
221.380 including construction of Zira, Talwandi Bhai and Mudki Bypasses in the State of
Punjab under NHDP-IV on EPC mode.
Year: 2015-2016, 2016-17
Location: Punjab
Client: NH Wing, Public Works Dept, (B&R), GoP.
Main Project features: PWD through its NH wing intended to develop the existing 2 lane
carriageway to Four Lanes with paved side shoulder of Harike – Zira –Faridkote Section of
NH-15 [New NH No. 54] from existing km 166.925 to km 221.380 including construction of
Zira, Talwandi Bhai and Mudki Bypasses in the State of Punjab under NHDP-IV on EPC
mode.
Position Held: Sr Road Safety Expert cum Team Leader
Activities Performed: (for above 3 projects)
Audit during Design Stage of the Project would be carried out under different stages detailed
below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
Name of the Project or assignment: Consultancy Services for Independent Engineer during
Operation & Maintenance (O&M) Period for 4-Laning of Pune - Solapur Section of NH-65
from Km 40.000 to Km 150.050 in the State of Maharashtra under NHDP Phase-III on
DBFOT(toll) basis under PPP framework: (Length 110 km; TPC INR 1,110 Crs)
Year: 2016-17, 17-18, 18-19
Location: Maharashtra
Client: NHAI
Main Project features: The National Highways Auhority of India (NHAI) intendeds to engage
a consulting firm to monitor the Operation & Maintenance related works, done by the
Concessionaire appointed for the said project.
Position Held: Safety Expert
Activities Performed:
• Safety Audit at operation & maintenance stage during the project cycle.
• Review all the safety measures taken by the Concessionaire during the concession period
at site.
• Conformity to the safety requirement as per detailed contract requirement shall also be
checked and approved. This shall cover all the temporary/ permanent structures, handling
of equipments, safety of workers/road users and generating awareness /training of site staff
of Concessionaire.
• Review of various accidents and review other insurance coverage taken by the
Concessionaire.
• To undertake, supervise safety audit/ inspection and furnish a detailed report.
• Review emergency response arrangement, accident data, formats, safety provisions in
O&M activities etc., as proposed by the Concessionaire.
125
• Coordinating and controlling all safety issues with the safety audit team deployed by the
Client
Name of the Project or assignment: Consultancy Services for Construction Supervision
Consultancy Services for Rehabilitation and Upgrading to 2 lanes/2 lane with Paved Shoulders
Configuration and Strengthening of Lalsot-Karauli Section (km 0.0 to km 85.0) of NH-11 B
in the State of Rajasthan.-World Bank Funded
Year: 2014-2015, 15-16, 16-17, 17-18
Location: Rajasthan
Client: MoRTH (WB Funded)
Main Project features: The Ministry of Road Transport & Highways (MoRTH) intended to
develop the said stretch through Rehabilitation and Upgrading to 2 lanes/2 lane with Paved
Shoulders Configuration and Strengthening of Lalsot-Karauli Section (km 0.0 to km 85.0) of
NH-11 B in the State of Rajasthan. The project cost of INR 208 Crores, is being funded by
World Bank under National Highways Inter connectivity Improvement Programme (Phase I).
Position Held: Safety Expert
Activities Performed:
• Safety Audit at pre-construction, construction and operation/maintenance stage during
the project cycle.
• Review of DPR/Drawings as part of pre-construction stage audit and suggest suitable
recommendation related to safety aspects.
• Reviewing and approving the construction zone safety plans and traffic management and
safety plans prepared by the contractor and ensure their strict compliance as per the World
Bank guidelines.
• Reviewing all temporary works / staging along with the structural / bridge engineer from
the safety point of view
• Guide the field supervision teams and the contractor’s site officers in complying with
adequate construction safety standards in worksites, plant sites and quarry locations
• Conduct mock safety drills as required from time to time
• Coordinating and controlling all construction safety issues with the construction safety
audit team deployed by the Client/World Bank
• Reporting and following up on construction safety issues / lapses as appropriate
Name of the Project or assignment: WB TA for Adapting the Model Concession Agreement
(MCA) for Expressways- MoRTH (World Bank)
Year: 2015-2016, 16-17
Location: New Delhi
Client: MoRTH- World Bank
Main Project features: The objective is to adapt the existing MCA for highways along with
corresponding bid documents templates through required modifications so that aspects
pertaining to expressways are comprehensively addressed in a customized manner. This shall
enable effective implementation of the high priority expressway projects in the country.
Position Held: Technical Expert
Activities Performed:
• Identify all relevant aspects for expressways from technical perspective in a
comprehensive manner and address each of these aspects with adequate justification
through the documentation part. Points may inter-alia include Land Acquisition
requirements, Access Control, Closed Tolling requirements – if applicable, Enhanced
technical specifications & standards, Safety issues, Convenience of local users,
Efficient and integrated use of Intelligent Transportation Systems (ITS)
• Review relevant documents like specification and standards, manuals, codes,
guidelines and policy published by MoRTH, or otherwise that are currently available
and adopt international best practices for planning, design, development of
Expressways.
• Benchmark international best practices in contractual arrangements and other
implementation aspects for expressways for Best construction technology adoption
mechanism
• Interact/consult with the various stakeholders as required from time to time and
participate in workshops in consultation with the Client.
126
• Assistance in customization of all the technical aspects of the MCA including
Technical Schedules for BOT (Toll), BOT (Annuity) and Hybrid Annuity modes.
• Customize the technical aspects of existing MCAs for BOT (Toll), BOT (Annuity) and
Hybrid Annuity modes separately for implementation of expressway projects based on
activities above.

Name of the Project or assignment: Feasibility Studies of two-laning of (Package-13) the


following stretches on PPP basis:

i. Mandrayal - Karauli comprising the section from Mandrayal to Karauli (“Highway-I”);


ii. Sikandra – Gangapur comprising the section from Sikendra to Gangapur (“Highway-II”);
iii. Dholpur – Rajakhera - Border comprising the section from Dholpur to Rejakhera (border)
(“Highway-III”) and
iv. Mahuwa – Laxmangarh – up to SH-14 comprising the section from Mahuwa to SH-14 (the
“Highway-IV”).

Year: 2014-2015
Location: Rajasthan
Client: PWD, Govt. of Rajasthan
Main Project features: The Government of Rajasthan has decided to undertake the development
of state highways- two-laning of the above sections, appx length 205 km; which is to be
constructed through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate
and Transfer (the "DBFOT") basis.
Position Held: Traffic cum Safety Engineer
Activities Performed: Task assigned includes traffic studies including survey, data
analysis, network assessment, traffic projection and development of various scenarios.
Accident data analysis and suggested suitable measures. Suggesting junction
improvement plan, safety related aspects of the said stretches. Carried out road Safety
Audit
Name of the Project or assignment: Detailed Feasibility report for upgradation of Azamgarh-
Mau- Balia section of SH-34 (102 KM) in the state of UP, India under PPP framework
Year: 2015-16 ; Location: UP
Client: UP State Highways Authority
Main Project features: The Government of UP has decided to undertake the development of
state highways (100 KM)- which is to be constructed through Public Private Partnership (the
“PPP”) on Design, Build, Finance, Operate and Transfer (the "DBFOT") basis under VGF
scheme.
Activities Performed: As Traffic cum Safety Engineer, responsible for entire traffic studies
including survey, data analysis, network assessment, traffic projection and development of
various scenarios. Accident data analysis and suggested suitable measures. Suggesting
junction improvement plan, safety related aspects of the said stretches.
Name of the Project or assignment: Detailed Feasibility report for upgradation of Pukhriya
to Bindki section of SH-46 (83 KM including 2.5km of Elevated section) in the state of UP,
India under PPP framework.( (TPC INR 1300 Crores appx)
Year: 2015-16 ; Location: UP
Client: UP State Highways Authority
Main Project features: The Government of UP has decided to undertake the development of
state highway (83 KM)- which is to be constructed through Public Private Partnership (the
“PPP”) on Design, Build, Finance, Operate and Transfer (the "DBFOT") basis under VGF
scheme
Activities Performed: As Traffic cum Safety Engineer, responsible for entire traffic studies
including survey, data analysis, network assessment, traffic projection and development of
various scenarios. Accident data analysis and suggested suitable measures. Suggesting
junction improvement plan, safety related aspects of the said stretches.
Name of the Project or assignment: Detailed Feasibility Report for upgradation of
Mohanlalganj to Unnao section of ODR 52C (70 KM) in the state of UP, India under PPP
framework. (TPC INR 700 Crores)
127
Year: 2015-16 ; Location: UP
Client: UP State Highways Authority
Main Project features: The Government of UP has decided to undertake the development of
state highways (70 KM)- which is to be constructed through Public Private Partnership (the
“PPP”) on Design, Build, Finance, Operate and Transfer (the "DBFOT") basis under VGF
scheme.
Activities Performed: As Traffic cum Safety Engineer, of various scenarios. Accident data
responsible for entire traffic studies including survey, data analysis, network assessment,
traffic projection and development analysis and suggested suitable measures. Suggesting
junction improvement plan, safety related aspects of the said stretches.
Name of the Project or assignment: Development of Ara End Connectivity with 2.5 km of
Elevated section on DBFOT basis under PPP framework in the state of Bihar (total length 9.5
km)
Year: 2013 –2014, 2014-15 (till April 14)
Location: Bihar
Client: Bihar State Road Development Corporation Limited (BSRDCL), Patna
Main Project features: Development of these stretches of 9.5 km of NH-30 to Four lane
standard with 2.5 Km of Elevated Portion. The said project would provide integrated
connectivity for heavy and commercial traffic.
Position Held: Team Leader cum Traffic / Safety Engineer
Activities Performed: Task assigned includes entire study for preparation of Feasibility report,
PPR, Traffic analysis & forecasting, carried out Road safety Audit during ongoing construction
stage of the adjoining stretch from Ara - Mohania, tolling strategy, revenue estimation, PPP
framework, VGF analysis etc.
Name of assignment or Project: Techno Economic Feasibility Report for following projects
Year: 2011 – 2013
• Bhopal- Indore Investment corridor in the state of MP
• Bhopal - Bina Investment corridor in the state of MP
• Jabalpur- Singrauli Investment corridor in the state of MP
Main Project Features: Techno Economic Feasibility Report
Client: MP Trade & Investment Facilitation Corporation
Location: Madhya Pradesh
Position Held: Traffic cum Transportation expert
Activity Performed: Task assigned includes team, interfacing with clients and various
stakeholders. Assessment of overall network and connectivity with various ports etc,
Estimation of traffic/ revenue/ market assessment and sector strategies, costing projection.
Assessment of demand for investment along the corridors. These activities were done for the
corridor as a whole and for the following early bird projects
• Name of the Project or assignment: Development of road/ bridge projects on BOT format in the state of
Bihar:
- Mohania - Ara, NH-30 project. (Length 117 km)
- Aurangabad- Mahabalipur- Bihta, NH-98 & SH-2. (116 km)
Main Project features: Lane:4, Total Length: 233 kms
• Name of the Project or assignment: Development of road/ bridge projects on BOT format in the state of Bihar
Bihta – Sarmera section on SH-78.
Main Project features: Project features: Lane: 4, Length: 112 kms.
• Name of the Project or assignment: Development of following road/ bridge projects on BOT format in the state
of Bihar: Bridge across river Ganga between Ara and Chapra
Main Project features: Bridge Length: 6800 m, approach road length: 33kms,
• Name of Project or assignment: Development of Six Lane Suspension Cable Green field Bridge over the river
Ganga from Kacchi Dargah on NH-30 to Bidupur in Dist Vaishali on NH-103”.
Main Project Features: Six Lane Suspension Cable Green field Bridge (Length: 4000 m bridge in two
stretches along with a 16 km approach road)over the river Ganga
• Name of Project or assignment: Road Sector Finance Study for the State of Bihar
128
Main Project Features: Preparation of Road Fund report highlighting the suggested options of financial framework
Year: 2008 – 2014; Location: Bihar
Client: BSRDCL/Road Construction Dept, Govt of Bihar, India.
Position Held: Team Leader cum Traffic / Safety Engineer
Activities Performed: Task assigned includes entire study for preparation of Feasibility report, PPR, Traffic analysis
& forecasting, tolling strategy, revenue estimation, road safety features. Task assigned includes planning, organizing
& supervision of traffic surveys, analysis of origin & destination survey, traffic volume count survey data &
estimation of diverted traffic on the proposed flyover, traffic projection & capacity assessment of urban road.
Compilation of data for HDMIV, economic analysis, Financial analysis and structuring, VGF assessment, PPP
structuring, Bid documents including RFQ, RFP DCA including technical schedules, Bidding process. Analysis of
all traffic engineering aspects, traffic audit & to identify potential road safety policy programs that can minimize road
death risk while achieving sustainable economic growth and socio economic development. Carried out Road safety
audit at design stage. Task assigned includes preparation & updation of traffic report based on recent traffic volume
count, derivation of growth rates using socio economic data & past traffic data on the stretch & review of improvement
proposals for cost updation including pavement design and preparation of PPPAC. Suggested proposed width of
flyover. Supervised preparation of final detail engineering drawings considering safety audit. Reviewed final highway
engineering drawings considering safety proposal.
Name of Project or assignment:
• Preparation of Diagnostic Study Report for Uttarakhand Transport Corporation
• Preparation of DPR for strengthening of Public Transport system in the state of Uttarakhand.
Year: 2010 to 2011; Location: Uttarakhand
Client: Govt. of UK
Main Project Features: Strengthening of Public Transport System in the state of Uttarakhand
Position Held: Team Leader cum Transportation Expert
Activity Performed: Task assigned includes Preparation of DPR for availing central assistance to strengthen the
public transport system (buses) for the use of latest technologies such as GPS/GSM based vehicle tracking system,
bus system management, computerized reservation system; Formulated mechanism for automatic Fare collection
system, electronic ticket vending machines, inter-modal fare integration, passenger information system etc. for
services catering to connected areas. Identification of profitable / non profitable routes and bundling them according
to frequency, service timings, maximum age of buses to be deployed. Outline the quality of service including bus
body standards, time table adherence, breakdown benchmarks, bus crew & driver discipline, traffic rules adherence,
IT support for management of operations, Decide fleet size to be operated and methodology for the operators desirous
of operating, Set up a regulatory body to oversee the activities related to the strengthening process, Take adequate
measures with respect to taxation on bus chassis & body. Suggesting bus specification, procurement strategy for
operators, assessment of capital and operating cost, funding requirement and its phasing etc., develop service delivery
and standards, development of master plan for the implementation etc.

Name of Project or Assignment: Preparation of Detailed Project Report of Phase –II for Purchase of Buses under
JNNURM for Dehradun, Haridwar and Nainital Cities
Main Project Features: Preparation of Phase –II DPR
Year: 2010-2011
Position Held: Team Leader cum Transportation Expert
Activity Performed: Task assigned includes Preparation of “Phase –II DPR for funding of Buses under JNNURM
scheme for Dehradun, Haridwar and Nainital Cities”. The purpose was to get funding of Buses under JnNURM
scheme by Ministry of Urban Development, Government of India under central assistance system. Suggested suitable
reforms; financial viability and institutional arrangement. Develop a suitable Service & Operations Plan,
Development of suitable implementation plan which includes maintenance framework, service level bench mark
system, review of fixed infrastructure i.e. maintenance of workshop, bus terminal, bus depots, bus shelters, revenue
generation, financial viability options, ticketing system, Identification of organizational framework and structures
including role and responsibilities of various officers. Multimodal integration includes physical integration,
operational integration.

Name of Assignment or Project: Development of 4 road stretches (state of Karnataka.554 km) on Annuity basis
Year: 2009 to 2010
Client: KSHIP; Location: Karnataka
Main Project Features: Development of Road stretches on Annuity with partly supported by World Bank.

129
i) Link 63 (Malavalli – Maddur – Huliyurdurga – Kunigal – Tumkur – Koratagere – Madhugiri – Pavagada), Length:
190 kms.
ii) Link 19 (Mudhol – Mahalingapura – Kabbur – Chikkodi – Nippani), Length: 108 km
iii) Link T21 and M7 (Shimoga-TadasaShikaripura – Anandapuram (NH-206)), Length: 154 km
iv) Link 10 (Managuli – Talikota-Talikota–Devapura), Length:110 km

Activity Performed: Task assigned includes review of Traffic studies including survey, data analysis, network
assessment, traffic projection and development of various scenarios. Developing the financing model/ mechanism
for private sector developers, assessment of options of various funding requirement. Development of alternative PPP
options and bid documents including draft concession agreement. O& M framework for the project,

Name of the Project or assignment:


• Comprehensive Mobility Plan for Kolkata Metropolitan Area
• Development of BRTS Corridors in Patna city on BOT.
• Development of City Bus Services in Patna city on PPP.
Year: Sep 2006 –Jan 2008
Location: Bihar & West Bengal
Client: Gov. of Bihar & Govt. of West Bengal
Position Held: Project Manager cum Transportation Planner (Traffic & safety)
Activities Performed: Task assigned includes traffic studies including survey, data analysis, network assessment,
traffic projection and development of various scenarios. Studies also includes Accident data analysis, black spots,
road side features and suggested suitable improvement measures. Preparation of Road Safety reltaed recommendatio.
Name of assignment or project: : Project Preparation / analysis of Feasibility of Roads on BOT basis under NHDP
Phase IIIA
• 4-Laning of Muzaffarnagar – Haridwar (Km 131.000 to Km 209.000) section of NH-58.
• 4-Laning of End of Durg Bypass – Chattisgarh/ Maharashtra Border Section from Km 322.400 to Km 405.000 of
NH6
• 4-Laning of Armur- Yelareedy- Adloor section of from Km 322.400 to Km 405.000 of NH7
• 4-Laning of Zirakpur - Parwanoo Section of NH22
Year: Dec. 2005 to Aug. 2006
Position Held: Transport Planner (Traffic & Safety)/ Project Manager
Client: NHAI
Location: India
Main Project Features: Development of the Highway to 4 Laning on BOT (Toll) basis through Public Private
Partnership
Activity Performed Task assigned includes analysis of all traffic engineering aspects, traffic management plan;
Traffic study including projections, cost- estimation, tolling strategy, revenue assessment, financial model, viability
assessment for the purpose of arriving a suitable financial bid value.
Name of assignment or project:
• ADB TA IND – 38272 -Technical Assistance for Uttaranchal Urban Development Project- (ADB)
Main Project Features: City Development Plan & their Implementation Framework, suggested funding mechanism.
Activity Performed: Task assigned includes review of earlier reports in respect of urban mobility plan, analyse
existing traffic situation, analysis of data on traffic and transport aspects. Provision of short and medium term
development plan comprising traffic management plan / Safety Management Plan, parking lots, junction
improvement, widening and strengthening of various roads, construction scenario of new roads, Bypasses, circular
ring roads, ROBs, elevated roads, Flyovers, Street furnitures, NMT including pedestrian/bicycles facilities,
improvement of urban road network, shifting of terminals, Public transport system, suggestion of high priority MRTS
corridors and their implementation framework, Bus route rationalization, Bus funding and implementation options,
Conducted workshops to obtain input from key stakeholders, High priority project preparation to take up in phase I.
Name of assignment or project:
• ADB TA – 4607 (IND) Technical Assistance for Uttaranchal States Road Improvement Program (ADB)
Main Project Features: Improvement of 5000 KM road network in the state and their implementation plan with
funding by ADB.
Activity Performed: As a Domestic Transportation Engineer involved in Review of Network Development
Master Plan prepared by PWD consultants (together with International Transportation Engineer, Team Leader),
which includes PWD’s assessment of prevailing capacities, levels of services, accessibility to adjascent villages of the
entire road network in the state. Review the network improvement needs and the technical feasibility of the stage 1

130
sub projects prepared for ADB financing covering detailed designs, bills of quantities, cost estimates, contract
packages, and implementation schedule. Assisting in Finalization of the staged master plan for road network
development over a 10 year time horizon, assisting in preparation of terms of reference for consultancy services for
detailed design of remaining stage 1 projects and construction supervision of the first set of stage 1 projects.
Review of Investment Plan (together with International Institutional Development Specialist), which will be
included the assisting in finalization of cost of network development plan, review the proposed methods of improving
/ rehabilitating/ reconstructing the network to accommodate the forecast traffic, meet national and international
standards and provide the desired level of mobility, review and assisting to finalize the detailed financing plan based
on the most cost-effective alternatives, project implementation schedule, undertake comprehensive review of the
state’s road sector to national/ international benchmarks.assisting to identify the strengths and weakness in the
organisatitonal arrangement ,conduct workshop to obtain input from key stakeholders, assist the PWD to implement
Phase 1 of the capacity development plan and stage 1 of the investment plan by providing training for staff etc.
Name of assignment or project: Widening of U.P. Link Road from 6 lanes to 8 lanes and making same Signal Free
Junction by providing Clover Leaves.
Main Project Features: Improvement of the stretch to 8 lane by providing clover leaf
Year: 2005 to 2006; Client: NHAI
Position Held: Traffic cum Safety Expert
Location: Delhi, Uttar Pradesh
Activity Performed: Task assigned includes traffic studies including survey, data analysis, network assessment,
traffic projection and development of various scenarios. Accident data analysis, black spots, road side features and
suggested suitable improvement measures.
• Name of the Project or assignment: Detailed Project Report for Eastern Peripheral Expressway passing through
Faridabad, Noida, Ghaziabad and Kundli in the states of Haryana & Uttar Pradesh
• Name of the Project or assignment: Detailed Project Report for 4/6 Laning of Meghalaya/Assam Border to
Assam/Tripura Border Section of NH-44 in the state of Assam
Main Project features: Lane:4/6, Length: 111 kms including hill sections
• Name of the Project or assignment: Detailed Project Report for Rehabilitation and upgradation of 4-lane divided
carriageway configuration of Hajipur- Chapra- Siwan- Gopalganj section of NH-19 and NH-85 in the state of
Bihar on BOT basis.
Main Project features: Lane: 4, Length: 155 kms
• Name of the Project or assignment: Detailed Project Report for 4-laning of North-South Corridor of Nagpur -
Hyderabad section (km. 94.000 to km. 123.000) of NH-7 in Maharashtra (Package-C-II/C-6).
Year: 2004- 2006
Location: Maharashtra, Bihar, Assam, Haryana, Uttar Pradesh
Client: NHAI
Main Project features: Development of projects on BOT basis
Position Held: Traffic cum Safety Engineer
Activities Performed: Task assigned includes entire traffic studies including survey, data analysis, network
assessment, traffic projection, travel demand estimation, capacity augmentation, Commodity movement analysis,
traffic management plan, junction improvement plan etc. Suggested planning & strategies. Institutional structuring to
implement plan and development of various scenarios. Accident data analysis, accident study, carried out road safety
audit, black spots, road side features and suggested suitable improvement measures.

• Name of the Project or assignment: Detailed Feasibility Studies of Baran-Mangrol-Sawaimadhopur-Bharatpur


Upto State Border Road (374 km) in the State of Rajasthan

• Name of the Project or assignment: Detailed Feasibility Studies of Lalsot – Bharoti, Laban – Kota, Baran –
Jhalawar Road sections (172 km) in the State of Rajasthan
Year: 2004- 2005; Location: Rajasthan
Client: RSRDCL/RIDCOR
Main Project features: Development of the said projects on BOT basis under PPP framework
Position Held: Traffic cum Safety Engineer
Activities Performed:
Task assigned includes entire traffic studies including survey, data analysis, network assessment, traffic projection,
travel demand estimation, capacity augmentation, Commodity movement analysis, traffic management plan, Road
131
safety Management Plan etc. Suggested planning & strategies. Institutional structuring to implement plan and
development of various scenarios. Accident data analysis, accident study, carried out road safety audit, black spots,
road side features and suggested suitable improvement measures.
Name of the Project or assignment: Minor Improvements to National Highways,
(i) NH-8, Gurgaon – Amer (Km 42.000 to Km 248.000),
(ii) NH-2, Delhi - Agra (Km 18.800 to Km 199.600) and
(iii) NH-24, Moradabad Bypass (Km 148.430 to Km 166.650) sections
Name of the Project or assignment: Minor Improvements to National Highways,
(i) NH-1, Panipat – Jalandhar (Km 96.000 to Km 372.000),
(ii) NH-2, Barwa Adda – Panagarh (Km 398.400 to Km 515.200) and
(iii)NH-5, Chilakaluripet – Vijayawada (Km 355.000 to Km 434.150) Vijayawada – Eluru (Km 0.000 to Km 80.000)
sections.
Year: 2003- 2004
Location: Punjab, Andhra Pradesh, NCR, U.P.
Client: NHAI
Main Project features: Improvement of safety related aspects of the stretch
Position Held: Road Safety/ Traffic Engineer
Activities Performed: As a Road Safety/Traffic Engineer, Carried out Road safety audit during operational stage,
traffic studies including projection, road side improvements assessment, analysis and assist in preparation of
improvement measures and its implementation plan.
Name of the Project or assignment: Definition of Road Safety Policy and Development of Action plans to be
Implemented at National, State and City Level.
Year: 2003-2005
Location: India
Client: MOSRTH/World Bank
Main Project features: To develop policies for Class 1, 2 & 3 category cities within the state. in UP state
Position Held: Traffic cum Safety Engineer
Activities Performed: Task assigned includes road safety related data analysis, carried out road safety audit for
highway section of various categories, various accidents level analysis. Preparation of Road Safety Policies for Class
1, 2 & 3 category cities within the state. Suggested planning & strategies. Institutional structuring to implement plan.
Name of assignment or project: Comprehensive Traffic and Transportation Study for Mumbai & Pune City.
Main Project Features: Comprehensive study on Pune city (3million population appx) for entire transport related
aspects. Development of suitable proposal for mobility of traffic including pedestrian, public transport, IPT modes.
Development of Implementation framework in short, medium, long term
Year: 2002-2004
Client: Pune Municipal Corporation, India
Position Held: Transport Planner cum Project Manager (eqv. Traffic cum Safety Expert)
Location: Pune
Activity Performed: Task assigned includes conducting transport related surveys including Traffic Volume, OD,
Public transport, bus operation including boarding alighting, bus terminal, bus shelter, road inventory, bypasses,
goods terminal, parking, within the Municipal city limits, data analysis, ROBs, elevated roads, Flyovers, Street
furniture, pedestrian facilities demand assessment, Preparation of Traffic management plan, Road Safety Management
Plan, Bus system plan, ITS system planning, IPT plan, NMT plan including pedestrian, Finding Cost-estimation and
funding options of the improvement measures, phasing; Conducted workshops & stakeholder consultation.
Development of regional & urban development strategies; Modernization plan for Bus terminals/bus shelter, NMT
mobility strategies and suggesting alternate transport strategies and MRTS, develop a ‘road-map’ for the development
of mass transit system, development of action plans for implementing the high-priority project, Development of basic
concept and requirement for any government and/or private investments in mass transit system and other high priority
projects. Action plan to implement stage I projects and its development framework. Land use planning strategies to
steer, new developments of offices, schools, hospitals, etc. to points of maximum public transport accessibility (e.g.
interchange points) to reduce urban sprawl. Traffic exclusion from congested streets including congestion pricing,
pedestrian friendly schemes, area licensing schemes.
Name of the Project or assignment: Feasibility Study of Bridge over Yamuna River near Geeta Colony, New
Delhi.

132
Year: 2002- 2003
Location: India
Client: PWD,GNCT of Delhi,
Main Project features: Construction of new bridge across river Yamuna near Geeta Colony in Delhi
Position Held: Traffic cum Road Safety Engineer
Activities Performed: Task assigned includes study of accidents in the surrounding areas and suggested
improvement measures. Carried out Road Safety related aspects.
Name of the Project or assignment: Detailed Project Reports for State Roads on BOT/Private Sector
Participation in Chhattisgarh (pack-A, 342 km).
Year: 2001- 2003
Location: Chhattisgarh, India
Client: PWD, GoCh,
Main Project features: Development of projects to two lane standard on BOT basis including hill section of over
100 km.
Position Held: Transportation Engineer (Traffic & Safety Engr)
Activities Performed: Task assigned includes entire traffic studies including projection, junction improvement plan,
cost- estimation, involved in carrying out inventory surveys, geo- technical investigation, condition of road/ bridge,
analysis of data, planning of improvements measures etc
Name of the Project or assignment: Traffic and Environment Management Plan for Chandni Chowk Area, Delhi.
Year: 1999 – 2000
Location: Delhi
Client: MCD, Delhi
Position Held: Asst Transport Engineer
Activities Performed: As a transport Engineer, study of accidents in the surrounding areas and suggested
improvement measures. Carried out Traffic surveys and its analysis, accident data analysis for the purpose of Road
Safety related recommendation.
Expert’s contact information
Email: mashkur@masp.co.in; Mob: 9971224531
Certification:
I, the undersigned, certify to the best of my knowledge and belief, this CV correctly describes my qualifications and
my experience and I am available to undertake the assignment in case of an award. I understand that my
misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/
or sanctions by the Client.

Name of Expert Signature


Date

15.06.2023
Mashkur Ahmad

133
134
135
136
12.2 CV OF TRAFFIC PLANNER

1. Proposed position: Traffic Planner


2. Name: Upendra Kumar
3. Date of Birth: 20th January 1972
4. Nationality: Indian
5. Educational Qualifications:
• B.E. (civil) from Bangalore University (August 1998).
• Diploma in Construction Management from Annamalai University (May 2008)

6. Details of training course on Road Safety:


• Certificate course - Road safety and Road safety audit from IIT Delhi under auspices
guidance of IRC & MoRTH (March 2021).
• Training course of “Road Safety Engineering & Construction Safety” organized by RSC-
NHAI, held at Jaipur during July-2018.
• Training on “Road Safety Audit for PPP Projects on DBFO basis” organized by CRRI, New
Delhi at Jaipur in the month of August 2011.
• Laws and rules relating to Safety, Health and welfare of construction workers, organized by
IIT Delhi in year of 2009 at Lucknow, U.P.
• NEBOSH international general certificate course in occupational health and safety course
from arbit safety engineering solutions.
• Implementation of EMP during construction of National Highways, organized by World
Bank in year of 2002 at Bodh Gaya, Bihar.

7. Language & degree of proficiency:

Languages Speaking Reading Writing


English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent

8. Membership of Professional Societies:


• Life member of Indian Road Congress (LM-38650)

9. Countries of Work Experience: India


10. Name of the firm where working: M A Solutions Pvt. Ltd.
11. Years with the firm: October 2020 – Till Date
12. Employment Record:

➢ Name of Employer: M/s Ashok Grover & Associates, Noida (U.P) (01/09/1998-30/08/1999)
➢ Position Held: Field Engineer
➢ Description of duties: Construction supervision of industrial building, composite structure (Steel and
R.C.C.). Planning of execution the works, procurement of material, manage the site requirements

137
like deployment of contractor and machinery as planned. Interact with architect and structural
engineer for design and drawing details. Supervise the foundation work, RCC structure and steel
structure. Responsible for looking after safety measures at the site as per Industrial safety norms,
monitored all finishing item work like flooring, painting work and aesthetic view of building.

➢ Name of Employer: M/s Nila Bauart Engineering Ltd (04/09/1999 – 30/06/2000)


➢ Position Held: Safety Engineer
➢ Description of duties: Construction supervision of industrial building, composite structure (Steel and
R.C.C.). Planning of execution the works, procurement of material, manage the site requirements
like deployment of contractor and machinery as planned. Interact with architect and structural
engineer for design and drawing details. Supervise the foundation work, RCC structure and steel
structure. Responsible for looking after safety measures at the site as per Industrial safety norms,
monitored all finishing item work like flooring, painting work and aesthetic view of building.

➢ Name of Employer: M/s Maharishi Siksha Sansthan (19/05/2000 – 29/04/2002)


➢ Position Held: Senior Engineer
➢ Description of duties: Project in charge for the particular construction site of institutional building i.e.
campus of nine multi storied institutional and hostel buildings along with 33kv electrical Substation at
M.C.E.E. Bhopal. Technical inspection of all running/completed construction sites under state of
M.P. Checking and certified the interim payment and final bills of contractor Planning for execution
of proposed construction activities in time bound manner.

➢ Name of Employer: M/s STUP Consultants (P) Ltd. (02/05/2002 – 15/01/2007)


➢ Position Held: Environmental Engineer
➢ Description of duties: Responsible for the assessment of environmental impacts and monitoring
mechanism of Air, Water and Noise pollution during construction, solid waste management, working
out detailed enhancement plan for water bodies / cultural properties and mitigation measures. Ensure
effective implementation of EMP based on contract document and safety during construction. A
significant output in this project included the formulation of a methodology for Preliminary
Environmental and social screening of the environmental and social components. Responsible for
liaise with Government bodies to shift / removal of utility. Actively involved in the site safety, tree
cutting and compensatory plantation / median plantation / turfing in coordination with State Forest
Depts. Interact with different agencies like NGO’s, State Regulatory Authorities for effective
execution of R&R works.

138
➢ Name of Employer: LEA Associates South East Asia Pvt. Ltd. (16/01/2007 – 30/05/2010)
➢ Position Held: Environmental Engineer / Field Engineer (Highway)
➢ Description of duties: To look after day-to-day activity of highway section in consultation with HPE.
Supervision of all works/ activities of the said stretch (Earth work, GSB, WMM, DLC, PQC, DBM
and BC work etc.). Construction of high embankments along with its protection work, drainage work,
maintenance of the existing road in traffic worthy condition.

➢ Name of Employer: M/s STUP Consultants (P) Ltd. (16/06/2010 – 09/08/2014)


➢ Position Held: Senior Engineer (Highways) / Safety Engineer
➢ Description of duties: Assist Team Leader in all Highways and safety related issues.
Review the plan & profile drawing received from design consultant and get its approval from IE. To
guide all Senior Highway engineers of all 3 packages regarding quality and procedures of construction
and report to Team Leader along with CC to respective REs.
• To compile and review the daily progress of all 3 pkg. and report to TL.
• Assist client to get hindrances free site in terms of utility shifting work, tree cutting, shifting of
religious structures and land issues.
• Prepared and executed the traffic signs plan, project facilities and road furniture work according to
the project CA and IRC guidelines.
• Advise the Resident Engineers (Respective packages), on action to be taken to ensure proper
implementation of the mitigation measures as per EMP and compliances on general & specific
conditions of MOEF.
• Preparation of work site safety report, environmental compliance report of the MOEF as required
by the client on every six months.
• Prepared and submitted the safety plan of the project, site specific TMP to IE. Conducted
training/workshop on Road safety, work/camp site safety, traffic safety during construction for
workers/road users along with social awareness on road safety.
• Monitor the work site safety measures, site specific TMP and ensure the Safety Requirements of
CA (schedule L).

➢ Name of Employer: Modern Road Makers Pvt. Ltd. A Subsidiary of IRB Infrastructure Developers
Ltd. (11/08/2014 – 31/08/2017)
➢ Position Held: Safety Engineer / Highway Engineer
➢ Description of duties: To asses and monitor the implementations of Road safety measures, work site
safety on project highway/camp sites along with making of site-specific traffic management plan,
project safety plan, traffic diversion plan in accordance to CA/IRC guidelines and ensure to get it on
site by concerned project manager. Preparation of work site safety report, Monthly Accident Data (road
accident), suggest corrective measures as and when required with respect to work site
safety/environment management. Conduct the internal safety audit for project and training/awareness

139
to workers and road users on construction/Road safety. Review the drawings for road signs and other
road furniture works in conformity with relevant IRC and CA of the project.

➢ Name of Employer: Modern Road Makers A Subsidiary of IRB Infrastructure Developers Ltd.
(01/10/2017 – 30/09/2020)
➢ Position Held: Senior Engineer (Highways) / Safety Engineer
➢ Description of duties: To asses and monitor the implementations of Road safety measures, work site
safety on project highway/camp sites along with making of site-specific traffic management plan,
project safety plan, traffic diversion plan for both the packages i.e., KGBOT & CGBOT in accordance
to CA/IRC guidelines and ensure to get it on site by concerned project manager. Preparation of work
site safety report, Monthly Accident Data (road accident), suggest corrective measures as and when
required with respect to work site safety/environment management. Conduct the internal safety audit
for project and training/awareness to workers and road users on construction/Road safety.
Review the drawings for road signs, project facilities and road furniture work in consultation with
project design consultant and finalize the BOQ accordingly as per the CA.

➢ Name of Employer: M A SOLUTIONS PVT LTD (01/10/2020 – Till date)


➢ Position Held: Chief Traffic planner / Traffic & Transportation Expert
➢ Description of duties: Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(a) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal; Audit of Lighting Scheme;
• Audit of Roadside Hazards; Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by
construction workers
(c) Comprehensive Technical Review/Technical due diligence/ Technical Audit of the project stretch.

13. Overall Professional Experience in Highway /Traffic & Transportation/ Bridge


Engineering/Road Safety/Work Zone Safety etc. or in related field (in years in chronological
order starting from present position): 20 Years

14. Related Work Experience in Road Safety (in years): 12 Years

15. Details of the Related work Experience in Road Safety:

i) Name of the Project or assignment: Construction of various building structures (School, residential,
etc.) under the LOK JUMBISH PARIYOJNA in the state of Rajasthan
140
Year: 01/09/1998 - 30/08/1999
Location: Rajasthan
Client: Govt. of Rajasthan
Position Held: Field Engineer
Activities Performed: Interact with NGO and training given to local peoples regarding quality control,
safety measures during construction of building work. Collecting the data from villages to access the
requirement of schools for each block and review of existing school buildings for its enhancement.
Responsible for making drawings, estimation and its execution in association with villagers. Supervised
the construction of group housing society, approach and internal roads control site operations.

ii) Name of the Project or assignment: Extension of Indian Oil Corporation Ltd. Building, Bajwa
(Vadodara) in the state of Gujarat.
Year: 04/09/1999 - 30/06/2000
Location: Gujarat
Client: Govt. of Gujarat
Position Held: Safety Engineer
Activities Performed: Task Assigned Includes as a Safety Engineer cum Site Engineer, responsible
for looking after safety implementation at the site as per Industrial safety norms, attending seminars,
workshops and preparing safety reports. Also responsible for planning of execution of Civil of works
like structural foundation, pilling and common effluent treatment plant for I.O.C.L. extension project.

iii) Name of the Project or assignment: Construction of Maharishi Centre for Education Excellence i.e.
Campus of 7 Multi-storeyed building.
Year: 19/05/2000 – 29/04/2002
Location: Madhya Pradesh
Client: Maharishi Siksha Sansthan
Position Held: Senior Engineer
Activities Performed: Task Assigned Includes technical inspection of various sites all over M.P.,
verification of running and final bills Also supervision in-charge of the particular project at Bhopal
Planning for execution of proposed construction activities in time bound manner.

iv) Name of the Project or assignment: Construction supervision of 4 Laning from Afhapur to Khaga
(section between Kanpur & Allahabad) section of NH-2 in the state of Uttar Pradesh.
Year: 02/05/2002 – 15/01/2007
Location: Uttar Pradesh
Client: NHAI
Position Held: Environmental Engineer
Activities Performed: Task Assigned Includes as an Environmental Officer, I was responsible for the
assessment of environmental impacts and monitoring mechanism of Air, Water and Noise pollution
during construction, solid waste management, working out detailed enhancement plan for water bodies
/ cultural properties and mitigation measures for the environmentally sensitive locations and ensure
effective implementation of EMP based on contract document and safety during construction. A
significant output in this project included the formulation of a methodology for Preliminary
Environmental and social screening of the environmental and social components. Also responsible for
liase with Government bodies to shift / removal of utility. Actively involved in the site safety, tree
cutting and compensatory plantation / median plantation / turfing in co-ordination with State Forest
Depts. Interact with different agencies like NGOs, State Regulatory Authorities for effective execution
of R&R works.

v) Name of the Project or assignment: Construction supervision of 4 Laning from Lucknow to


Muzaffarpur section of NH-28 in the state of Uttar Pradesh
141
Year: 16/01/2007 - 30/05/2010
Location: Uttar Pradesh
Client: NHAI
Position Held: Environmental Engineer / Field Engineer (Highway)
Activities Performed: Task Assigned Includes Assist Team Leader / Resident Engineer in all
safety/environmental related issues. To asses and monitor the implementation of Environment
Management Plan based on contracts and also supervises all works related to EMP. Advise the Resident
Engineer on action to be taken to ensure proper implementation of the mitigation measures as per the
EMP Preparation of work site safety report, environmental monitoring report as required by the client
to meet the reporting requirements of the World Bank, the MOEF. Monitor the maintenance work of
existing highway, haul road to maintain the traffic in worthy condition. To take day-to-day problems on
account and suggest corrective measures as and when required with respect to work site safety
management. Implementation of safety measures, approval of site-specific traffic management plan and
ensure its implementation.
vi) Name of the Project or assignment: 4 Laning from Jaipur to Tonk - Deoli Section of NH-12 from KM
18.700 to KM 165.000 in the state of Rajasthan based on DBFOT
Year: 16/06/2010 - 30/07/2014
Location: Rajasthan
Client: NHAI
Position Held: Senior Engineer (Highways) / Safety Engineer
Activities Performed: Task Assigned Includes Assist Team Leader / Resident Engineer in all
safety/environmental related issues. To asses and monitor the implementation of Environment
Management Plan based on contracts and also supervises all works related to EMP. Advise the
Resident Engineer on action to be taken to ensure proper implementation of the mitigation measures
as per the EMP. Preparation of work site safety report, environmental monitoring report as required by
the client to meet the reporting requirements of the World Bank, the MOEF. Monitor the maintenance
work of existing highway, haul road to maintain the traffic in worthy condition. To take day-to-day
problems on account and suggest corrective measures as and when required with respect to work site
safety management. Implementation of safety measures, approval of site-specific traffic management
plan and ensure its implementation.

vii) Name of the Project or Assignment: Four laning of Kaithal-Rajasthan Border Section of NH-152/65
(from KM -0.500 to KM 165.759) in the State of Haryana on “DBFOT”
Year: 11/08/2014 - 31/08/2017
Location: Haryana
Client: NHAI
Position Held: Safety Engineer / Highway Engineer
Activities Performed: Task Assigned Includes Assist Team Leader / Resident Engineer in all
safety/environmental related issues. To asses and monitor the implementation of Environment
Management Plan based on contracts and also supervises all works related to EMP. Advise the
Resident Engineer on action to be taken to ensure proper implementation of the mitigation measures
as per the EMP Preparation of work site safety report, environmental monitoring report as required by
the client to meet the reporting requirements of the World Bank, the MOEF. Monitor the maintenance
work of existing highway, haul road to maintain the traffic in worthy condition. To take day-to-day
problems on account and suggest corrective measures as and when required with respect to work site
safety management. Implementation of safety measures, approval of site-specific traffic management
plan and ensure its implementation.

viii) Name of the Project or Assignment: Six laning of Kishangarg-Gulabpura-Chittorhgarh (KGBOT &
GCBOT) Section of NH-48 (from KM 0.000 to KM 214.870) in the State of Rajasthan on “DBFOT”.
Year: 01/10/2017 - 30/09/2020
142
Location: Rajasthan
Client: NHAI
Position Held: Senior Engineer (Highways) / Safety Engineer
Activities Performed: Preparation of work site safety report, Monthly Accident Data (road accident),
suggest corrective measures as and when required with respect to work site safety/environment
management.

ix) Name of the Project or Assignment: Safety Audit Services for Construction of Eight Lane
Carriageway starting near junction SH- 44 to junction with Keshopura Road (km115+700 to km
151+840) section of Delhi-Vadodara Greenfield Alignment (NH 148N) on EPC Mode under
Bharatmala Pariyojana in the state of Rajasthan)-Package-5
Year: 01/10/2020 - 22/12/2021
Location: Rajasthan
Client: NHAI
Position Held: Chief Traffic planner / Traffic & Transportation Expert
Activities Performed: Safety Audit during Design/construction Stage of the Project was carried out
under different stages detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;

x) Name of the Project or Assignment: Road Safety Audit Services for Construction of Six-lane access-
controlled Greenfield highway from km 90+000 to km 120+000 of Rasisar-Deogarh section of NH-
754K as a part of Amritsar-Jamnagar Economic Corridor (EC) in Rajasthan on EPC under Bharatmala
Pariyojana (Phase-I) (AJ/RD-Package-4)
Year: 02/11/2020 - 04/04/2022
Location: Rajasthan
Client: NHAI
Position Held: Chief Traffic planner / Traffic & Transportation Expert
Activities Performed: Audit during Design and Construction Stage of the Project carried out under
different stages as detailed below:
(b) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal; Audit of Lighting Scheme;
• Audit of Roadside Hazards; Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
143
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by
construction workers
(c) Comprehensive Technical Review/Technical due diligence/ Technical Audit of the project stretch

xi) Name of the Project or Assignment: Safety Consultancy Services for Construction of Eight Lane
Carriageway starting at the End approach of interchange on NH-552 (Tonk-Sawai Madhopur) near
village Nui and Ending at Hardevganj village near Indergarh (Ch. 292.950 - 319.400) section of Delhi-
Vadodara Access Controlled Green Field Alignment (NH-148N) under Bharatmala Pariyojana in the
state of Rajasthan on EPC mode- Package- 10.
Year: 01/12/2020 - Ongoing
Location: Rajasthan
Client: NHAI
Position Held: Chief Traffic planner / Traffic & Transportation Expert
Activities Performed: Audit during Design and Construction Stage of the Project would be carried out
under different stages as detailed below:
(c) Design Stage Safety Audit was carried out under various stages as detailed below:
• Audit of Comprehensiveness of Planning;
• Audit of Road Alignment Design; Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections; Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal; Audit of Lighting Scheme;
• Audit of Roadside Hazards; Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
(b) Construction Stage Safety Audit was of the project included
• Reviewing and approving the construction zone safety plans
• Reviewing and approving Traffic management and safety plans prepared by the contractor.
• Audit of Construction Area Management at site
• Audit of use of Safety Equipment i.e. Safety Helmet, Safety Jackets and Shoes etc. at site by
construction workers
(c) Comprehensive Technical Review/Technical due diligence/ Technical Audit of the project stretch

Date: 11th June 2023


Place: New Delhi

Upendra Kumar

144
13. CVs OF SUPPORT STAFF

13.1 CV OF Sr HIGHWAY CUM SAFETY ENGINEER

CURRICULUM VITAE
1. Proposed
Position: Sr Highway cum Safety Engineer
2. Name:
Md. Manower Alam
3. Date of Birth: June 19, 1996
4. Country of
Citizenship: India

5. Education: • Bachelor of Technology (Civil Engineering) -2018 (Dr. A P J Abdul Kalam


Technical University, Lucknow, Uttar Pradesh, India).
• 12th – 2013 from (K B Jha College, Katihar, BSEB Board)
• 10th – 2011 from (High School Barsoi, BSEB Board)
6. Software • AutoCAD
Knowledge: • Civil 3D
• MS Office
• Sketch up

• 15 days certification Training course on “Road Safety Audit and other Road Safety
related Aspects” from 15th to 30th November 2021, held at CSIR- Central Road
Research Institute, New Delhi.
• 15 days certification Training course on “Road Safety Engineering E-learning
7. Training &
Course developed by the European Bank for Reconstruction and Development”,
Seminar attended
June-2021. (Attached below)
• National Road Safety Month 2021 "Symposium for Safer Roads/ Discussion on
Plan for Rectification of Black Spots" (03rd & 04th February- 2021). (Attached
below)
• Traffic Engineering
8. Area of Interest • Road Safety Audit
• Highway / Railway Design
Mr. Manower Alam, Graduate in Civil Engineering has relevant professional experience
of 3.5 years in the area of Safety Engineering, other aspects of Highway projects. He has
been involved in multiple road safety audit projects involving different stages of Road
safety audit viz. Development stage (Design), Pre-construction stage, Construction stage,
9. Key Completion stage and Road safety audit for O/M stage. The Audit performed within the
Qualifications: guidelines of respective IRC or Manual on Road Safety Audit. he has worked on road as
a site visit, data collecting, prepared Safety Audit Report and inception report, installation
of signage many more. He has also very well conversant with all the relevant codes of
practice/guidelines of Road Congress (IRC).
He has also preparation of tender document.

10. Employment Record relevant to the assignment:

Period Employing organization and title/ Country


position.
July 2018 to till date M/s. M A Solutions Pvt. Ltd. India
(Highway cum Safety Engineer)
Language Speaking Reading Writing
English Good Good Good
11. Language Skills:
Hindi Good Good Good
Bangla Good Good Good
145
12. Adequacy for the assignment
Detailed Tasks Reference to prior Work/ Assignments that best illustrates capability to handle the
Assigned on assigned
Consultant’s Team of
Engineer
Task assigned Name of the Project or assignment: Construction of Eight lane carriageway starting near
includes junction with NH-76 to junction with NH-12 near village Ummedpura (km 388.420 to km
419.000) section of Delhi – Vadodara access controlled green field alignment (NH-148N)
Audit would be carried on EPC mode under Bharatmala Pariyojana in the state of Rajasthan (package-14).
out under different Year: 2020- ongoing
stages detailed below: Location: Rajasthan
Client: NHAI
• Audit of Main Project features: NHAI intends to develop the new alignment (green field).
Intersections; Position Held: Highway cum Safety Engineer
Activities Performed:
• Audit of Audit during design/ construction stage of the Project would be carried out under different
Road Signs; stages detailed below:
• Audit of
Pavement • Audit of Road Alignment Design;
Marking; • Audit of Proposed Cross Sections;
• Audit of • Audit of Interchanges/Intersections;
Lighting • Audit of Road Signs Proposal;
Scheme; • Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of
• Audit of Roadside Hazards;
Roadside
• Audit of Roadside Facilities Planned;
Hazards;
• Audit for Vulnerable Road Users;
• Guardrails,
Name of the Project or assignment: Construction of Eight lane carriageway start at the
Hedges and
end approach of Interchange on NH-116 at village Mhi and end at Hardevganj village near
Railings Indergrah (Km 292.950 to Km 319.400) section of Delhi – Vadodara access controlled
• Audit of bus- Green Field Alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in the
bays/truck State of Rajasthan (Package-10).
lay-byes Year: 2020-2022, ongoing
• Audit of Location: Rajasthan
Roadside Client: NHAI
Facilities Main Project features: NHAI intends to develop the new alignment (green field).
including Position Held: Highway cum Safety Engineer
crash Activities Performed:
Audit during design/ construction stage of the Project would be carried out under different
barriers; stages detailed below:
• Audit for • Audit of Road Alignment Design;
Vulnerable • Audit of Proposed Cross Sections;
Road Users;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
Name of the Project or assignment: Design and Construction/ Improvement of road
Rajouri -Thanamandi - Surankot on EPC mode from existing km 3+900 to km 56+951
(design km 3+900 to 59+420) [design length - 55.520 km] from existing IW / CL-9
specifications to NHDL specifications under 31 BRTF area under project Sampark in
Jammu & Kashmir (UT).
Year: 2021- ongoing
Location: Jammu & Kashmir
Client: BRO
146
Main Project features: BRO intends to improve in two-lane standard.
Position Held: Highway cum Safety Engineer
Activities Performed:
Audit during design/ construction stage of the Project would be carried out under different
stages detailed below:
• Audit of Road Alignment Design;
• Audit of Proposed Cross Sections;
• Audit of Interchanges/Intersections;
• Audit of Road Signs Proposal;
• Audit of Pavement Marking Proposal;
• Audit of Lighting Scheme;
• Audit of Roadside Hazards;
• Audit of Roadside Facilities Planned;
• Audit for Vulnerable Road Users;
Name of the Project or assignment: Construction of Eight Lane carriageway starting
near junction at SH-44 to junction with Keshopura road (Km 115+700 to km 151+840)
section of Delhi – Vadodara Greenfield alignment (NH-148N) on EPC mode under
Bharatmala Pariyojana in the state of Rajasthan (Pkg-5).
Year: 2020-21, Ongoing
Location: Rajasthan
Client: NHAI
Main Project features: NHAI intends to develop the of new alignment (green field).
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Design and Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Construction of Eight Lane carriageway at junction
with Keshopura road to junction with NH-11 (Km 151+840 to km 183+000) section of
Delhi – Vadodara Greenfield alignment (NH-148N) on EPC mode under Bharatmala
Pariyojana in the state of Rajasthan (Pkg-6).
Year: 2020-21, Ongoing
Location: Rajasthan
Client: NHAI
Main Project features: NHAI intends to develop the of new alignment (green field).
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Design and Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Rehabilitation & Up-Gradation of two lane flexible
pavement to 2 lanes with paved shoulders flexible pavement on Morena Ambah Porsa
road from km 254+370 to km 291+800 length of 31.48 km (excluding bypass from km
238+940 to km 254+370 & km 275+850 to 281+800) and conventional white topping
(inside Morena and Ambah city around which bypass has been proposed in length of 12.12
km) on Morena to Porsa section of newly declared NH-552 ext. In the state of Madhya
Pradesh.
Year: 2020-21
Location: M.P
Client: PWD (NH Division)
Main Project features: PWD (NH Division) intends to develop the of existing section.
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: pre- COD stage audit.
147
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Balance work for construction of 4 -Laning of
Barasat – Krishna nagar section of NH-34 from km 48+533 to km 115+000 (Length
66+720 km) pertaining to Nadia District in the state of West Bengal on EPC mode.
Year: 2020-21, ongoing
Location: West Bengal
Client: NHAI
Main Project features: NHAI intends to develop the of existing section.
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Design and Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Audit Services for rehabilitation and up-
gradation of Maheshkhunt – Saharsa – Purnea section on NH-107 from km 00+000 to km
90+000 in the state of Bihar on EPC mode (Pkg-1).
Year: 2020-22, ongoing
Location: Bihar
Client: NHAI
Main Project features: NHAI intends to develop the of existing section.
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Design and Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Audit Services For Four- Laning Of Akola
To Medshi From Km 0.000 To Km 47.700 (Design Chainage) Of Nh-161 Including
Bypasses At Patur And Medshi In The State Of Maharashtra On EPC Mode.
Year: 2021- ongoing
Location: Maharashtra
Client: NHAI
Main Project features: NHAI intends to develop the of existing section in 4- lane standard.
Position Held: Senior Highway cum Safety Engineer
Activities Performed:
Stages: Design and Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Construction of widening to 4 lane configuration of
Champadanga - Pursura - Arambagh road section of SH-2, in the district of Hooghly in
West Bengal, HPase-1 proposal from 0.00 km. To 11.90 km and 15.20 km to 19.626 km
(Total Length = 16.326 Km Excluding Muthadanga Bypass)
Year: 2020-22- ongoing
Location: West Bengal
Client: West Bengal Highway Development Corporation Ltd.
Main Project features: West Bengal Highway Development Corporation Ltd intends to
develop the existing section.
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Design and Construction stage audit.

148
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Audit Services For Widening To Two/ Four
Lane With Paved Shoulders From Km 0.00 To Km 54.370 (Maharashtra Border To Bidar)
Section Of Nh-50 In The State Of Karnataka On EPC Mode – Package I.
Year: 2021-22
Location: Karnataka
Client: PWD, Karnataka
Main Project features: PWD intends to develop the of 2 – lane to 4- lane standard.
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Pre- COD stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Consultancy services for Rehabilitation and
upgradation of Rishikesh-Dharasu road (NH-94) with 2lane with paved shoulder from Km
76.00 to Km 110.00 (Design Chainage from Km 74.733 to Km 107.347)(32.614 Km)
including construction of Kamand re-alignment from existing chainage Km 105.200 to
Km 108.600 (Design chainage from Km 103.436 to Km 105.949- total length 2513 mtrs)
and land slide treatment work between design chainage Km 73.800 to Km 74.00 (200 m)
on EPC mode under improvement to NH connectivity to Chardham in the state of
Uttarakhand.
Year: 2018-19
Location: Uttarakhand
Client: BRO
Main Project features: BRO intends to develop the of existing section to 2-lane standards.
Position Held: Asst. Highway Engineer
Activities Performed:
Stages: Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Consultancy services for improvement and
provision of additional safety measures for Gangotri – Dharasu (NH-108) from km
110.860 to 123.080 ( Design chainage from km 97.400 to km 109.458) on EPC mode
under improvement to NH connectivity to Chardham in the state of Uttarakhand.
Year: 2018-20
Location: Uttarakhand
Client: BRO
Main Project features: BRO intends to develop the existing section to 2-lane standards.
Position Held: Highway cum Safety Engineer
Activities Performed:
Stages: Construction and pre-COD stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Consultancy services for rehabilitation and
up-gradation of Rishikesh-Dharasu road (NH-94) with 2-Lane with paved shoulder from
design chainage km 58.603 to km 58.853 (Existing chainage km 59.420 to km 59.650),
from design chainage km 61.630 to km 63.950 (Existing chainage km 62.630 to km
65.000) and new construction of 2-Lane with paved shoulder Chamba Bypass of design
length 2.035 km including 440m long Tunnel on EPC mode under improvement to NH
connectivity to Chardham in the state of Uttarakhand.
149
Year: 2018-20
Location: Uttarakhand
Client: BRO
Main Project features: BRO intends to develop the existing section to 2-lane standards.
Position Held: Asst. Highway Engineer
Activities Performed:
Stages: Construction and pre-COD stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Consultancy services for safety audit of
Highway for Six laning of Chittorgarh- Udaipur section of NH-76 from design chainage
Km 214.870 to Km 308.370 in the state of Rajasthan (length 93.5 km) on DBFOT (toll)
mode under NHDP Phase V (Package-III).
Year: 2019-20
Location: Rajasthan
Client: Uchit Expressway limited
Main Project features: The project section to be develop to six laning configuration under
BOT framework.
Position Held: Asst. Highway Engineer
Activities Performed:
a. Consultants shall carry out the construction stage audit during day and night and
assess the safety measures exists/provided.
b. Confirm the adequacy of safety measures adopted on project highway including
construction locations.
c. Site visit, data collecting and prepared Safety Audit Report.
Name of the Project or assignment: Safety Consultancy Services “Four Laning of Solan-
Kaithilghat section of NH-22 (Now NH-5) from km 106.00 to km129.050 on EPC mode
in the state of Himachal Pradesh under NHDP Phase-III”.
Year: 2018-20, ongoing; Location: H.P.
Client: NHAI
Main Project features: NHAI intends to develop the of existing section.
Position Held: Asst. Highway Engineer
Activities Performed:
Stages: Design and Construction stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.
Name of the Project or assignment: Safety Consultancy Services for Rehabilitation and
up gradation of existing 2 lane to 4-lane standards of Rimuli-Koida Section (Km.163.00
to Km.206.200) of NH-215 (New NH -520) in the State of Odisha under NHDP Phase
III on EPC mode”.
Year: 2018-19,2020-21
Location: Odisha
Client: NHAI.
Main Project features: NHAI intends to develop the existing 2 lane to 4-lane standards.
Position Held: Asst. Highway Engineer
Activities Performed:
Stages: Construction and pre-COD stage audit.
Responsible for coordinating site visit, data collection, monitoring and managing projects
activities, planning field surveys, review of drawings on safety aspects, data analysis on
various aspects of road safety audit, recommendations based on various IRC codes and
safety manuals, prepared Safety Audit Report.

Contact information Email: manower543@gmail.com; Mob: +91-7011128273

150
Certification :
I, the undersigned, certify to the best of my knowledge and belief, this CV correctly describes my qualifications and
my experience and I am available to undertake the assignment in case of an award. I understand that my
misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/
or sanctions by the Client.

Name – Md. Manower Alam

Signature
Date – 06.01.2022

151
152
14. GEOGRAPHICAL REACH OF OUR SERVICES

153
15. LIST OF EMPANELMENT

EMPANELLED IN THE AREA OF ROAD SAFETY AUDIT SERVICES FOR NHAI


PROJECTS

RURAL WORKS DEPARTMENT, GOVT OF BIHAR FOR PREPARATION OF DPR


OF HIGHWAYS/BRIDGES

ADB TA No. 8765-IND: Supporting Sustainable Urban Transport in Aizawl City – 1


(48356-001) (with Vicroads- Australia)

ADB TA-8760 IND: Supporting Kerala's Additional Skill Acquisition Program in Post-
Basic Education - 1 Firm (47334-002) (with Development Strategies International Inc.-
Philippines)

ADB LOAN-4166-IND-ASSAM Skill University (ASU) Management and Operating


System Development, India (with Inno-Change International Consultants, Inc.,
Philipines & Queensland University of Technology, Australia)

REGIONAL CENTRE FOR URBAN & ENVIRONMENT STUDIES (RCUES); GOVT


OF INDIA- for Transport and Road Safety related services

FEASIBILITY STUDY AND PROJECT PREPARATION FOR INTEGRATED


CORRIDOR MANAGEMENT PROJECT (ICMP) (DNCC PART) IN BANGLADESH

154
16. PAN CARD OF MASP

155
17. CERTIFICATE OF REGISTRATION OF GST

156
18. UDYOG AADHAR REGISTRATION CERTIFICATE

157
158
19. CAPACITY BUILDING & TRAINING ON ROAD SAFETY AUDIT (BY
MASP) TO GOVERNMENT ENGINEERS/OFFICERS ACROSS INDIA

TRAINING GIVEN TO PWD, RAJASTHAN ENGINEERS AT MNIT JAIPUR THROUGH AITD, 6TH FEB, 2019

TRAINING GIVEN TO PWD, UTTARAKHAND ENGINEERS AT AITD, NEW DELHI, 28 TH FEB, 2019

159
TRAINING GIVEN TO RCD, BIHAR SENIOR ENGINEERS AT TTRI, RCD, PATNA, 9 TH MAY, 2019

TRAINING GIVEN TO PUBLIC WORK DEPARTMENT (PWD), GOVT. OF MANIPUR, IMPHAL, 12 TH JUNE, 2019

160
TRAINING GIVEN TO PWD ENGINEERS OF VARIOUS STATES (UP, PUNJAB, HP, Raj) IN AITD HQ, DELHI ON
22ND JULY, 2019

TRAINING GIVEN TO PWD ENGINEERS OF HP, UK, PUNJAB AT AITD HQ, DELHI ON 9TH SEPT, 2019

161
TRAINING GIVEN TO GOA PWD/MoRTH ENGINEERS IN GOA ON 14 TH OCT, 2019

TRAINING GIVEN TO PWD ENGINEERS OF HP, AP, UP AT AITD HQ, DELHI ON 11 TH NOV, 2019

162
TRAINING GIVEN TO PWD ENGINEERS OF VARIOUS STATES IN AITD HQ, DELHI ON 16 TH DEC, 2019

163
19.1 TRAINING LETTERS

TRAINING LETTERS (ASIAN INSTITUTE OF TRANSPORT DEVELOPMENT)

164
TRAINING LETTERS (RCD, BIHAR)

165
166
LECTURE ON PPP AT JMI, NEW DELHI

167
168

You might also like